4. The potential environmental impacts of the Project are fully disclosed in the MND, and said<br />
MND is adequate for use by EBMUD for the approval, design, and implementation of the<br />
Project.<br />
5. The Board of Directors makes the findings and determinations regarding the proposed<br />
Project set forth in the Board's Findings Regarding the Project, attached hereto as Exhibit A<br />
and incorporated herein by this reference.<br />
6. The Board of Directors hereby approves, adopts, and imposes the MMRP attached hereto as<br />
Exhibit B. The mitigation measures adopted by the Board in its Findings are hereby<br />
incorporated into the Project.<br />
7. The documents and materials constituting the record of this proceeding are located at<br />
EBMUD's administrative offices, 375-11 th Street, Oakland, CA 94607. The custodian of said<br />
records is the Secretary of the <strong>District</strong>.<br />
8. In the preparation of the MND, every effort has been made to utilize the best information<br />
available and to incorporate new information as it became available, including information<br />
obtained from the public and from other agencies.<br />
9. No substantial changes in circumstances have occurred since preparation of the MND which<br />
would require revisions to the MND or consideration of a full Environmental Impact Report<br />
(EIR) due to the discovery or disclosure of new significant environmental impacts not<br />
covered in the MND, and there is no requirement to recirculate the MND or prepare an EIR.<br />
BE IT FURTHER RESOLVED that in accordance with CEQA, the Board determines that<br />
impacts identified in the MND as potentially significant have been reduced to a less than<br />
significant level because EBMUD has made or agreed to Project revisions and/or mitigation<br />
measures. EBMUD, acting as lead agency, has therefore determined that a<br />
Mitigated Negative Declaration is appropriate for this Project.<br />
BE IT FURTHER RESOLVED that based on the whole record before it, including the<br />
Initial Study, the Board of Directors finds that there is no substantial evidence that the<br />
Project will have a significant effect on the environment. Therefore, the MND, including the<br />
MMRP, is hereby approved as having been completed in compliance with CEQA.<br />
BE IT FURTHER RESOLVED that the Project, as described in said MND, is hereby approved<br />
and the General Manager is hereby directed to take such actions as shall be necessary to<br />
implement this determination to carry out the Project.