• Installation of new landscaping features to provide screening using topographic,<br />

hardscape, additional trees, and bushes.<br />

2.0 Findings Regarding Independent Review and Judgment<br />

Each member of the EBMUD Board of Directors was provided access to copies of the MND and<br />

the MMRP. The MND was made available for public comment, and no comments were received<br />

during the public review period.<br />

The Board hereby finds that the MND reflects the Board's independent judgment and analysis.<br />

The EBMUD Board also finds that it has independently reviewed, considered and analyzed the<br />

Initial Study, the MND, and the MMRP prior to taking any final action with respect to the<br />

proposed project.<br />

3.0 Findings Regarding the Project<br />

Having received and considered the information contained in the Initial Study, MND, and<br />

MMRP, the EBMUD Board of Directors hereby adopts the following findings regarding the<br />

Project.<br />

3.1 Findings Regarding Less than Significant Effects<br />

A. Aesthetics<br />

Impact: Less than Significant with Mitigation Incorporated.<br />

Findings: There will be a change to the visual site character due to the removal of the<br />

existing 2.25 acre 39th Avenue Reservoir roof structure. The views from the streets and<br />

surrounding residences into the site will be improved due to incorporation of measures to<br />

landscape the entire reservoir bowl and partially buried tank with grasses, wild flowers,<br />

shrubs and trees, to provide continuity with existing site landscaping. Therefore, visual<br />

changes resulting from construction of this reservoir project would be minimal and<br />

considered Less than Significant. Mitigation measures are identified as Mitigation<br />

Measure AES-1 in the MND and MMRP.<br />

Facts in Support of Findings: Measure AES-1 requiring civil and landscape plans is<br />

hereby incorporated and imposed and shall be monitored in compliance with the MMRP.<br />

Because EBMUD has agreed to this mitigation, any aesthetic impacts have been avoided<br />

or will be reduced to a Less than Significant level.<br />

As a result of these project mitigations, the Project will have Less than Significant<br />

aesthetic impacts.<br />

B. Air Quality<br />

Impact: Less Than Significant with Mitigation Incorporated