29.01.2015 Views

Planners Report.pdf - Hutt City Council

Planners Report.pdf - Hutt City Council

Planners Report.pdf - Hutt City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Compliance with this performance standard shall be achieved by ensuring<br />

habitable rooms are designed and constructed in a manner that:<br />

(a) accords with the schedule of typical building construction set out in<br />

Appendix Central Commercial 7 – Noise Insulation Construction<br />

Schedule; or<br />

(b) accords with an acoustic design certificate signed by a suitably<br />

qualified acoustic engineer stating the design as proposed will<br />

achieve compliance with the above performance standard.<br />

[1 DnT,w + Ctr is the standardised level difference (outdoor to indoor) and<br />

is a measure of the airborne sound insulation provided by the external<br />

building envelope (including windows, walls, ceilings and floors where<br />

appropriate)].<br />

Traffic<br />

12. That a minimum of six on-site parking spaces shall be provided.<br />

13. All servicing of the retail stores on 350 Jackson Street and 43 Tory Street shall<br />

be undertaken from the on-site car parking area and shall occur between the<br />

hours of 8am and 6pm.<br />

Lighting<br />

14. There shall be no lights on the site positioned in a manner which will shine<br />

directly into any of the neighbouring residential properties.<br />

15. Any lightspill from the site shall not exceed 8 lux when measured at the<br />

residential boundaries of the site.<br />

Privacy<br />

16. Prior to the commencement of construction, the consent holder shall submit<br />

plans for approval that show the proposed positioning or treatment of windows<br />

on the south-facing façade. The location of the windows shall take into account<br />

the privacy effects of the residential properties to the south. This plan is to be<br />

considered by the Team Leader, Resource Consents.<br />

Rubbish collection<br />

17. Rubbish collection shall only occur between the hours of 8am and 6pm.<br />

Wall materials<br />

18. Prior to the commencement of construction, the consent holder shall submit a<br />

design for the roof top balustrades and the louvers on the principal facades to<br />

be considered by the Team Leader, Resource Consents.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!