14.11.2012 Views

new - the global specialist in energy management - Schneider Electric

new - the global specialist in energy management - Schneider Electric

new - the global specialist in energy management - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Schneider</strong> <strong>Electric</strong> East Mediterranean<br />

Services Catalogue<br />

Guarantee your Peace of M<strong>in</strong>d!


Catalogue Index<br />

Chapter - 1<br />

Installation<br />

Assessment<br />

Chapter - 2<br />

Asset<br />

Management<br />

Program<br />

Chapter - 3<br />

On-Demand<br />

Ma<strong>in</strong>tenance<br />

Chapter - 4<br />

Modernization<br />

Chapter - 5<br />

<strong>Electric</strong>al<br />

Management<br />

Services<br />

Chapter - 6<br />

Educational<br />

Solutions<br />

Chapter - 7<br />

Automation<br />

Services<br />

Chapter - 8<br />

Critical Power<br />

& Cool<strong>in</strong>g Services<br />

www.eastmed.schneider-electric.com<br />

> MP4 Methodology<br />

A plant wide electrical assessment<br />

> Network consult<strong>in</strong>g<br />

Technical Study<br />

> Emergency On-site Intervention<br />

Reduce your breakdown time with <strong>in</strong>tervention by an expert<br />

with<strong>in</strong> a contractual time scale<br />

> Preventive Ma<strong>in</strong>tenance<br />

Optimize <strong>the</strong> level of performance of your <strong>in</strong>stallation<br />

> Predictive Ma<strong>in</strong>tenance<br />

Anticipate future breakdowns thanks to regular diagnosis<br />

of your equipment<br />

> Spare Parts<br />

Reduce your breakdown times by hav<strong>in</strong>g a guaranteed delivery time<br />

for spare parts<br />

> <strong>Electric</strong>al Ma<strong>in</strong>tenance Contracts<br />

Master<strong>in</strong>g your equipment ma<strong>in</strong>tenance optimizes<br />

<strong>the</strong> availability of your facilities<br />

> Transformer Ma<strong>in</strong>tenance Services<br />

Different packs to diagnosis <strong>the</strong> health of your transformers<br />

> Retrofit<br />

Retrofit on switchgear and protection devices<br />

> Plug & Play<br />

Retrofit on NW low voltage circuit breakers<br />

> Energy Sav<strong>in</strong>g<br />

Make <strong>the</strong> most of your <strong>energy</strong> SM<br />

> Educational Solutions<br />

The Tra<strong>in</strong><strong>in</strong>g Catalogue is now available!<br />

Contact your local Customer Care Centre<br />

to order your copy or download it at:<br />

www.eastmed.schneider-electric.com<br />

> Automation Systems<br />

Improve <strong>the</strong> reliability and availability of your equipment<br />

> APC InfrastruXure TM<br />

Services to keep your mission-critical applications operat<strong>in</strong>g<br />

at optimal performance<br />

T ra<strong>in</strong><strong>in</strong>g by <strong>Schneider</strong> <strong>Electric</strong>,<br />

mak<strong>in</strong>g you more competitive<br />

Course Catalogue<br />

East Mediterranean Countries | 2010 - 2011


Installation Assessment<br />

MP4 Methodology<br />

A plant wide electrical assessment<br />

MP4 consult<strong>in</strong>g services shed light<br />

on your <strong>in</strong>stallation!<br />

Maximise production levels<br />

by <strong>in</strong>creas<strong>in</strong>g <strong>in</strong>stallation availability and quality<br />

Improve your OPEX by provid<strong>in</strong>g a roadmap<br />

to optimise your operations and ma<strong>in</strong>tenance<br />

Prioritise your electrical <strong>in</strong>stallation <strong>in</strong>vestments<br />

and optimise your CAPEX<br />

Increase safety reduce levels of electrical risks<br />

Predict failures & act before <strong>the</strong>y happen<br />

Replicate some or all recommendations on o<strong>the</strong>r sites<br />

with<strong>in</strong> your organisation<br />

www.eastmed.schneider-electric.com


Installation Assessment<br />

MP4 Methodology<br />

www.eastmed.schneider-electric.com<br />

Step 1<br />

Specify your electrical <strong>energy</strong><br />

needs and assess your current<br />

capabilities<br />

@ Understand your process & quantify your<br />

risks<br />

@ Identify <strong>the</strong> critical po<strong>in</strong>ts <strong>in</strong> your process<br />

@ Make <strong>the</strong> l<strong>in</strong>k with <strong>the</strong> electrical network,<br />

and p<strong>in</strong>po<strong>in</strong>t <strong>the</strong> devices or busbars that<br />

could trigger <strong>the</strong>se high-risk events<br />

@ Locate <strong>the</strong> ma<strong>in</strong> <strong>energy</strong> consumption po<strong>in</strong>ts<br />

@ Understand your current and future<br />

operations & ma<strong>in</strong>tenance organisation and<br />

capabilities<br />

Example of process modelization and critical po<strong>in</strong>ts<br />

Step 2<br />

Assess equipment and<br />

evaluate network robustness<br />

@ For each set of equipment, build a stress<br />

<strong>in</strong>dicator based on:<br />

_ environmental conditions (humidity,<br />

temperature, sal<strong>in</strong>ity, etc.)<br />

_ operat<strong>in</strong>g conditions (load rate, number<br />

of operations, etc.)<br />

_ equipment age<strong>in</strong>g<br />

@ Carry out a reliability study to evaluate <strong>the</strong><br />

robustness of network design with regards to<br />

<strong>the</strong> critical po<strong>in</strong>ts identified <strong>in</strong> Step 1<br />

@ Classify each set of equipment accord<strong>in</strong>g to<br />

its contribution to <strong>the</strong> probability of occurrence<br />

of <strong>the</strong> unwanted events<br />

Example of equipment assessment<br />

Example of electrical risk identification Example of reliability calculation<br />

Dis_Valti1_P63<br />

Dis_Valti2_P63<br />

Dis_Valix_P63<br />

Dis_ATM_P63<br />

Dis_Filag_P63<br />

CM_Bat1_P63<br />

CM_Bat2_P63<br />

IM_Arv_VN<br />

TM_VN<br />

Dis_TGL_VN<br />

DisBT_S_Drev<br />

DisBT_N_Drev<br />

JDBbt_Lam_TGL<br />

CabBT_TGL_Drev<br />

CabBT_TGL_Lam<br />

EDF,<br />

Dis_EDF_P63<br />

Zz_Cab_63kV<br />

JDB_63kV_P63<br />

TR1_63kV<br />

TR2_63kV<br />

Dis_TR1_P63<br />

JDB_5kV_P63<br />

Cab_P63_VN<br />

Cab_TR1_P63<br />

JDB_5kV_VN<br />

Cab_VN_trTIV<br />

DisBT_geTIV<br />

CabBT_TR1_TGL<br />

CabBT_TR2_TGL<br />

CabBT_TR3_TGL<br />

...<br />

Reliability Level<br />

Low<br />

Medium<br />

High


MP4 Methodology<br />

Step 3<br />

Rate criticality levels<br />

Comb<strong>in</strong>e stress and reliability levels to rate<br />

<strong>the</strong> criticality of each set of equipment and<br />

def<strong>in</strong>e <strong>the</strong> appropriate service policy:<br />

@ Critical equipment<br />

(predictive ma<strong>in</strong>tenance, emergency recovery<br />

plan, upgrad<strong>in</strong>g action, etc.)<br />

@ Major equipment<br />

(preventive ma<strong>in</strong>tenance, etc.)<br />

@ M<strong>in</strong>or equipment<br />

(periodic <strong>in</strong>spection, etc.)<br />

Example of criticality matrix<br />

Step 4<br />

Draw up plans and share conclusions<br />

Based on <strong>the</strong> outputs of Step 3, <strong>the</strong> follow<strong>in</strong>g deliverables are consolidated:<br />

@ List of critical safety issues<br />

@ Upgrad<strong>in</strong>g actions necessary to restore nom<strong>in</strong>al <strong>in</strong>stallation performance<br />

@ 4 plans to:<br />

_ Optimise your operat<strong>in</strong>g expenditure (Ma<strong>in</strong>tenance Plan)<br />

_ Improve your performance (Modernisation and Monitor<strong>in</strong>g Plans)<br />

_ Track <strong>the</strong> implementation of actions <strong>in</strong>clud<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g, spare parts<br />

<strong>management</strong>, recovery plan, etc, (Management Plan). The priority of<br />

each recommendation and its economic balance sheet are assessed<br />

@ Formal presentation of conclusions and recommendations to ensure<br />

good understand<strong>in</strong>g and buy-<strong>in</strong> by all parties <strong>in</strong>volved


Installation Assessment<br />

MP4 Methodology<br />

MP4 deliverables<br />

4 improvement plans <strong>in</strong>clud<strong>in</strong>g critical safety issues<br />

The MP4 report allows you to identify critical safety issues such as:<br />

@ Incorrect break<strong>in</strong>g capacity<br />

@ Absence of <strong>in</strong>terlock<strong>in</strong>g devices<br />

@ Inappropriate protection of people<br />

@ Unprotected access to live parts, etc.<br />

<strong>Schneider</strong> <strong>Electric</strong> East Mediterranean s.a.l.<br />

Tabaris, Charles Malek Avenue, Tabaris Centre 1063, 10 th Floor<br />

P.O. Box : 166223 - Beirut, Lebanon<br />

Tel. +961 1 204 502<br />

Fax +961 1 204 458<br />

www.eastmed.schneider-electric.com<br />

Ma<strong>in</strong>tenance Plan<br />

@ A description of <strong>the</strong> level of ma<strong>in</strong>tenance to be performed<br />

@ The stress and reliability levels of critical devices<br />

@ A strategy for <strong>the</strong> ma<strong>in</strong>tenance plan schedule<br />

Modernisation Plan<br />

@ A list of equipment at <strong>the</strong> end of its service life and proposals of<br />

available retrofit solutions<br />

@ Advice on improv<strong>in</strong>g <strong>in</strong>stallation performance<br />

@ Suggestions on how to adapt your <strong>in</strong>stallation to meet your <strong>new</strong><br />

bus<strong>in</strong>ess requirements<br />

Monitor<strong>in</strong>g Plan<br />

@ A predictive approach to anticipate potential device failure<br />

@ Energy quality and availability <strong>in</strong>dicators<br />

@ Opportunities for <strong>energy</strong> sav<strong>in</strong>gs <strong>in</strong> relation to <strong>the</strong> various solutions<br />

deployed<br />

Management Plan<br />

The plan outl<strong>in</strong>es recommendations target<strong>in</strong>g:<br />

@ The safety of people work<strong>in</strong>g on <strong>the</strong> equipment<br />

@ Service contracts with respect to your subcontract<strong>in</strong>g policy<br />

@ Management of spare parts<br />

@ Competency <strong>management</strong> <strong>in</strong>clud<strong>in</strong>g expertise and tra<strong>in</strong><strong>in</strong>g<br />

@ Data <strong>management</strong> through direct access to <strong>the</strong> <strong>Schneider</strong> <strong>Electric</strong><br />

expert system<br />

Cyprus + 357 24 812 649 • customercare.cy@schneider-electric.com<br />

Iraq + 962 6 516 6260 • customercare.iq@schneider-electric.com<br />

Jordan + 962 6 516 6465 • customercare.jo@schneider-electric.com<br />

Lebanon + 961 1 321 645 • customercare.lb@schneider-electric.com<br />

Syria + 963 11 6124799 • customercare.sy@schneider-electric.com


Installation Assessment<br />

Network Consult<strong>in</strong>g<br />

Technical Study<br />

<strong>Schneider</strong> <strong>Electric</strong> Services offer a wide range of network<br />

consult<strong>in</strong>g solutions. Whe<strong>the</strong>r for <strong>new</strong> <strong>in</strong>stallations or for exist<strong>in</strong>g<br />

ones, we ensure <strong>the</strong> reliability of your assets.<br />

www.eastmed.schneider-electric.com<br />

<strong>Schneider</strong> <strong>Electric</strong> service has developed network consult<strong>in</strong>g solutions offer<strong>in</strong>g customers<br />

our expertise <strong>in</strong> plann<strong>in</strong>g, analyz<strong>in</strong>g, optimiz<strong>in</strong>g, and manag<strong>in</strong>g electrical networks.<br />

