<strong>Environmental</strong> <strong>Impact</strong>s of Alternatives<br />

NSP would be required to shut down Monticello and to comply with NRC decommissioning<br />

requirements in 10 CFR 50.82 whether or not the OL is renewed. If the Monticello OL is<br />

renewed, shutdown of the unit and decommissioning activities will not be avoided, but will be<br />

postponed for up to an additional 20 years.<br />

The environmental impacts associated with decommissioning following a license renewal period<br />

of up to 20 years or following the no-action alternative would be bounded by the discussion of<br />

impacts in Chapter 7 of the license renewal GElS (NRC 1996), Chapter 7 of this supplemental<br />

environmental impact statement (SEIS), and the Final Generic <strong>Environmental</strong> <strong>Impact</strong> <strong>Statement</strong><br />

on Decommissioning of Nuclear Facilities, NUREG-0586, Supplement 1 (NRC 2002). The<br />

impacts of decommissioning after 60 years of operatiorh are not expected to be significantly<br />

different from those occurring after 40 years of operation.<br />

<strong>Impact</strong>s from the decision to permanently cease operations are not considered in<br />

NUREG-0586, Supplement 1.(a) Therefore, immediate impacts that occur between plant<br />

shutdown and the beginning of decommissioning are considered here. These impacts, which<br />

will occur when the unit permanently shuts down regardless of whether the license was to be<br />

renewed or not, are discussed below, with the results presented in Table 8-1. Plant shutdown<br />

will result in a net reduction in power production capacity. The power not generated by<br />

Monticello during the license renewal term would likely be replaced by (1) power purchased<br />

from other electricity providers, (2) generating alternatives other than Monticello, (3)<br />

demand-side management (DSM) and energy conservation, or (4) some combination of these<br />

-options. The environmental impacts of these options are discussed in Section 8.2.<br />

* Land Use<br />

In Chapter 4, the staff concluded that the impacts on land use of continued plant operation<br />

during the renewal term would be SMALL. Onsite land use will not be affected immediately by<br />

the cessation of operations. Plant structures and other facilities are likely to remain in place<br />

until decommissioning. The transmission lines associated with the project would be expected to<br />

remain in service after the plant stops operating. As a result, maintenance of the transmission<br />

corridors will continue as before. Therefore, the staff concludes that the impacts on land use<br />

from plant shutdown would be SMALL.<br />

(a) Appendix J of NUREG-0586 Supplement I discusses the socioeconomic impacts of plant closure, but the results<br />

of the analysis in Appendix J are not incorporated in the analysis presented in the main body of the NUREG.<br />

NUREG-1437, Supplement 26 8-2 August 2006. 1