Installation Assessment MP4 Methodology www.eastmed.schneider-electric.com Step 1 Specify your electrical energy needs and assess your current capabilities @ Understand your process & quantify your risks @ Identify the critical points in your process @ Make the link with the electrical network, and pinpoint the devices or busbars that could trigger these high-risk events @ Locate the main energy consumption points @ Understand your current and future operations & maintenance organisation and capabilities Example of process modelization and critical points Step 2 Assess equipment and evaluate network robustness @ For each set of equipment, build a stress indicator based on: _ environmental conditions (humidity, temperature, salinity, etc.) _ operating conditions (load rate, number of operations, etc.) _ equipment ageing @ Carry out a reliability study to evaluate the robustness of network design with regards to the critical points identified in Step 1 @ Classify each set of equipment according to its contribution to the probability of occurrence of the unwanted events Example of equipment assessment Example of electrical risk identification Example of reliability calculation Dis_Valti1_P63 Dis_Valti2_P63 Dis_Valix_P63 Dis_ATM_P63 Dis_Filag_P63 CM_Bat1_P63 CM_Bat2_P63 IM_Arv_VN TM_VN Dis_TGL_VN DisBT_S_Drev DisBT_N_Drev JDBbt_Lam_TGL CabBT_TGL_Drev CabBT_TGL_Lam EDF, Dis_EDF_P63 Zz_Cab_63kV JDB_63kV_P63 TR1_63kV TR2_63kV Dis_TR1_P63 JDB_5kV_P63 Cab_P63_VN Cab_TR1_P63 JDB_5kV_VN Cab_VN_trTIV DisBT_geTIV CabBT_TR1_TGL CabBT_TR2_TGL CabBT_TR3_TGL ... Reliability Level Low Medium High
MP4 Methodology Step 3 Rate criticality levels Combine stress and reliability levels to rate the criticality of each set of equipment and define the appropriate service policy: @ Critical equipment (predictive maintenance, emergency recovery plan, upgrading action, etc.) @ Major equipment (preventive maintenance, etc.) @ Minor equipment (periodic inspection, etc.) Example of criticality matrix Step 4 Draw up plans and share conclusions Based on the outputs of Step 3, the following deliverables are consolidated: @ List of critical safety issues @ Upgrading actions necessary to restore nominal installation performance @ 4 plans to: _ Optimise your operating expenditure (Maintenance Plan) _ Improve your performance (Modernisation and Monitoring Plans) _ Track the implementation of actions including training, spare parts management, recovery plan, etc, (Management Plan). The priority of each recommendation and its economic balance sheet are assessed @ Formal presentation of conclusions and recommendations to ensure good understanding and buy-in by all parties involved
- Page 1 and 2: Schneider Electric East Mediterrane
- Page 3: Installation Assessment MP4 Methodo
- Page 7 and 8: Installation Assessment Network Con
- Page 9 and 10: Asset Management Program Emergency
- Page 11 and 12: Asset Management Program Medium Vol
- Page 13 and 14: Asset Management Program Predictive
- Page 15 and 16: Predictive maintenance with shut-do
- Page 17 and 18: On-Demand Maintenance Electrical Ma
- Page 19 and 20: On-Demand Maintenance Electrical Ma
- Page 21 and 22: On-Demand Maintenance Transformer M
- Page 23 and 24: Schneider Electric Services Retrofi
- Page 25 and 26: Modernization Presentation of the o
- Page 27 and 28: Modernization Renovation, retrofit
- Page 29 and 30: Modernization Renovation, retrofit
- Page 31 and 32: Modernization Renovation, retrofit
- Page 33 and 34: Modernization Renovation, retrofit
- Page 35 and 36: Modernization Renovation, retrofit
- Page 37 and 38: Monitoring and protecting your low
- Page 39 and 40: Electrical Management Services Ener
- Page 41 and 42: Technical education Educational Sol
- Page 43 and 44: 4 Electrical Energy Distribution El
- Page 45 and 46: Educational Solutions Electrical In
- Page 47 and 48: Educational Solutions Energy Effici
- Page 49 and 50: Educational Solutions Energy Effici
- Page 51 and 52: Educational Solutions Data Acquisit
- Page 53 and 54: Educational Solutions Data Acquisit
MP4 Methodology<br />
Step 3<br />
Rate criticality levels<br />
Comb<strong>in</strong>e stress and reliability levels to rate<br />
<strong>the</strong> criticality of each set of equipment and<br />
def<strong>in</strong>e <strong>the</strong> appropriate service policy:<br />
@ Critical equipment<br />
(predictive ma<strong>in</strong>tenance, emergency recovery<br />
plan, upgrad<strong>in</strong>g action, etc.)<br />
@ Major equipment<br />
(preventive ma<strong>in</strong>tenance, etc.)<br />
@ M<strong>in</strong>or equipment<br />
(periodic <strong>in</strong>spection, etc.)<br />
Example of criticality matrix<br />
Step 4<br />
Draw up plans and share conclusions<br />
Based on <strong>the</strong> outputs of Step 3, <strong>the</strong> follow<strong>in</strong>g deliverables are consolidated:<br />
@ List of critical safety issues<br />
@ Upgrad<strong>in</strong>g actions necessary to restore nom<strong>in</strong>al <strong>in</strong>stallation performance<br />
@ 4 plans to:<br />
_ Optimise your operat<strong>in</strong>g expenditure (Ma<strong>in</strong>tenance Plan)<br />
_ Improve your performance (Modernisation and Monitor<strong>in</strong>g Plans)<br />
_ Track <strong>the</strong> implementation of actions <strong>in</strong>clud<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g, spare parts<br />
<strong>management</strong>, recovery plan, etc, (Management Plan). The priority of<br />
each recommendation and its economic balance sheet are assessed<br />
@ Formal presentation of conclusions and recommendations to ensure<br />
good understand<strong>in</strong>g and buy-<strong>in</strong> by all parties <strong>in</strong>volved