Our mission is to provide <strong>in</strong>tegrated technical solutions for expansion, re<strong>in</strong>forcement or<br />

refurbishment, and post-<strong>in</strong>cident analysis of electrical networks.<br />

Network consult<strong>in</strong>g solutions apply to all Medium Voltage equipment.<br />

<strong>Schneider</strong> <strong>Electric</strong> service can propose tailor-made solution, whe<strong>the</strong>r you are a private<br />

or public firm.<br />

Our dedicated team of experienced eng<strong>in</strong>eers can ensure network consult<strong>in</strong>g<br />

to customers all around <strong>the</strong> world.<br />

Network consult<strong>in</strong>g<br />

for every step<br />

of your asset <strong>management</strong>:<br />

Upstream of <strong>the</strong> project:<br />

Feasibility, def<strong>in</strong>ition, plann<strong>in</strong>g<br />

Dur<strong>in</strong>g <strong>the</strong> project:<br />

When some very specific studies have to<br />

be performed: for <strong>in</strong>stance optimization or<br />

performance test<strong>in</strong>g.<br />

Downstream of <strong>the</strong> project:<br />

When network performances have to be<br />

analyzed and improved


Installation Assessment<br />

Network Consult<strong>in</strong>g<br />

Mak<strong>in</strong>g <strong>the</strong> most<br />

of your assets<br />

<strong>Schneider</strong> <strong>Electric</strong> East Mediterranean s.a.l.<br />

Tabaris, Charles Malek Avenue, Tabaris Centre 1063, 10 th Floor<br />

P.O. Box : 166223 - Beirut, Lebanon<br />

Tel. +961 1 204 502<br />

Fax +961 1 204 458<br />

www.eastmed.schneider-electric.com<br />

Ma<strong>in</strong> offer<br />

Accord<strong>in</strong>g to your present or future needs, our offer <strong>in</strong>cludes:<br />

New project def<strong>in</strong>ition<br />

> Best power supply<br />

> Network prelim<strong>in</strong>ary design<br />

> Optimization<br />

Feasibility studies<br />

> Load forecasts<br />

> Technical feasibility of customer’s<br />

solution<br />

> Selection from different alternatives<br />

> Technical and budgetary criteria<br />

Impact studies for <strong>new</strong> projects and<br />

extensions<br />

> Power plant <strong>in</strong>terconnections studies<br />

> W<strong>in</strong>d farms<br />

> Cogeneration<br />

> Traditional power generation (Thermal,<br />

Hydro)<br />

> Reactive power compensation (SVC, etc)<br />

Network design<br />

> Network topology with high reliability<br />

and availability <strong>in</strong>dices<br />

> Optimum equipment rat<strong>in</strong>g: cables,<br />

OHL, transformers<br />

> Optimisation of transmission losses<br />

Equipment prelim<strong>in</strong>ary<br />

specifications<br />

> Equipment specified to meet customer<br />

needs and requirements<br />

> Conductor size (technical and<br />

economical criteria)<br />

> Transformer rat<strong>in</strong>g<br />

> Circuit-breakers<br />

> Substations<br />

System performance studies for<br />

exist<strong>in</strong>g and future networks<br />

> Short circuit capability<br />

> Transient stability<br />

> Dynamic stability<br />

> Reliability and availability assessment<br />

> Switch<strong>in</strong>g and light<strong>in</strong>g transients<br />

> Insulation coord<strong>in</strong>ation<br />

Cyprus + 357 24 812 649 • customercare.cy@schneider-electric.com<br />

Iraq + 962 6 516 6260 • customercare.iq@schneider-electric.com<br />

Jordan + 962 6 516 6465 • customercare.jo@schneider-electric.com<br />

Lebanon + 961 1 321 645 • customercare.lb@schneider-electric.com<br />

Syria + 963 11 6124799 • customercare.sy@schneider-electric.com


Asset Management Program<br />

Emergency<br />

on-site <strong>in</strong>tervention<br />

www.eastmed.schneider-electric.com<br />

Reduce your breakdown times with <strong>in</strong>tervention<br />

by an expert with<strong>in</strong> a contractual timescale<br />

Your needs<br />

@ Speedy <strong>in</strong>tervention by an expert on your site so that repairs are made as quickly as<br />

possible<br />

@ Competent and responsive technical support<br />

Your benefits<br />

@ We undertake to attend your site with<strong>in</strong> a contractual timescale <strong>in</strong> order to ensure a prompt<br />

response <strong>in</strong> <strong>the</strong> event of a fault


Asset Management Program<br />

Spare parts<br />

www.eastmed.schneider-electric.com<br />

Reduce your breakdown times by hav<strong>in</strong>g a guaranteed delivery<br />

time for spare parts<br />

Your needs<br />

@ you need to have spare parts to hand so that you can repair faults quickly<br />

Your benefits<br />

@ We guarantee to deliver your spare parts (def<strong>in</strong>ed at <strong>the</strong> start of <strong>the</strong> contract by our experts)<br />

with<strong>in</strong> a contractual timescale<br />

@ We offer you a logistics structure for priority spare parts which has been tried and tested<br />

over a number of years, <strong>in</strong> order to meet your needs for reduced stoppage times


Asset Management Program<br />

Medium Voltage Spare Parts<br />

Power factor<br />

correction<br />

Instrument<br />

transformer<br />

Fuse<br />

Switch /<br />

disconnector<br />

Contactor<br />

Circuit breaker<br />

Protection<br />

CP 200<br />

series<br />

Propivar<br />

CT, VT<br />

LPCT<br />

CT, VT<br />

MGK<br />

Tepefuse,<br />

Fusarc<br />

CF<br />

Solefuse<br />

Fusarc<br />

CF<br />

LBSkit<br />

CTV1<br />

Rollarc<br />

GI-E<br />

Evolis 24 kV<br />

Evolis HP<br />

Evolis<br />

17.5 kV<br />

SF2<br />

SF F400<br />

SF1, SFset<br />

LFP<br />

LF<br />

Sepam<br />

series 80<br />

Sepam<br />

series 20<br />

series 40<br />

Sepam<br />

series 10<br />

Multifunction protection unit<br />

for all voltage levels<br />

RATED VOLTAGE<br />

Application<br />

substation<br />

busbar<br />

transformer<br />

motor<br />

generator<br />

capacitor<br />

14400 kvar<br />

600 kvar<br />

2500 A<br />

2500 A<br />

5000 A<br />

250 A<br />

2.5 A<br />

125 A<br />

250 A<br />

1250 A<br />

250 A<br />

400 A<br />

3150 A<br />

1250 A<br />

2500 A<br />

3150 A<br />

2500 A<br />

3150 A 2500 A<br />

3150 A 1250 A<br />

1250 A<br />

MAX. RATED CURRENT<br />

3150 A 5000 A<br />

Protocols<br />

Modbus, IEC 60870-5-103, DNP3, IEC 61850<br />

31.5 kA<br />

50 kA<br />

40 kA<br />

50 kA<br />

l1 l1 l1 l1<br />

63 kA 50 kA 63 kA 50 kA<br />

25 kA<br />

8 kA<br />

8 kA<br />

10 kA<br />

31.5 kA<br />

31.5 kA 25 kA<br />

50 kA<br />

40 kA<br />

40 kA 31.5 kA<br />

MAX. RATED SHORT CIRCUIT CURRENT<br />

50 kA 40 kA 50 kA 31.5 kA 25 kA 40 kA 31.5 kA<br />

vacuum /<br />

SF6<br />

"all film"<br />

with or<br />

without<br />

<strong>in</strong>ternal<br />

fuses<br />

dry<br />

dry<br />

dry<br />

SF6<br />

vacuum<br />

SF6<br />

SF6<br />

vacuum<br />

vacuum<br />

vacuum<br />

SF6<br />

SF6<br />

SF6<br />

SF6<br />

SF6<br />

digital<br />

Power factor<br />

correction<br />

and harmonic<br />

filter<strong>in</strong>g on<br />

MV networks<br />

Power factor<br />

correction on<br />

MV networks<br />

or devices<br />

Outdoor<br />

Current<br />

Transformer<br />

and<br />

Voltage<br />

Transformer<br />

Fixed or<br />

automatic capacitor<br />

banks<br />

for motor,<br />

substation,<br />

or <strong>global</strong><br />

distribution<br />

R<strong>in</strong>g<br />

type and<br />

medium<br />

voltage<br />

Low<br />

Power<br />

Current<br />

Transformer<br />

(LPCT)<br />

R<strong>in</strong>g<br />

type and<br />

medium<br />

voltage<br />

Current<br />

Transformer,<br />

Voltage<br />

Transformer<br />

Standard<br />

AFNOR<br />

Standards<br />

IEC, DIN,<br />

UTE<br />

Standards<br />

IEC, UTE<br />

Standards<br />

DIN, IEC<br />

Indoor load break<br />

switch (630 A),<br />

disconnector and<br />

accessories<br />

Vacuum<br />

withdrawable<br />

contactor<br />

Fixed and withdrawable<br />

contactor with<br />

magnetic hold<strong>in</strong>g or<br />

mechanical latch<strong>in</strong>g<br />

Outdoor fixed<br />

circuit breaker<br />

Fixed circuit<br />

breaker<br />

Fixed<br />

and withdrawable<br />

circuit breaker<br />

With drawable<br />

circuit breaker<br />

Fixed<br />

and withdrawable<br />

circuit breaker<br />

Fixed circuit<br />

breaker<br />

Withdrawable<br />

circuit breaker<br />

Fixed circuit<br />

breaker<br />

Fixed circuit<br />

breaker<br />

high power<br />

version<br />

for power plant<br />

Fixed and<br />

withdrawable<br />

circuit breaker<br />

Multifunction unit<br />

compact and<br />

flexible<br />

for all current<br />

applications<br />

Fuse for Motor<br />

measurement protection<br />

transformer fuse range<br />

protection up<br />

to 24 kV<br />

(Tepefuse)<br />

and up to<br />

36 kV<br />

(Fusarc CF)<br />

Fuses for<br />

distribution<br />

transformer<br />

from 3.6 kV to<br />

36 kV<br />

Side<br />

mounted<br />

Front<br />

mounted<br />

Front mounted<br />

Front mounted<br />

Overcurrent and<br />

earth-fault relay<br />

for basic protection<br />

of feeders<br />

and distribution<br />

transformers<br />

Front or side<br />

mounted<br />

mechanism<br />

Multifunction unit<br />

<strong>in</strong>telligent and<br />

flexible<br />

for custom<br />

applications<br />

(Logipam<br />

software)<br />

Thermal<br />

protection<br />

<strong>in</strong>cluded<br />

Indoor or<br />

outdoor<br />

<strong>in</strong>stallation<br />

VIP<br />

<strong>in</strong>tegrated trip<br />

unit (with out<br />

auxilary<br />

power supply)<br />

<strong>in</strong> Evoset up<br />

to 20 kA<br />

VIP <strong>in</strong>tegrated<br />

trip unit (without<br />

auxiliary power<br />

supply) <strong>in</strong> SFset<br />

up to 24 kV<br />

www.eastmed.schneider-electric.com


Asset Management Program<br />

Preventive<br />

ma<strong>in</strong>tenance<br />

www.eastmed.schneider-electric.com<br />

Optimise <strong>the</strong> level of performance of your <strong>in</strong>stallation<br />

Your needs<br />

@ Ma<strong>in</strong>ta<strong>in</strong> your electrical equipment regularly, as def<strong>in</strong>ed by <strong>the</strong><br />

manufacturer, <strong>in</strong> order to reta<strong>in</strong> its orig<strong>in</strong>al operational level<br />

