at least 48 hours prior to any physical work commencing on the site and advise<br />

the Officer the following:<br />

• The date the work shall commence;<br />

• The name of the contractor(s) and their contact details including phone<br />

number and postal address; and<br />

• The contact details for who will be carrying out the earthworks.<br />

2. Once work commences on the site, a copy of this resource consent decision<br />

shall be available on site at all times and made available upon request.<br />

3. On completion, the proposal must be in general accordance with the information<br />

and drawings submitted with this application and held on the property file for<br />

350 and 352 Jackson Street and 43 Tory Street (Drawings entitled: ‘Preliminary<br />

Study, 350 – 352 Jackson Street, Coast Edge Limited, pages 0.1, 0.2, 0.3, 2.3<br />

and 2.11 dated September 2011 and 2.2, 2.4, 2.5, 2.6, 2.7, 2.8 dated 19<br />

December 2011 and Option C dated 19 December 2011. Further information is<br />

held on the Insol Ltd document titled Solaris End Fixing – 110mm Blade Size,<br />

page ss) 7 and the LouverTec document titled 125 Louverline Weatherboard<br />

Panel Centre of Blade Pivot, page 5.06).<br />

Construction<br />

4. Prior to the commencement of any site development works on the site, the<br />

consent holder shall submit a Construction Management Plan to the <strong>Council</strong>, for<br />

the approval of the Team Leader Resource Consents. This Construction<br />

Management Plan shall contain the following information:<br />

• Details of the sediment and dust control measures to be implemented on<br />

site;<br />

• The measures which will be adopted to mitigate any resulting effects<br />

from construction traffic;<br />

• The measures which will be adopted to mitigate any resulting effects<br />

from noise; and<br />

• The measures which will be adopted to mitigate any resulting effects<br />

from vibration.<br />

All construction works (and associated activities) shall be undertaken in<br />

accordance with the approved Construction Management Plan.<br />

5. All development and construction shall be undertaken in such a manner as to<br />

comply with the provisions of NZS 6803:1999 Acoustics – Construction Noise.<br />

6. If Taonga (treasure or prized possession, including a natural resource, having<br />

tangible value) is discovered in any part of the site, the consent holder is to<br />

contact the Tenths Trust on 04 473 2502, the New Zealand Historic Places