Appendix A<br />

Response: The text in Section 8.2.5 of the SEIS has been changed based on the information<br />

provided in this comment.<br />

Comment: Page E-2, Line 4: The US Fish and Wildlife Service Migratory Bird Treaty Act<br />

Permit was reissued on 04/01/2006. Authorization information is as follows: Number<br />

MB074020-0, Expiration Date: 03/31/09. (F-26)<br />

Comment: Page E-2, Line 10: The MNDNR Division of Fish and Wildlife Special Permit was<br />

reissued on 11/21/2005. Authorization information is as follows: Number 13315, Expiration<br />

Date: 12/31/06. (F-27)<br />

Comment: Page E-4, Line 24: Remove "NYDSEC: New York State Department of<br />

<strong>Environmental</strong> Conservation"--not relevant to discussion. (F-28)<br />

Comment: Page E-4, Line 3: The South Caroline Radioactive Waste Transport Permit was<br />

reissued for 2006. Authorization information is as follows: Number 0026-22-06-Y, Expiration<br />

Date: 12/31/06. (F-29)<br />

Comment: Page E-4, Line 8: The Tennessee Radioactive Shipment License was reissued for<br />

2006. Authorization information is as follows: Number T-MN-002-L06, Expiration Date:<br />

12/31/06. (F-30)<br />

Response: The text in Appendix E of the SEIS has been changed based on the information<br />

provided in these comments.<br />

Comment: Page G-23, Line 18: Replace "$1.1 x1 09" with "$1.1 x 109." (F-31)<br />

Response: The text in Appendix G of the SEIS has been changed based on the information<br />

provided in this comment.<br />

A.2.19<br />

Comments Concerning Issues Outside the Scope of License Renewal: Aging<br />

Management and Independent Spent Fuel Storage Installation (ISFSI)<br />

Aginq Management<br />

Comment: The Monticello plant has been extremely well maintained over its lifetime, ensuring<br />

it can operate safely for at least an additional twenty years beyond the original operating license<br />

period. Approximately every two years, we perform a refueling and major maintenance outage<br />

in which we typically carry out over 2500 individual maintenance and inspection activities. This<br />

is in addition to the ongoing maintenance, inspection, and rigorous testing activities that are<br />

performed routinely during the period of plant operation.<br />

We have continued to invest in a wide range of equipment improvements to take advantage of<br />

technology and materials to ensure future reliable and safe operation, and this is relevant to the<br />

NUREG-1437, Supplement 26 A-58 August 2006 I