@ Entrust your <strong>in</strong>stallations to a professional <strong>in</strong> electrical distribution<br />

who is competent to handle <strong>the</strong> various technical grades of your<br />

equipment<br />

Your benefits<br />

Manufacturer ma<strong>in</strong>tenance:<br />

@ Governed by <strong>in</strong>ternational standards<br />

@ Undertaken by field services eng<strong>in</strong>eers<br />

@ Us<strong>in</strong>g special tools and dedicated eng<strong>in</strong>eers<br />

@ Supported by an IBSuite tool guarantee<strong>in</strong>g compliance<br />

with service procedures<br />

@ F<strong>in</strong>alised by recommendations specified <strong>in</strong> a detailed report<br />

We will improve:<br />

@ Protection of your personnel and equipment<br />

@ Your cont<strong>in</strong>uity of service<br />

@ The useful life of your equipment<br />

@ Anticipation of certa<strong>in</strong> problems<br />

Preventive manufacturer<br />

ma<strong>in</strong>tenance of Vercors<br />

500 type high voltage<br />

switchboard<br />

Preventive manufacturer<br />

ma<strong>in</strong>tenance of an FG2<br />

circuit-breaker - Fluair<br />

200 range


Asset Management Program<br />

Predictive<br />

ma<strong>in</strong>tenance<br />

www.eastmed.schneider-electric.com<br />

Anticipate future breakdowns thanks to regular<br />

diagnostic of your equipment<br />

You want to anticipate future electrical failures <strong>in</strong> order to ensure<br />

optimum cont<strong>in</strong>uity of service on your site<br />

Our expertise<br />

For around thirty years <strong>Schneider</strong> <strong>Electric</strong> has studied all <strong>the</strong><br />

phenomena lead<strong>in</strong>g to malfunctions that might disrupt electrical<br />

distribution<br />

Your benefits<br />

Periodic diagnostics of your electrical equipment:<br />

@ By skilled experts who have undergone regular tra<strong>in</strong><strong>in</strong>g<br />

@ With specific manufacturer tools cont<strong>in</strong>uously updated and<br />

improved by regular feedback from our factories and on-site<br />

<strong>in</strong>terventions<br />

<strong>Schneider</strong> <strong>Electric</strong> has your constra<strong>in</strong>ts <strong>in</strong>to taken by develop<strong>in</strong>g<br />

two k<strong>in</strong>ds of diagnostics:<br />

@ Diagnostics without Shut-down<br />

@ Diagnostics with Shut-Down<br />

Panorama of <strong>Schneider</strong> <strong>Electric</strong> diagnosis tools<br />

MV<br />

ProDiag<br />

ProCorona<br />

ProSelect<br />

Panorama of <strong>Schneider</strong> <strong>Electric</strong> diagnosis tools<br />

ProFusion<br />

Thermography<br />

LV<br />

The undesirable<br />

phenomena <strong>in</strong> electrical<br />

distribution are:<br />

@ <strong>Electric</strong>al<br />

o Short-circuit<br />

o Current overload<br />

o Overheat<strong>in</strong>g<br />

o Partial discharge, etc<br />

@ Mechanical<br />

o Effect of wear on <strong>the</strong> operat<strong>in</strong>g system<br />

o Effect of wear on <strong>the</strong> break<strong>in</strong>g system, etc<br />

@ Environmental<br />

o Humidity/ventilation<br />

o Pollution, etc<br />

Diagnosis on an FG2<br />

circuit-breaker us<strong>in</strong>g<br />

ProDiag<br />

Surface discharges on<br />

<strong>in</strong>sulators<br />

Corona effects on a<br />

charger


Asset Management Program<br />

Predictive ma<strong>in</strong>tenance<br />

without shut-down<br />

Your needs<br />

@ Ensure optimum cont<strong>in</strong>uity of service<br />

@ Cut down or elim<strong>in</strong>ate shut-down times when perform<strong>in</strong>g<br />

ma<strong>in</strong>tenance and diagnostic services<br />

Your benefits<br />

Diagnosis of your equipment without shut-down:<br />

@ Low Voltage ; IR Thermography:<br />

o Check of hot spots on Low Voltage busbars and connections<br />

o Analysis of results by a qualified expert<br />

o Recommendations set out formally <strong>in</strong> a report<br />

@ Medium Voltage ; ProCorona:<br />

o Detection of partial surface discharges us<strong>in</strong>g ultrasound<br />

o Audit of Medium Voltage cubicles and station<br />

o Analysis of results by a qualified expert<br />

o Recommendations set out formally <strong>in</strong> a report<br />

We <strong>the</strong>refore take account of your <strong>in</strong>creas<strong>in</strong>gly restrictive operat<strong>in</strong>g<br />

constra<strong>in</strong>ts.<br />

www.eastmed.schneider-electric.com<br />

Panorama of <strong>Schneider</strong> <strong>Electric</strong> diagnosis tools<br />

MV<br />

ProDiag<br />

ProCorona<br />

ProSelect<br />

Thermal analysis test on Low Voltage busbars<br />

Example of an<br />

advanced corona-effect<br />

phenomenon on Medium<br />

Voltage <strong>in</strong>sulators<br />

ProFusion<br />

Panorama of <strong>Schneider</strong> <strong>Electric</strong> diagnosis tools<br />

Thermography<br />

LV<br />

Diagnostics of an Interprotection<br />

type VM6<br />

cubicle us<strong>in</strong>g Procorona


Predictive ma<strong>in</strong>tenance<br />

with shut-down<br />

Your needs<br />

@ Guaranty <strong>the</strong> cont<strong>in</strong>uity of service of your electrical <strong>in</strong>stallation<br />

@ Anticipate future faults<br />

@ Optimise your ma<strong>in</strong>tenance and diagnosis operations<br />

Your benefits<br />

In-depth diagnosis with shut-down of your MV/LV equipment:<br />

@ Medium Voltage and Low Voltage ; ProDiag<br />

o Study of <strong>the</strong> circuit-breaker and contactor drive cha<strong>in</strong><br />

o Evaluation of <strong>the</strong> performance of circuit-breakers and contactors<br />

us<strong>in</strong>g <strong>the</strong> ProDiag tool<br />

o Analysis of results and trends by a expert who has undergone<br />

regular tra<strong>in</strong><strong>in</strong>g<br />

o Recommendations set out formally <strong>in</strong> a report<br />

@ Medium Voltage ; ProFusion<br />

o Measurement of <strong>the</strong> resistance of Medium Voltage fuses<br />

o Analysis and comparison of results by an expert<br />

o Recommendations set out formally <strong>in</strong> a report<br />

@ Low Voltage ; ProSelect<br />

o Monitor<strong>in</strong>g of <strong>the</strong> protection relay on LV circuit-breakers by<br />

current <strong>in</strong>jection<br />

o Check of upstream-downstream discrim<strong>in</strong>ation<br />

o Analysis of results by a qualified expert<br />

o Recommendations set out formally <strong>in</strong> a report<br />

Panorama of <strong>Schneider</strong> <strong>Electric</strong> diagnosis tools<br />

MV<br />

ProDiag<br />

ProCorona<br />

ProSelect<br />

;<br />

;<br />

;<br />

ProDiag<br />

ProFusion<br />

Panorama of <strong>Schneider</strong> <strong>Electric</strong> diagnosis tools<br />

Thermography<br />

LV


On-Demand Ma<strong>in</strong>tenance<br />

<strong>Electric</strong>al Ma<strong>in</strong>tenance<br />

Contracts<br />

Performance /<br />

required<br />

Repair<br />

Curative cost<br />

Indirect cost -<br />

Direct cost -<br />

Performance / Cost<br />

No preventive ma<strong>in</strong>tenance<br />

Ma<strong>in</strong>tenance is a way to prevent electrical risks that can have an<br />

operational and f<strong>in</strong>ancial impact on your operational means.<br />

Are you measur<strong>in</strong>g <strong>the</strong> f<strong>in</strong>ancial impact of non ma<strong>in</strong>tenance <strong>in</strong><br />

term of downtime cost ?<br />

Example of hourly cost of site downtime (¤)<br />

Oil and Gas<br />

Mobile telephone systems<br />

Airl<strong>in</strong>e reservations<br />

Food & Beverage<br />

Stock-market transactions<br />

Automotive<br />

Cement<br />

Pharmaceutical<br />

Have you <strong>in</strong> m<strong>in</strong>d <strong>the</strong> differences between different ma<strong>in</strong>tenance<br />

strategies <strong>in</strong> term of costs and performance?<br />

Ma<strong>in</strong>tenance cost <strong>in</strong>crease<br />

Defective /<br />

<strong>in</strong>adequate<br />

<strong>in</strong>sulation<br />

5%<br />

L<strong>in</strong>e disturbance*<br />

*does not <strong>in</strong>clude<br />

lightn<strong>in</strong>g damage<br />

5%<br />

Moisture<br />

9%<br />

Overload<br />

7%<br />

Defected<br />

equipment<br />

9%<br />

O<strong>the</strong>rs<br />

1%<br />

Lightn<strong>in</strong>g<br />

4%<br />

Collision<br />

1%<br />

Environnement<br />

8%<br />

Mandatory<br />

replacement,<br />

impossible repair<br />

Replacement cost<br />

Equipment<br />

manufacturer<br />

life time<br />

5 years 10 years 15 years 20 years<br />

th<br />

Failed Floor <strong>in</strong>tervention<br />

17%<br />

Loose connection<br />

34%<br />

Performance /<br />

required<br />

Repair<br />

Preventive<br />

cost<br />

100 000<br />

40 000<br />

90 000<br />

20 000<br />

over 1 000 000<br />

30 000<br />

15 000<br />

30 000<br />

Performance / Cost<br />

Ma<strong>in</strong>tenance cost improvment<br />

With preventive ma<strong>in</strong>tenance<br />

What are <strong>the</strong> major causes of equipment failures ?<br />

planned<br />

replacement<br />

Replacement cost<br />

Equipment<br />

manufacturer<br />

life time<br />

5 years 10 years 15 years 20 years


On-Demand Ma<strong>in</strong>tenance<br />

<strong>Electric</strong>al Ma<strong>in</strong>tenance Contracts<br />

www.eastmed.schneider-electric.com<br />

Do you know <strong>the</strong> major damages impact<strong>in</strong>g your site and <strong>the</strong><br />

role of electrical equipment failure?<br />

Water<br />

stream<strong>in</strong>g<br />

1%<br />

<strong>Electric</strong>al<br />

2%<br />

Leakage<br />

1%<br />

Explosion<br />

3%<br />

Broken<br />

mach<strong>in</strong><br />

5%<br />

Storm<br />

6%<br />

Flood<br />

10%<br />

Water<br />

damage<br />

1%<br />

Roberry<br />

1% Various<br />

6%<br />

Fire<br />

64%<br />

{<br />

Burner<br />

2%<br />

Spark<br />

3%<br />

O<strong>the</strong>rs<br />

23%<br />

Static<br />

electricity<br />

3%<br />

Friction<br />

6%<br />

Superheat<strong>in</strong>g<br />

7%<br />

Cigaret<br />

2%<br />

Are you aware of <strong>the</strong> risk occurrence of failures<br />

if you do not carry out ma<strong>in</strong>tenance ?<br />

Cable term<strong>in</strong>ations<br />

Cable Jo<strong>in</strong>ts<br />

Bus duct<br />

Switchgear bus <strong>in</strong>sulated<br />

Disconnect switches<br />

Transformer<br />

Circuit breaker<br />

0% 20% 40% 60% 80% 100%<br />

Without Preventive Ma<strong>in</strong>tenance<br />

With Preventive Ma<strong>in</strong>tenance<br />

Example: Circuit breaker<br />

On 100 circuit breakers which failed,<br />

82% have no preventive ma<strong>in</strong>tenance<br />

and 18% have preventive ma<strong>in</strong>tenance<br />

Work<br />

by<br />

hot spot<br />

6%<br />

<strong>Electric</strong>ity<br />

22%<br />

Arson<br />

7%<br />

Radiant<br />

11%<br />

Neighbourhood<br />

1%<br />

Ignition<br />

6%


On-Demand Ma<strong>in</strong>tenance<br />

<strong>Electric</strong>al Ma<strong>in</strong>tenance Contracts<br />

www.eastmed.schneider-electric.com<br />

Bas<strong>in</strong>g ourselves on your expectations, we offer a range of<br />

different ma<strong>in</strong>tenance contracts, drawn up <strong>in</strong> <strong>the</strong> perspective<br />

of a relationship of trust, based on our expertise and<br />

compliance with our commitments.<br />

Our contracts address this criticality by means of :<br />

@ preventive manufacturer ma<strong>in</strong>tenance <strong>in</strong> accordance with IEC standards,<br />

