• Installation of new landscaping features to provide screening using topographic,<br />
hardscape, additional trees, and bushes.<br />
2.0 Findings Regarding Independent Review and Judgment<br />
Each member of the EBMUD Board of Directors was provided access to copies of the MND and<br />
the MMRP. The MND was made available for public comment, and no comments were received<br />
during the public review period.<br />
The Board hereby finds that the MND reflects the Board's independent judgment and analysis.<br />
The EBMUD Board also finds that it has independently reviewed, considered and analyzed the<br />
Initial Study, the MND, and the MMRP prior to taking any final action with respect to the<br />
proposed project.<br />
3.0 Findings Regarding the Project<br />
Having received and considered the information contained in the Initial Study, MND, and<br />
MMRP, the EBMUD Board of Directors hereby adopts the following findings regarding the<br />
Project.<br />
3.1 Findings Regarding Less than Significant Effects<br />
A. Aesthetics<br />
Impact: Less than Significant with Mitigation Incorporated.<br />
Findings: There will be a change to the visual site character due to the removal of the<br />
existing 2.25 acre 39th Avenue Reservoir roof structure. The views from the streets and<br />
surrounding residences into the site will be improved due to incorporation of measures to<br />
landscape the entire reservoir bowl and partially buried tank with grasses, wild flowers,<br />
shrubs and trees, to provide continuity with existing site landscaping. Therefore, visual<br />
changes resulting from construction of this reservoir project would be minimal and<br />
considered Less than Significant. Mitigation measures are identified as Mitigation<br />
Measure AES-1 in the MND and MMRP.<br />
Facts in Support of Findings: Measure AES-1 requiring civil and landscape plans is<br />
hereby incorporated and imposed and shall be monitored in compliance with the MMRP.<br />
Because EBMUD has agreed to this mitigation, any aesthetic impacts have been avoided<br />
or will be reduced to a Less than Significant level.<br />
As a result of these project mitigations, the Project will have Less than Significant<br />
aesthetic impacts.<br />
B. Air Quality<br />
Impact: Less Than Significant with Mitigation Incorporated