@ emergency corrective ma<strong>in</strong>tenance with service levels,<br />

@ <strong>management</strong> of <strong>in</strong>tervention and equipment data,<br />

@ a contractual package provid<strong>in</strong>g you with improved <strong>management</strong> of <strong>the</strong> cost / performance<br />

ratio of your ma<strong>in</strong>tenance.<br />

Our contracts are tailored for ma<strong>in</strong>tenance managers, who are responsible for :<br />

@ <strong>the</strong> due and proper f<strong>in</strong>ancial, operational and human <strong>management</strong> of your activity,<br />

@ optimis<strong>in</strong>g use of your electrical equipment,<br />

@ <strong>the</strong> safety and work<strong>in</strong>g environment of your teams.<br />

Our contracts enable you to :<br />

Optimise your site’s availability<br />

n anticipate and limit <strong>the</strong> number of <strong>in</strong>cidents<br />

n organise <strong>the</strong> resources required for optimised and secure <strong>in</strong>cident-<strong>management</strong><br />

n schedule preventive ma<strong>in</strong>tenance <strong>in</strong>terventions by adapt<strong>in</strong>g to production constra<strong>in</strong>ts<br />

Improve <strong>the</strong> f<strong>in</strong>ancial <strong>management</strong> of your electrical assets<br />

n control and plan your preventive ma<strong>in</strong>tenance costs<br />

n reduce your corrective ma<strong>in</strong>tenance costs<br />

n assess <strong>the</strong> <strong>in</strong>direct costs of downtime and to take action<br />

n anticipate future <strong>in</strong>vestments<br />

Manage your <strong>in</strong>stalled base of electrical equipment <strong>in</strong> an optimum manner<br />

n ensure <strong>the</strong> susta<strong>in</strong>ability of your equipment’s life cycle and performance levels<br />

n comply with effective norms and standards<br />

n guarantee <strong>the</strong> implementation of your ma<strong>in</strong>tenance schedule<br />

n benefit from our recommendations for consult<strong>in</strong>g and expert survey <strong>in</strong>itiatives or projects


On-Demand Ma<strong>in</strong>tenance<br />

<strong>Electric</strong>al Ma<strong>in</strong>tenance Contracts<br />

<strong>Schneider</strong> <strong>Electric</strong> East Mediterranean s.a.l.<br />

Tabaris, Charles Malek Avenue, Tabaris Centre 1063, 10 th Floor<br />

P.O. Box : 166223 - Beirut, Lebanon<br />

Tel. +961 1 204 502<br />

Fax +961 1 204 458<br />

www.eastmed.schneider-electric.com<br />

The contract formulas<br />

You have specific operational and f<strong>in</strong>ancial requirements. Our ma<strong>in</strong>tenance contracts<br />

are drawn-up with your <strong>in</strong>put. So as to meet your requirements,<br />

we offer three formulas for <strong>Electric</strong>al Ma<strong>in</strong>tenance Contracts :<br />

The Prevention Contract:<br />

This ensures optimum performance levels for your electrical facilities by :<br />

n manufacturer ma<strong>in</strong>tenance,<br />

n emergency support <strong>in</strong> liaison with our Service teams.<br />

The Prevention + Package :<br />

Based on <strong>the</strong> Prevention Contract, it manages budgetary variations ow<strong>in</strong>g to<br />

<strong>in</strong>tervention time dur<strong>in</strong>g <strong>in</strong>cidents, due to * option “free support”.<br />

Under <strong>the</strong> contract, <strong>Schneider</strong> <strong>Electric</strong> assumes <strong>the</strong> hourly cost of urgent curative<br />

ma<strong>in</strong>tenance.<br />

The Prevention ++ Package :<br />

This meets your f<strong>in</strong>ancial security requirements and optimises <strong>the</strong> cost of both<br />

preventive and corrective ma<strong>in</strong>tenance due to * option “free support” and ** option<br />

“free parts”.<br />

This covers <strong>the</strong> time, parts and equipment required to restart <strong>the</strong> malfunction<strong>in</strong>g<br />

elements identified <strong>in</strong> <strong>the</strong> Contract.<br />

These formulas may be adapted to your requirements <strong>in</strong> terms of service level and <strong>the</strong> scope<br />

of <strong>the</strong> services. At your request, additional options may be progressively added to <strong>the</strong> packages<br />

<strong>in</strong>-l<strong>in</strong>e with <strong>the</strong> life cycle of your facilities (e.g.: level 5 ma<strong>in</strong>tenance).<br />

The Prevention The Prevention + The Prevention ++<br />

Contract Package Package<br />

Preventive ma<strong>in</strong>tenance (levels 1 to 4) n n n<br />

Emergency on-site <strong>in</strong>tervention: 8 bus<strong>in</strong>ess hours n n n<br />

Access to ma<strong>in</strong>tenance data n n<br />

* Option “free support” n n<br />

** Option “free parts” n<br />

* Option “free support”<br />

When <strong>the</strong> Contract is executed, and throughout its term, <strong>the</strong> <strong>in</strong>tervention and travel expenses<br />

for corrective ma<strong>in</strong>tenance are estimated, set on a fixed basis, and scheduled. The cost of<br />

purchas<strong>in</strong>g parts is <strong>in</strong>voiced <strong>in</strong> addition to <strong>the</strong> Contract.<br />

** Option “free parts”<br />

The spare parts required to repair recent equipment are subject to a fixed price <strong>in</strong> <strong>the</strong> Contract.<br />

Only material expenses relat<strong>in</strong>g to obsolete equipment are <strong>in</strong>voiced <strong>in</strong> addition to <strong>the</strong> Contract.<br />

Cyprus + 357 24 812 649 • customercare.cy@schneider-electric.com<br />

Iraq + 962 6 516 6260 • customercare.iq@schneider-electric.com<br />

Jordan + 962 6 516 6465 • customercare.jo@schneider-electric.com<br />

Lebanon + 961 1 321 645 • customercare.lb@schneider-electric.com<br />

Syria + 963 11 6124799 • customercare.sy@schneider-electric.com


On-Demand Ma<strong>in</strong>tenance<br />

Transformer<br />

Ma<strong>in</strong>tenance Services<br />

Different packs to diagnose<br />

<strong>the</strong> health of your transformers<br />

www.eastmed.schneider-electric.com<br />

Our laboratory analyses <strong>the</strong> dielectric fluid <strong>in</strong> your<br />

transformers to ensure safe, efficient and reliable operation.<br />

TRANSFO SERVICES offers a full range of SERVICE PACKS<br />

comb<strong>in</strong><strong>in</strong>g a number of analyses. You can choose <strong>the</strong> analyses<br />

need without be<strong>in</strong>g an expert <strong>in</strong> chemical eng<strong>in</strong>eer<strong>in</strong>g. Contents<br />

range from a check on fluid quality to a complete check-up on<br />

<strong>the</strong> condition of your transformer.<br />

PACK PCB<br />

Check <strong>the</strong> level of contam<strong>in</strong>ation of liquid dielectric transformers by PCBs or equivalent and<br />

compliance with environmental legislation (European directive 96/59/CE). (PCB content) (x).<br />

PACK 1<br />

Check <strong>the</strong> quality of <strong>the</strong> dielectric fluid based on <strong>the</strong> transformer efficiency of <strong>the</strong> transformer.<br />

(For oil, this <strong>in</strong>cludes <strong>the</strong> breakdown voltage, water content, acidity, colour <strong>in</strong>dex and general<br />

aspect. For pyralene, all <strong>the</strong> above plus dielectric dissipation factor and resistivity checks) (x).<br />

PACK 2<br />

Obta<strong>in</strong> an overall <strong>in</strong>dication of <strong>the</strong> <strong>in</strong>ternal condition of <strong>the</strong> transformer to prevent electrical<br />

accidents.(PACK 1 (x) and dissolved-gas check).<br />

PACK 2+<br />

Precisely characterise <strong>in</strong>ternal transformer faults for enhanced prevention of electrical<br />

accidents. (PACK 1, PCB pack and dissolved-gas content) (x).<br />

PACK 3<br />

Precisely characterise <strong>in</strong>ternal transformer faults and <strong>the</strong> status of <strong>the</strong> solid <strong>in</strong>sulation<br />

to anticipate any problems with <strong>the</strong> w<strong>in</strong>d<strong>in</strong>gs. (PACK 1, dissolved-gas content<br />

and furan-derivatives content) (x).<br />

PACK 4<br />

Complete check-up on <strong>the</strong> transformer. Characterise suspended matter and polar components<br />

of <strong>the</strong> dielectric fluid for maximum safety. (PACK 3 (x), metal content, particle counts, tan delta<br />

(x) and resistivity (x)).<br />

Accreditations and qualifications


On-Demand Ma<strong>in</strong>tenance<br />

Transformer Ma<strong>in</strong>tenance Services<br />

** Normal : o<strong>the</strong>r cases<br />

www.eastmed.schneider-electric.com<br />

Custom analysis:<br />

@ Interfacial Tension<br />

@ Gravimetric analysis of deposits<br />

@ Hydrocarbons content<br />

@ Flash po<strong>in</strong>t<br />

@ Viscosity<br />

@ Density<br />

@ Corrosiveness of <strong>the</strong> oil (corrosive Sulphur)<br />

A guide for your pack selection<br />

Age of transformer Less than 5 years Between 5 and 15 years More than 15 years<br />

Primary Voltage < 24 KV > 24 KV < 24 KV > 24 KV < 24 KV > 24 KV<br />

Strong<br />

types<br />

of analyses<br />

PACK 2 or<br />

PACK 2+<br />

PACK 3 PACK 4<br />

criticality* Frequence<br />

of analyses<br />

Every year<br />

Normal<br />

types of<br />

analyses<br />

PACK 1 or<br />

PACK 2<br />

PACK 2+ or PACK 3 PACK 4<br />

criticality** Frequence<br />

of analyses<br />

Every two years<br />

* Highly criticality : Power autotransformers 5MVA, critical, heavily loaded, step-up or traction transformers and power transformers 5MVA.


Transformer Ma<strong>in</strong>tenance Services<br />

Benefits<br />

For a reliable diagnostic, <strong>Schneider</strong> <strong>Electric</strong> transformer<br />

ma<strong>in</strong>tenance services offer you:<br />

@ A complete kit of sampl<strong>in</strong>g with its simple and detailed operat<strong>in</strong>g mode, for an efficient<br />

manipulation at <strong>the</strong> f<strong>in</strong>gertips of everybody.<br />

@ When necessary, a qualified technician <strong>in</strong> order to realize <strong>the</strong> sampl<strong>in</strong>g.<br />

Our diagnostic:<br />

@ Redaction of a simple and detailed analyses report for <strong>the</strong> assessment of your transformer’s<br />

health.<br />

@ History of <strong>the</strong> analyses for a follow-up on <strong>the</strong> evolution of your transformer’s health.<br />

@ Provision of analyses statement guarantee<strong>in</strong>g <strong>the</strong> PCB oil content of your transformer.<br />

Our solutions:<br />

@ Replacement of <strong>the</strong> oil charge with process<strong>in</strong>g,<br />

@ Regeneration and/or decontam<strong>in</strong>ation of <strong>the</strong> oil on site or <strong>in</strong> workshop,<br />

@ Rew<strong>in</strong>d<strong>in</strong>g and complete renovation,<br />

@ End of life process<strong>in</strong>g (removal package, retrofit, destruction),<br />

@ Etc…<br />

Our references:<br />

@ Established <strong>in</strong> 1989, our laboratory realizes more than 30 000 analyses per year.<br />

@ The accreditation COFRAC obta<strong>in</strong>ed <strong>in</strong> 2004 is deemed to be <strong>the</strong> Insurance given to a client<br />

certify<strong>in</strong>g that <strong>the</strong> analyses laboratory TRANSFO SERVICES employs each and every effort <strong>in</strong><br />

order to obta<strong>in</strong> a reliable and reproducible result on <strong>the</strong> level of <strong>the</strong> staff competence as much<br />

as on technical means it uses. This “co-signature” is a strong commitment of impartiality and<br />

competences.


<strong>Schneider</strong> <strong>Electric</strong><br />

Services<br />

Retrofit<br />

Retrofit on switchgear<br />

and protection devices


Modernization<br />

Presentation of <strong>the</strong> offer<br />

Introduction<br />

www.eastmed.schneider-electric.com<br />

Today, <strong>the</strong> productivity, operat<strong>in</strong>g safety, cont<strong>in</strong>uity of service<br />

and availability requirements of <strong>in</strong>stallations are such that at all<br />

levels of a company, <strong>the</strong> quest for high performance is a major<br />

consideration.<br />

The experience ga<strong>in</strong>ed by <strong>Schneider</strong> <strong>Electric</strong> <strong>in</strong> carry<strong>in</strong>g out more than 5000 medium-voltage<br />

retrofits on Belledonne, Taillefer, Fluair and Vercors cubicles and more than 3000 low-voltage<br />

retrofits on T140, T12 and Masterbloc switchboards has enabled us to acquire <strong>the</strong> expertise<br />

and know-how required to help you secure <strong>the</strong> loyalty of your customers.<br />

Accord<strong>in</strong>g to <strong>the</strong> equipment concerned, <strong>Schneider</strong> <strong>Electric</strong> offers different types of services,<br />

<strong>in</strong>clud<strong>in</strong>g:<br />

@ Supply<strong>in</strong>g spare parts,<br />

@ Modify<strong>in</strong>g cubicles,<br />

@ Replac<strong>in</strong>g protective devices,<br />

@ Replac<strong>in</strong>g orig<strong>in</strong>al devices with latest-generation devices.<br />

There are various ways of replac<strong>in</strong>g old devices. The most usual methods are:<br />

Retrofit: <strong>the</strong> orig<strong>in</strong>al circuit breaker and its truck are replaced<br />

@ The connection <strong>in</strong>terfaces (power and low voltage) are adapted for use on <strong>the</strong> orig<strong>in</strong>al cubicle.<br />

@ The <strong>new</strong> circuit breaker is fitted with <strong>the</strong> <strong>new</strong> <strong>in</strong>terfaces.<br />

@ The solution is tested mechanically with <strong>the</strong> mount<strong>in</strong>g jig.<br />

Retrofil: <strong>the</strong> orig<strong>in</strong>al truck is reta<strong>in</strong>ed and fitted with a <strong>new</strong> circuit<br />

breaker<br />

@ The orig<strong>in</strong>al truck is renovated.<br />

@ The power <strong>in</strong>terfaces are ei<strong>the</strong>r reta<strong>in</strong>ed and renovated or <strong>the</strong>y are recreated.<br />

@ The <strong>new</strong> circuit breaker is adapted for mount<strong>in</strong>g on <strong>the</strong> orig<strong>in</strong>al truck.<br />

@ The solution is tested mechanically with <strong>the</strong> mount<strong>in</strong>g jig.<br />

<strong>Schneider</strong> <strong>Electric</strong> can also implement <strong>the</strong>se solutions with devices manufactured by its<br />

competitors (Alstom, Calor Emag, ABB, ASEA, BBC, UNELEC, AREVA).<br />

Many retrofitted devices are <strong>in</strong> use worldwide.<br />

<strong>Schneider</strong> <strong>Electric</strong> is actively work<strong>in</strong>g to improve delivery times and optimise <strong>the</strong> costs of<br />

retrofit solutions <strong>in</strong> order to provide you with constant support and help <strong>in</strong> ensur<strong>in</strong>g customer<br />

satisfaction.<br />

We pay particular attention to quality, which is our major consideration.


Modernization<br />

Presentation of <strong>the</strong> offer<br />

Renovations solutions<br />

www.eastmed.schneider-electric.com<br />

Scope of <strong>the</strong> offer<br />

Switchboard renovation<br />

@ Progressive replacement without modification of customers’ equipment:<br />

renovation of medium and low voltage switchgear,<br />

kits for improv<strong>in</strong>g equipment.<br />

@ Complete replacement or addition of cubicles by extension:<br />

<strong>in</strong>sertion of cubicles <strong>in</strong>to <strong>the</strong> switchboard with connection ducts,<br />

addition at <strong>the</strong> end of <strong>the</strong> switchboard of cubicles identical to <strong>the</strong> <strong>in</strong>itial cubicle,<br />

<strong>in</strong> accordance with floor space constra<strong>in</strong>ts.<br />

Switchgear renovation<br />

Replacement of old medium and low voltage switchgear and protection devices by retrofit<br />

solutions.<br />

Supply of spare parts<br />

Ensure <strong>the</strong> supply of spare parts for equipment that is no longer commercialized by <strong>the</strong><br />

equipment-produc<strong>in</strong>g departments.<br />

Cost-effective solutions to fit your needs<br />

@ No break <strong>in</strong> cont<strong>in</strong>uity of service,<br />

@ No added civil eng<strong>in</strong>eer<strong>in</strong>g work,<br />

@ No modification of your equipment,<br />

@ Operat<strong>in</strong>g constra<strong>in</strong>ts taken <strong>in</strong>to account,<br />

@ Progressive renovation to fit your budget.<br />

Validated and tested solutions<br />

@ Manufacturer’s warranty on renovated equipment,<br />

@ Factory-validated and tested equipment.<br />

New solutions<br />

@ Compliant with <strong>the</strong> standards <strong>in</strong> effect,<br />

@ Integration of <strong>new</strong>-generation products,<br />

@ Evolv<strong>in</strong>g device technology.


Renovation, retrofit and spare parts solutions<br />

MV cubicles<br />

Fluair range Fluair 100<br />

Commercialization Spare parts supply Spare parts supply<br />

1980 1998 guaranteed 2010 not guaranteed 2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle<br />

width<br />

FG1<br />

FG2<br />

New<br />

630 to 1250 A 7.2 kV 650 mm LF2<br />

DV2<br />

630 to 1250 A 7.2 kV<br />

630 to 3150 A 7.2 kV 900 mm LF3 630 to 3150 A 7.2 kV<br />

DV2 630 to 2500 A 7.2 kV<br />

Fluair 100C<br />

1980<br />

Commercialization Spare parts supply<br />

guaranteed<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle<br />

width<br />

R400<br />

R400D<br />

Fluair 200<br />

New<br />

80 to 250 A 7.2 kV 650 mm R400<br />

R400D<br />

Spare parts supply<br />

not guaranteed<br />

80 to 250 A 7.2 kV<br />

Commercialization Spare parts supply Spare parts supply<br />

1980 1998 guaranteed 2010 not guaranteed 2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle<br />

width<br />

New<br />

FG1 630 to 1250 A 12 kV 650 mm LF2<br />

DV2<br />

630 to 1250 A 17.5 kV<br />

FG2 630 to 3150 A 17.5 kV 900 mm LF3 630 to 3150 A 17.5 kV<br />

DV2 630 to 2500 A 17.5 kV


Modernization<br />

Renovation, retrofit and spare parts solutions<br />

MV cubicles<br />

Fluair range Fluair 24G<br />

www.eastmed.schneider-electric.com<br />

Commercialization Spare parts supply Spare parts supply<br />

1984 1998 guaranteed 2010 not guaranteed 2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Rework<strong>in</strong>g <strong>the</strong> orig<strong>in</strong>al device<br />

Old Cubicle width New<br />

F3 400 to 1250 A 24 kV 500 mm F3 400 to 1250 A 24 kV<br />

Fluair 300<br />

Commercialization Spare parts supply Spare parts supply<br />

1986 1998 guaranteed 2010 not guaranteed 2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle width New<br />

FG3 630 to 1250 A 24 kV 750 mm FG3 630 to 1250 A 24 kV<br />

2500 A 24 kV 1000 mm 2500 A 24 kV<br />

Fluair 400C<br />

Commercialization Spare parts supply Spare parts supply<br />

1980 1987 guaranteed 1999 not guaranteed 2000<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle width New<br />

FC4 1250 to 2500 A 36 kV 1100 mm SF2 1250 to 2500 A 36 kV<br />

Fluair 400G<br />

Commercialization Spare parts supply Spare parts supply<br />

1986 2002 guaranteed 2017 not guaranteed 2018<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle width New<br />

FG4 1250 A 24 kV 900 mm SF1<br />

SF2<br />

1250 A 24 kV<br />

1250 A 36 kV 900 mm SF1<br />

SF2<br />

1250 A 36 kV<br />

2500 to 3000 A 24 kV 1100 mm SF2 2500 to 3150 A 24 kV<br />

2500 A 36 kV 1100 mm SF2 2500 A 36 kV


Renovation, retrofit and spare parts solutions<br />

MV cubicles<br />

Vercors VM6 range CRM<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1975 1993<br />

guaranteed<br />

2008<br />

not guaranteed<br />

2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Rework<strong>in</strong>g <strong>the</strong> orig<strong>in</strong>al device<br />

Old Cubicle<br />

width<br />

R400<br />

R400D<br />

New<br />

400 A 12 kV 500 mm R400<br />

R400D<br />

400 A 12 kV<br />

CM / DDM / IM / IMC / NSM / PM / PMC / QM / QMC<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1975 1993<br />

guaranteed<br />

2008<br />

not guaranteed<br />

2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

DM1 / DM2 / DM22<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1975 1993<br />

guaranteed<br />

2008<br />

not guaranteed<br />

2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle<br />

width<br />

New<br />

FB3 400 to 630 A 24 kV 1000 mm FB4 400 to 630 A 24 kV


Modernization<br />

Renovation, retrofit and spare parts solutions<br />

MV cubicles<br />

Vercors VM6 range DM12<br />

www.eastmed.schneider-electric.com<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1976 1993<br />

guaranteed<br />

2008<br />

not guaranteed<br />

2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle<br />

width<br />

New<br />

FB4 400 to 1250 A 24 kV 750 mm FB4 400 to 1250 A 24 kV<br />

DM23<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1976 1993<br />

guaranteed<br />

2008<br />

not guaranteed<br />

2011<br />

b Complete cubicle<br />

b Cubicles modification<br />

b Cubicle spare parts<br />

b Retrofit/cubicle <strong>in</strong>terface spare part<br />

b Protection device retrofit (see page 25)<br />

b Switchgear retrofit<br />

Old Cubicle<br />

width<br />

New<br />

FB4 400 to 1250 A 24 kV 1000 mm FB4 400 to 1250 A 24 kV


Renovation, retrofit and spare parts solutions<br />

Protection device<br />

retrofit<br />

Application<br />

Busbars<br />

No<br />

automation<br />

Measurement<br />

of I or U<br />

Sepam<br />

series 20<br />

Limited to current<br />

or voltage protection<br />

Old protection device made by<br />

<strong>Schneider</strong> <strong>Electric</strong> or competitor<br />

Applications<br />

Motor, transformer,<br />

substation<br />

Simple<br />

automation<br />

Measurements<br />

of I and U<br />

Sepam<br />

series 40<br />

All types of protection<br />

except for differential<br />

New protection<br />

N.B.: protection renovation should also <strong>in</strong>clude <strong>the</strong> complete study<br />

of <strong>the</strong> LV compartment (diagram, cabl<strong>in</strong>g, equipment).<br />

Application<br />

Generator<br />

Complex<br />

automation<br />

Measurements<br />

of I and U<br />

Sepam<br />

series 80<br />

All types<br />

of protection


Modernization<br />

Renovation, retrofit and spare parts solutions<br />

LV switchboards<br />

Masterbloc range Masterbloc MB100C<br />

www.eastmed.schneider-electric.com<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1991 2003 guaranteed 2013 not guaranteed 2014<br />

b Complete column<br />

b Column spare parts<br />

b Module replacement<br />

Masterpact circuit breaker 1250 A, 1000 Vac/Vdc<br />

Masterpact switch-disconnector 1250 A, 1000 Vac/Vdc<br />

Masterbloc MB100M<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1991 2003 guaranteed 2013 not guaranteed 2014<br />

b Complete column<br />

b Column spare parts<br />

b Module replacement<br />

Compact circuit breaker 3200 A, 1000 Vac/Vdc<br />

Masterbloc MB200<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1988 2003 guaranteed 2013 not guaranteed 2014<br />

b Complete column<br />

b Column spare parts<br />

b Module replacement<br />

Masterpact circuit breaker 6300 A, 1000 Vac/Vdc<br />

Masterpact switch-disconnector 6300 A, 1000 Vac/Vdc<br />

b Adaptation<br />

Compact circuit breaker 1250 A 1000 Vac/Vdc


Renovation, retrofit and spare parts solutions<br />

LV switchboards<br />

Masterbloc range Masterbloc MB400<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1991 2003 guaranteed 2013 not guaranteed 2014<br />

b Complete column<br />

b Column spare parts<br />

b Module replacement<br />

Masterpact circuit breaker 3200 A, 1000 Vac/Vdc<br />

Masterpact switch-disconnector 3200 A, 1000 Vac/Vdc<br />

b Rack replacement<br />

Compact circuit breaker 630 A, 1000 Vac/Vdc<br />

Interpact circuit breaker 630 A, 1000 Vac/Vdc<br />

Contactor 500 A, 1000 Vac/Vdc<br />

Prisma range G / GK / GX / GR / P / PH / UT<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1988 2004 guaranteed 2014 not guaranteed 2015<br />

b Complete switchboard<br />

b Switchboard spare parts<br />

Prisma Plus range G system / P system / P cubicle<br />

Wall-mounted P / Floor-stand<strong>in</strong>g G<br />

Wall-mounted Pack<br />

2003<br />

Commercialization Spare parts supply<br />

guaranteed<br />

b Complete switchboard<br />

b Switchboard spare parts<br />

Spare parts supply<br />

not guaranteed


Modernization<br />

Renovation, retrofit and spare parts solutions<br />

LV switchgear<br />

Withdrawable low-rat<strong>in</strong>g Selpact<br />

Withdrawable truck type Masterpact NT<br />

Withdrawable high-rat<strong>in</strong>g Selpact<br />

Withdrawable truck type Masterpact NW<br />

www.eastmed.schneider-electric.com<br />

Low-rat<strong>in</strong>g Selpact<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1973 1989<br />

guaranteed<br />

1998<br />

not guaranteed<br />

2009<br />

b Device spare parts<br />

b Retrofit/switchboard <strong>in</strong>terface spare part<br />

b Device manufactur<strong>in</strong>g<br />

b Device repair<strong>in</strong>g<br />

b Switchgear retrofit<br />

Correspond<strong>in</strong>g functions: v fixed V fixed with pad<br />

v fixed V withdrawable with pad<br />

v withdrawable V withdrawable with pad<br />

v withdrawable V withdrawable with truck<br />

Old: low-rat<strong>in</strong>g Selpact New: Masterpact<br />

Type Isc (kA) In (A) Type Isc (kA) In (A)<br />

DN2 50 630/1000 NT H2 50 630/1000<br />

DR2/DRS2 100 630/1000 NT L1 150 630/1000<br />

DS2 45 630/1000/1250 NT H2 50 630/1000/1250<br />

High-rat<strong>in</strong>g Selpact<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1973 1989<br />

guaranteed<br />

1998<br />

not guaranteed<br />

2009<br />

b Device spare parts<br />

b Retrofit/switchboard <strong>in</strong>terface spare part<br />

b Device manufactur<strong>in</strong>g<br />

b Device repair<strong>in</strong>g<br />

b Switchgear retrofit<br />

Correspond<strong>in</strong>g functions: v fixed V fixed with pad<br />

v withdrawable V withdrawable with pad<br />

v withdrawable V withdrawable with truck<br />

Old: high-rat<strong>in</strong>g Selpact New: Masterpact<br />

Type Isc (kA) In (A) Type Isc (kA) In (A)<br />

DN2/DS2 50 1600 to 3200 NW H1 65 1600 to 3200<br />

DN2H/DS2H 70 1600 NW H2 100 1600<br />

80 2000 to 3200 100 2000 to 3200


Renovation, retrofit and spare parts solutions<br />

LV switchgear<br />

DA<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1968 1990<br />

guaranteed<br />

1998<br />

not guaranteed<br />

2009<br />

b Device spare parts<br />

b Retrofit/switchboard <strong>in</strong>terface spare part<br />

b Device manufactur<strong>in</strong>g<br />

b Device repair<strong>in</strong>g<br />

b Switchgear retrofit<br />

Correspond<strong>in</strong>g functions: v fixed V fixed with pad<br />

v withdrawable V withdrawable with pad<br />

Old: DA New: Masterpact<br />

Type Isc (kA) In (A) Type Isc (kA) In (A)<br />

DNA1 70 1600/2000 NW H2 65 1600/2000<br />

100 2500/3200 100 2500/3200<br />

100 4000/5000 Please consult us<br />

DNA2 45 630 to 1250 NW H1 65 800 to 1250<br />

50 1600 to 2500 65 1600 to 2500<br />

DNAH 100 1600/2000 NW H2 100 1600/2000<br />

DRA 100 630 to 2000 100 800 to 2000<br />

DSA1 50 800 to 1250 NW H1 65 800 to 1250<br />

60 1600/2000 65 1600/2000<br />

85 2500/3200 NW H2 100 2500/3200<br />

85 4000 Please consult us<br />

100 5000 Please consult us<br />

DSA2 35 800 to 1250 NW N1 42 800 to 1250<br />

Compact<br />

45 1600 to 2500 NW H1 65 1600 to 2500<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1981 1997<br />

guaranteed<br />

2000<br />

not guaranteed<br />

2002<br />

b Device spare parts<br />

b Retrofit/switchboard <strong>in</strong>terface spare part<br />

b Device manufactur<strong>in</strong>g<br />

b Device repair<strong>in</strong>g<br />

b Switchgear retrofit<br />

Old: Compact New: Masterpact<br />

Type Poles Function In (A) Type Poles Function In (A)<br />

C1250 STC 3 P Withdrawable 1250 NT Please consult us


Modernization<br />

Renovation, retrofit and spare parts solutions<br />

LV switchgear<br />

www.eastmed.schneider-electric.com<br />

Masterpact<br />

Commercialization Spare parts supply<br />

Spare parts supply<br />

1986 2003<br />

guaranteed<br />

2005<br />

not guaranteed<br />

2006<br />

b Device spare parts<br />

b Retrofit/switchboard <strong>in</strong>terface spare part<br />

b Device manufactur<strong>in</strong>g<br />

b Device repair<strong>in</strong>g<br />

b Switchgear retrofit<br />

Old: Masterpact M New: Masterpact NW<br />

Type Poles Function In (A) Type Poles Function In (A)<br />

M 3 P Withdrawable 800 to 3200 Plug and Play 3 P Withdrawable 800 to 3200<br />

Fixed/ 800 to 4000 Masterkit 3 P Fixed/ 800 to 4000<br />

Withdrawable<br />

Withdrawable<br />

Fixed/<br />

Withdrawable<br />

5000 to 6300 Please consult us<br />

4 P Fixed/<br />

Withdrawable<br />

800 to 6300 Please consult us<br />

Plug and Play solution<br />

The Masterpact NW can be mounted <strong>in</strong> <strong>the</strong> Masterpact M frame.<br />

The Plug and Play solution consists of:<br />

b a Masterpact that has been adapted and fitted with special power connections<br />

b a f<strong>in</strong>e wire cross-member<br />

b a pair of correspond<strong>in</strong>g drawers.<br />

Masterkit solution<br />

Complete Masterpact M replacement kit.<br />

The kit consists of:<br />

b Masterpact NW<br />

b power connections accord<strong>in</strong>g to rat<strong>in</strong>g<br />

b frame, <strong>in</strong> <strong>the</strong> case of a withdrawable device<br />

b attachment bracket, <strong>in</strong> <strong>the</strong> case of a fixed device<br />

b wire bundle<br />

b <strong>in</strong>sulat<strong>in</strong>g plate<br />

b door faceplate<br />

b screw kit.


Renovation, retrofit and spare parts solutions<br />

Retrofitt<strong>in</strong>g<br />

competitors’ devices<br />

Medium voltage<br />

Medium-voltage devices can be replaced accord<strong>in</strong>g to <strong>the</strong> retrofit or retrofil pr<strong>in</strong>ciple.<br />

In <strong>the</strong> case of medium-voltage devices manufactured by our competitors, <strong>the</strong> retrofil solution is <strong>the</strong> simplest and fastest method<br />

of replac<strong>in</strong>g a customer’s equipment. We can renovate a customer’s orig<strong>in</strong>al truck and fit it with a <strong>Schneider</strong> <strong>Electric</strong> device,<br />

circuit breaker or contactor.<br />

The power connection elements are ei<strong>the</strong>r renovated or reconditioned.<br />

The devices are <strong>the</strong>n tested for dielectric withstand and overheat<strong>in</strong>g and undergo mechanical tests.<br />

Examples of MV devices<br />

Brand Type Techno Rat<strong>in</strong>g New device<br />

ABB Contactor C1 Air 250 A 7.2 kV Contactor<br />

Rollarc R400<br />

ALSTOM Circuit breaker<br />

CB411<br />

DELLE Circuit breaker<br />

HG3<br />

Low voltage<br />

The retrofit pr<strong>in</strong>ciple can be used to replace low-voltage devices manufactured by our competitors.<br />

Both <strong>the</strong> device and its truck can be replaced with a complete <strong>Schneider</strong> <strong>Electric</strong> device and <strong>the</strong><br />

auxiliaries connections recreated.<br />

With <strong>the</strong> retrofit solution, as <strong>the</strong> devices have already been tested,<br />

only a power connection overheat<strong>in</strong>g test is carried out.<br />

Oil 2900 A 7.2 kV Circuit breaker<br />

LF3<br />

Oil 2500 A 7.2 kV Circuit breaker<br />

LF3<br />

BBC Circuit breaker Oil 630 A 7.2 kV Circuit breaker<br />

LF1<br />

BBC Circuit breaker Oil 2000 A 7.2 kV Circuit breaker<br />

LF2<br />

BBC Circuit breaker<br />

W-RM/W-RG<br />

Calor Emag Circuit breaker<br />

ODM3<br />

Calor Emag Circuit breaker<br />

ZE4WL<br />

Oil 1250 A 17.5 kV Circuit breaker<br />

DV2<br />

Oil 1250 A 13.8 kV Circuit breaker<br />

LF2<br />

Oil 1250 A 13.8 kV Circuit breaker<br />

LF2<br />

CEM Contactor GF SF6 250 A 7.2 kV Contactor<br />

Rollarc R400<br />

SIEMENS Circuit breaker Oil 630 A 7.2 kV Circuit breaker<br />

DV2<br />

Examples of LV devices<br />

Brand Type Rat<strong>in</strong>g New device<br />

UNELEC CNP 1000 1000 A 4 P Masterpact NT 10 H1<br />

UNELEC CS 1250 1250 A 3 P Masterpact NW 12 H1<br />

UNELEC CS 2500 2500 A 3 P Masterpact NW 25 H1


Monitor<strong>in</strong>g and protect<strong>in</strong>g<br />

your low voltage network<br />

Masterpact can be <strong>in</strong>tegrated <strong>in</strong> a general supervision system<br />

to optimise your electrical <strong>in</strong>stallation.<br />

TCP-IP E<strong>the</strong>rnet Network<br />

Local communication with FDM121<br />

All Masterpact NT / NW circuit breakers can<br />

be connected to a high-visibility FDM121 front<br />

display module. Ma<strong>in</strong>tenance personnel will<br />

have convenient access to all data directly<br />

from <strong>the</strong> panel of <strong>the</strong> electrical cab<strong>in</strong>et.<br />

Ensur<strong>in</strong>g safety at any time<br />

Intranet<br />

Modbus Network<br />

All Masterpact are equipped with a Micrologic electronic control unit that offers all types of current<br />

and advanced protection, measurement and communication. Protection functions are separated<br />

from <strong>the</strong> measurement functions and are managed by an ASIC electronic component.<br />

This <strong>in</strong>dependence guarantees immunity from conducted or radiated disturbances and ensures<br />

<strong>the</strong> highest degree of reliability.<br />

Optimis<strong>in</strong>g <strong>the</strong> <strong>management</strong> of your electrical <strong>in</strong>stallation<br />

When equipped with a Micrologic types E, P or H, Masterpact can be <strong>in</strong>tegrated <strong>in</strong> a general<br />

supervision system to optimise <strong>in</strong>stallation operation and ma<strong>in</strong>tenance. Alarms may be programmed<br />

for remote <strong>in</strong>dications. Used with PowerLogic ION Enterprise software, you can exploit <strong>the</strong> electrical<br />

data )current, voltage, <strong>energy</strong>, frequency, power, and power quality( to optimise cont<strong>in</strong>uity of service<br />

and <strong>energy</strong> <strong>management</strong>:<br />

• reduce <strong>energy</strong> and operations costs;<br />

• improve power quality, reliability and uptime;<br />

• optimise equipment use.<br />

Maximis<strong>in</strong>g cont<strong>in</strong>uity of service<br />

Because a LV power supply <strong>in</strong>terruption is unacceptable especially <strong>in</strong> critical power applications,<br />

an automatic system is required for LV transfer switch<strong>in</strong>g. For your peace of m<strong>in</strong>d, Masterpact enables<br />

automatic control and <strong>management</strong> of power sources <strong>in</strong> your low voltage distribution network<br />

guarantee<strong>in</strong>g <strong>the</strong> hi-reliability of your <strong>in</strong>stallation.<br />

Micrologic Control Units<br />

All Masterpact are equipped with<br />

a Micrologic electronic control unit<br />

that offers a complete set of<br />

protections and state of<br />

<strong>the</strong> art measurements.<br />

EGX300 gateway-server<br />

or iRIO RTU<br />

The EGX300 web-enabled<br />

gateway-server or <strong>the</strong> iRIO RTU<br />

(remote term<strong>in</strong>al unit) can both<br />

be used as E<strong>the</strong>rnet coupler for<br />

<strong>the</strong> PowerLogic System devices<br />

and for any o<strong>the</strong>r communicat<strong>in</strong>g<br />

devices operat<strong>in</strong>g under Modbus<br />

RS485 protocol. Data is viewable<br />

via a standard web browser.<br />

PowerLogic ION Enterprise<br />

PowerLogic ION Enterprise<br />

software is a complete power<br />

<strong>management</strong> solution for your<br />

facility or plant operations.<br />

It can be connected to Masterpact<br />

through E<strong>the</strong>rnet/Modbus protocol.<br />

"Plug and Play" retrofit solution<br />

<strong>Schneider</strong> <strong>Electric</strong> proposes a fast and simple implementation<br />

with considerably reduc<strong>in</strong>g on-site <strong>in</strong>tervention time<br />

and get <strong>the</strong> performance of last generation device.<br />

30 m<strong>in</strong>utes<br />

<strong>Schneider</strong> <strong>Electric</strong> East Mediterranean s.a.l.<br />

Tabaris, Charles Malek Avenue, Tabaris Centre 1063, 10 th Floor<br />

P.O. Box : 166223 - Beirut, Lebanon<br />

Tel. +961 1 204 502<br />

Fax +961 1 204 458<br />

www.eastmed.schneider-electric.com<br />

The orig<strong>in</strong>al Masterpact M chassis is kept<br />

)no <strong>in</strong>tervention on <strong>the</strong> switchboard structure(<br />

and 2 easy operations<br />

The retrofit solutions use a factory modified<br />

and adapted Masterpact NW which is <strong>in</strong>stalled<br />

<strong>in</strong> <strong>the</strong> Masterpact M’s orig<strong>in</strong>al chassis.<br />

Masterpact NW adapted<br />

for <strong>the</strong> "Plug and Play" solution<br />

Masterpact M<br />

≤ 3200 A<br />

Cyprus + 357 24 812 649 • customercare.cy@schneider-electric.com<br />

Iraq + 962 6 516 6260 • customercare.iq@schneider-electric.com<br />

Jordan + 962 6 516 6465 • customercare.jo@schneider-electric.com<br />

Lebanon + 961 1 321 645 • customercare.lb@schneider-electric.com<br />

Syria + 963 11 6124799 • customercare.sy@schneider-electric.com<br />

EMEDNWBR0411EN 04 / 2011<br />

"Plug & Play"<br />

Retrofit on NW low voltage circuit breakers<br />

Network<br />

protection<br />

Compact Supervision<br />

Masterpact NT and NW<br />

LV power circuit breakers 630 to 6300 A<br />

Cover<strong>in</strong>g<br />

all your applications<br />

Masterpact meets <strong>the</strong> needs of all types of LV electrical distribution networks.<br />

Build<strong>in</strong>g<br />

• Hotels<br />

• Hospitals<br />

• Offices<br />

• Retail<br />

Masterpact UR<br />

Data Centres<br />

and Networks<br />

Whenever high short circuit is <strong>in</strong>volved<br />

Industry<br />

• M<strong>in</strong><strong>in</strong>g and m<strong>in</strong>erals<br />

• Automotive<br />

• Food and beverage<br />

• Chemical <strong>in</strong>dustry<br />

Masterpact provides an answer to specific applications.<br />

Masterpact UR is a low voltage ultra rapid open<strong>in</strong>g circuit breaker. Its fault<br />

detection rate and its reaction speed mean that it will stop a short circuit from<br />

develop<strong>in</strong>g. As a result, this is <strong>the</strong> key component <strong>in</strong> very high power<br />

<strong>in</strong>stallations equipped with a number of power sources connected <strong>in</strong> parallel.<br />

Masterpact UR truly comes <strong>in</strong>to its own when short circuit currents can reach<br />

very high levels and when cont<strong>in</strong>uity of service is a must: offshore<br />

<strong>in</strong>stallations, cement plants, petrochemical <strong>in</strong>dustry. It is also especially<br />

suited to electrical <strong>in</strong>stallations on board merchant ships.<br />

Energy and Infrastructures<br />

• Airports<br />

• Oil and gas<br />

• Water<br />

• <strong>Electric</strong>al <strong>energy</strong><br />

• Mar<strong>in</strong>e<br />

• W<strong>in</strong>d turb<strong>in</strong>es<br />

• 1000 V for m<strong>in</strong>es<br />

• Direct current networks<br />

• Corrosion protection<br />

• Switch-disconnectors and earth<strong>in</strong>g switches<br />

• Automatic transfer switch<strong>in</strong>g equipment )ATSE( for emergency power systems<br />

• High electrical endurance applications: Masterpact NT H2 is a high performance device offer<strong>in</strong>g high break<strong>in</strong>g capacity<br />

)Icu: 50 kA/480 V( and a high level of discrim<strong>in</strong>ation, all <strong>in</strong> a small volume


Concentrated know-how<br />

Aim<strong>in</strong>g at standardis<strong>in</strong>g electrical switchboards at a time when<br />

<strong>in</strong>stallations are <strong>in</strong>creas<strong>in</strong>gly complex, Masterpact provides an<br />

unequalled simplicity, both concern<strong>in</strong>g choice and <strong>in</strong>stallation.<br />

Optimised volumes<br />

Masterpact is <strong>the</strong> smallest power circuit breaker <strong>in</strong> <strong>the</strong> world, concentrat<strong>in</strong>g all <strong>the</strong> performances of a sophisticated power circuit<br />

breaker <strong>in</strong> compact dimensions. Masterpact thus optimises <strong>the</strong> <strong>in</strong>stallation and guarantees its operation <strong>in</strong> complete peace of m<strong>in</strong>d.<br />

Ease of <strong>in</strong>stallation<br />

Masterpact range has been designed to standardise switchboards and simplify <strong>in</strong>stallation:<br />

• s<strong>in</strong>gle pole pitch for each physical size: 115/230 mm for NW, 70 mm for NT;<br />

• <strong>in</strong>com<strong>in</strong>g connection to top or bottom term<strong>in</strong>als: front or horizontal or vertical rear connections that can be modified<br />

on-site without chang<strong>in</strong>g <strong>the</strong> depth;<br />

• no derat<strong>in</strong>g up to 55 °C and 4000 A.<br />

Maximum security<br />

The arc chutes absorb <strong>the</strong> <strong>energy</strong> released dur<strong>in</strong>g break<strong>in</strong>g, thus limit<strong>in</strong>g <strong>the</strong> stresses exerted on <strong>the</strong> <strong>in</strong>stallation.<br />

They filter and cool <strong>the</strong> gases produced, reduc<strong>in</strong>g effects perceptible from <strong>the</strong> outside.<br />

Masterpact NT Masterpact NW<br />

All standards<br />

Masterpact is<br />

compliant with<br />

<strong>in</strong>ternational standards<br />

IEC 60947-1 and 2,<br />

IEC 68230 for type 2<br />

tropicalisation, UL489,<br />

ANSI/UL1066, CCC<br />

and GOST.<br />

More than<br />

60<br />

patents<br />

86%<br />

of materials can be<br />

recycled at <strong>the</strong> end<br />

of product life.<br />

Compliance with environmental<br />

requirements<br />

The materials used for Masterpact are not<br />

potentially dangerous to <strong>the</strong> environment and<br />

are marked to facilitate sort<strong>in</strong>g for recycl<strong>in</strong>g.<br />

Production facilities are non-pollut<strong>in</strong>g <strong>in</strong><br />

compliance with <strong>the</strong> ISO 14001 standard.<br />

Common characteristics<br />

Number of poles 3 /4<br />

Rated <strong>in</strong>sulation voltage (V) Ui 1000<br />

Impulse withstand voltage (kV) Uimp 12<br />

Rated operational volt. (V AC 50 /60 Hz) Ue 690<br />

Suitability for isolation IEC 60947- 2<br />

Degree of pollution IEC 60664 -1 3<br />

Circuit breakers<br />

and switch-disconnectors<br />

NT06 to NT16<br />

Sensor selection<br />

Sensor rat<strong>in</strong>g (A) 250 (1) 400 630 800 1000 1250 1600<br />

Ir threshold set. (A) 100 160 250 320 400 500 640<br />

to 250 to 400 to 630 to 800 to 1000 to 1250 to 1600<br />

(1) For NT02 rat<strong>in</strong>g, please consult us.<br />

Circuit breaker characteristics as per IEC 60947 - 2 NT06 NT08 NT10 NT12 NT16<br />

Rated current (A) In 40 /50 °C (1) 630 800 1000 1250 1600<br />

Rat<strong>in</strong>g of 4th pole (A) 630 800 1000 1250 1600<br />

Sensor rat<strong>in</strong>gs (A) 400 to 630 400 to 800 400 to 1000 630 to 1250 800 to 1600<br />

Type of circuit breaker H1 H2 L1 (2) H1 H2<br />

Ultimate break<strong>in</strong>g capacity (kA rms)<br />

V AC 50/ 60 Hz<br />

Icu 220/ 415 V 42 50 150 42 50<br />

440 V 42 50 130 42 50<br />

525 V 42 42 100 42 42<br />

690 V 42 42 25 42 42<br />

Rated service break<strong>in</strong>g capacity (kA rms) Ics % Icu 100% 100%<br />

Utilisation category B B A B B<br />

Rated short-time withstand current (kA rms) Icw 0.5 s 42 36 10 42 36<br />

V AC 50/ 60 Hz<br />

1 s 42 36 - 42 36<br />

3 s 24 20 - 24 20<br />

Integrated <strong>in</strong>stantaneous protection (kA peak ±10 %) - 90 10xIn (3) - 90<br />

Rated mak<strong>in</strong>g capacity (kA peak)<br />

Icm 220/ 415 V 88 105 330 88 105<br />

V AC 50/ 60 Hz<br />

440 V 88 105 286 88 105<br />

525 V 88 88 220 88 88<br />

690 V 88 88 52 88 88<br />

Break time (ms) between tripp<strong>in</strong>g order and arc ext<strong>in</strong>ction 25 25 9 25 25<br />

Clos<strong>in</strong>g time (ms) < 50 < 50<br />

Circuit breaker characteristics as per NEMA AB1<br />

Break<strong>in</strong>g capacity (kA)<br />

V AC 50/ 60 Hz<br />

240 V 42 50 150 42 50<br />

480 V 42 50 100 42 50<br />

600 V 42 42 25 42 42<br />

Switch-disconnector characteristics as per IEC 60947- 3 and Annex A<br />

Type of switch-disconnector HA HA<br />

Rated mak<strong>in</strong>g capacity (kA peak)<br />

Icm 220 V 75 75<br />

AC23A/AC3 category - V AC 50/ 60 Hz<br />

440 V 75 75<br />

525/ 690 V 75 75<br />

Rated short-time withstand current (kA rms) Icw 0.5 s 36 36<br />

AC23A/AC3 category - V AC 50/ 60 Hz<br />

1 s 36 36<br />

3 s 20 20<br />

Ultimate break<strong>in</strong>g capacity Icu (kA rms)<br />

with an external protection relay<br />

Maximum time delay: 350 ms<br />

690 V 36 36<br />

Mechanical and electrical durability as per IEC 60947- 2/ 3 at In/Ie<br />

Service life<br />

C/O cycles x 1000<br />

Mechanical without ma<strong>in</strong>tenance 12.5<br />

Type of circuit breaker H1 H2 L1 H1 H2 L1 H1 H2 L1 H1 H2 H1 H2<br />

Rated current In (A) 630 800 1000 1250 1600<br />

C/O cycles x 1000 <strong>Electric</strong>al without ma<strong>in</strong>tenance 440 V (4) 6 6 3 6 6 3 6 6 3 6 6 3 3<br />

IEC 60947 - 2 690 V 3 3 2 3 3 2 3 3 2 3 3 1 1<br />

Type of circuit breaker or switch-disconnector H1 / H2 / HA<br />

Rated operationnal current Ie (A) AC23A 630 800 1000 1250 1600<br />

C/O cycles x 1000 <strong>Electric</strong>al without ma<strong>in</strong>tenance 440 V (4) 6 6 6 6 3<br />

IEC 60947 - 3 690V 3 3 3 3 1<br />

Type of circuit breaker or switch-disconnector H1 / H2 / HA<br />

Rated operationnal current Ie (A) AC3 (5) 500 630 800 1000 1000<br />

Motor power (kW) 380 /415 V ≤ 250 250 to 335 335 to 450 450 to 560 450 to 560<br />

440 V ≤ 300 300 to 400 400 to 500 500 to 630 500 to 630<br />

C/O cycles x 1000 <strong>Electric</strong>al without ma<strong>in</strong>tenance 440 V (4) 6<br />

IEC 60947 - 3 Annex M/IEC 60947 - 4 - 1 690 V -<br />

(1) 50 °C: rear vertical connected. Refer to temperature derat<strong>in</strong>g tables for o<strong>the</strong>r connection types.<br />

(2) See <strong>the</strong> current-limit<strong>in</strong>g curves <strong>in</strong> <strong>the</strong> "additional characteristics" section.<br />

(3) SELLIM system.<br />

(4) Available for 480 V NEMA.<br />

(5) Suitable for motor control (direct-on-l<strong>in</strong>e start<strong>in</strong>g).<br />

Circuit breakers and<br />

switch-disconnectors<br />

NW08 to NW63<br />

Common characteristics<br />

Number of poles 3/ 4<br />

Rated <strong>in</strong>sulation voltage (V) Ui 1000/ 1250<br />

Impulse withstand voltage (kV) Uimp 12<br />

Rated operational voltage (V AC 50 / 60 Hz) Ue 690 /1150<br />

Suitability for isolation IEC 60947 - 2<br />

Degree of pollution IEC 60664 - 1 4 (1000 V) / 3 (1250 V)<br />

Sensor selection<br />

Sensor rat<strong>in</strong>g (A) 250 (1) 400 630 800 1000 1250 1600 2000 2500 3200 4000 5000 6300<br />

Ir threshold sett<strong>in</strong>g (A) 100 160 250 320 400 500 630 800 1000 1250 1600 2000 2500<br />

to 250 to 400 to 630 to 800 to 1000 to 1250 to 1600 to 2000 to 2500 to 3200 to 4000 to 5000 to 6300<br />

(1) For NW02 rat<strong>in</strong>g, please consult us.<br />

Circuit breaker characteristics as per IEC 60947 - 2 NW08 NW10 NW12 NW16 NW20 NW25 NW32 NW40 NW40b NW50 NW63<br />

Rated current (A) at 40 °C / 50 °C (1) 800 1000 1250 1600 2000 2500 3200 4000 4000 5000 6300<br />

Rat<strong>in</strong>g of 4th pole (A) 800 1000 1250 1600 2000 2500 3200 4000 4000 5000 6300<br />

Sensor rat<strong>in</strong>gs (A) 400 400 630 800<br />

1000<br />

1250 1600 2000<br />

2000 2500 3200<br />

to 800 to 1000 to 1250 to 1600<br />

to 2000<br />

to 2500 to 3200 to 4000<br />

to 4000 to 5000 to 6300<br />

Type of circuit breaker N1 H1 H2 L1 (2) H10 H1 H2 H3 L1 (2) H10 H1 H2 H3 H10 H1 H2<br />

Ultimate break<strong>in</strong>g capacity (kA rms) Icu 220 /415/ 440 V 42 65 100 150 - 65 100 150 150 - 65 100 150 - 100 150<br />

V AC 50/ 60 Hz 525 V 42 65 85 130 - 65 85 130 130 - 65 85 130 - 100 130<br />

690 V 42 65 85 100 - 65 85 100 100 - 65 85 100 - 100 100<br />

1150 V - - - - 50 - - - - 50 - - - 50 - -<br />

Rated service break<strong>in</strong>g capacity (kA rms) Ics % Icu 100% 100% 100% 100%<br />

Utilisation category B B B B<br />

Rated short-time withstand current (kA rms)<br />

Icw 1 s 42 65 85 30 50 65 85 65 30 50 65 85 65 50 100 100<br />

V AC 50 /60 Hz<br />

3 s 22 36 50 30 50 36 75 65 30 50 65 75 65 50 100 100<br />

Integrated <strong>in</strong>stantaneous protection (kA peak ±10 %) - - 190 80 - - 190 150 80 - - 190 150 - - 270<br />

Rated mak<strong>in</strong>g capacity (kA peak)<br />

Icm 220 /415 /440 V 88 143 220 330 - 143 220 330 330 - 143 220 330 - 220 330<br />

V AC 50 /60 Hz<br />

525 V 88 143 187 286 - 143 187 286 286 - 143 187 286 - 220 286<br />

690 V 88 143 187 220 - 143 187 220 220 - 143 187 220 - 220 220<br />

1150 V - - - - 105 - - - - 105 - - - 105 - -<br />

Break time (ms) between tripp<strong>in</strong>g order and arc ext<strong>in</strong>ction 25 25 25 10 25 25 25 25 10 25 25 25 25 25 25 25<br />

Clos<strong>in</strong>g time (ms)<br />

Circuit breaker characteristics as per NEMA AB1<br />

< 70 < 70 < 70 < 80<br />

Break<strong>in</strong>g capacity (kA) 240 /480 V 42 65 100 150 - 65 100 150 150 - 65 100 150 - 100 150<br />

V AC 50/ 60 Hz<br />

Unprotected circuit breaker characteristics:<br />

Tripp<strong>in</strong>g by shunt trip as per IEC 60947 - 2<br />

600 V 42 65 85 100 - 65 85 100 100 - 65 85 100 - 100 100<br />

Type of circuit breaker HA HF (3) HA HF (3) HA HF (3) HA<br />

Ultimate break<strong>in</strong>g capacity (kA rms) V AC 50 /60 Hz Icu 220...690 V 50 85 50 85 55 85 85<br />

Rated service break<strong>in</strong>g capacity (kA rms) Ics % Icu 100% 100% 100% 100%<br />

Rated short-time withstand current (kA rms) Icw 1 s 50 85 50 85 55 85 85<br />

3 s 36 50 36 75 55 75 85<br />

Overload and short-circuit protection with external protection relay:<br />

short-circuit protection, maximum delay: 350 ms (4)<br />

- - - - - - -<br />

Rated mak<strong>in</strong>g capacity (kA peak) V AC 50/ 60 Hz Icm 220...690 V 105 187 105 187 121 187 187<br />

Switch-disconnector characteristics as per IEC 60947 - 3 and Annex A NW08 / NW10 / NW12/ NW16 NW20 NW25 / NW32 / NW40 NW40b / NW50 / NW63<br />

Type of switch-disconnector NA HA HF HA10 HA HF HA10 HA HF HA10 HA<br />

Rated mak<strong>in</strong>g capacity (kA peak)<br />

Icm 220...690 V 88 105 187 - 105 187 - 121 187 - 187<br />

AC23A/AC3 category - V AC 50/ 60 Hz<br />

1150 V - - - 105 - - 105 - - 105 -<br />

Rated short-time withstand current (kA rms)<br />

Icw 1 s 42 50 85 50 50 85 50 55 85 50 85<br />

AC23A/AC3 category - V AC 50/ 60 Hz<br />

Earth<strong>in</strong>g switch<br />

3 s - 36 50 50 36 50 50 55 75 50 85<br />

Latch<strong>in</strong>g capacity (kA peak) 135<br />

Rat<strong>in</strong>g short time withstand (kA rms) Icw 1 s 60 Hz<br />

Mechanical and electrical durability as per IEC 60947- 2/ 3 at In/Ie<br />

3 s 50 Hz<br />

Service life Mechanical with ma<strong>in</strong>tenance 25 20 10<br />

C/O cycles x 1000 without ma<strong>in</strong>tenance 12.5 10 5<br />

Type of circuit breaker N1 / H1 / H2 L1 H10 H1 / H2 H3 L1 H10 H1 / H2 H3 H10 H1 H2<br />

Rated current In (A) 800 / 1000 / 1250 / 1600 2000 2500 / 3200 / 4000 4000b / 5000 / 6300<br />

C/O cycles x 1000 <strong>Electric</strong>al without ma<strong>in</strong>tenance 440 V (5) 10 3 - 8 2 3 - 5 1.25 - 1.5 1.5<br />

IEC 60947 - 2 690 V 10 3 - 6 2 3 - 2.5 1.25 - 1.5 1.5<br />

1150 V - - 0.5 - - - 0.5 - - 0.5 - -<br />

Type of circuit breaker or switch-disconnector H1 / H2 / HA / HF H1 / H2 / H3 / HA / HF H1 / H2 / HA<br />

Rated operational current Ie (A) AC23A 800 / 1000 / 1250 / 1600 2000 2500 / 3200 / 4000 4000b / 5000 / 6300<br />

C/O cycles x 1000 <strong>Electric</strong>al without ma<strong>in</strong>tenance 440 V (5) 10 8 5 1.5<br />

IEC 60947 - 3 690 V 10 6 2.5 1.5<br />

Type of circuit breaker or switch-disconnector H1 / H2 / HA / HF H1 / H2 / H3 / HA / HF<br />

Rated operational current Ie (A) AC3 (6) 800 1000 1250 1600 2000<br />

Motor power 380 / 415 V (kW) 335 to 450 450 to 560 560 to 670 670 to 900 900 to 1150<br />

440 V (5) (kW) 400 to 500 500 to 630 500 to 800 800 to 1000 1000 to 1300<br />

690 V (kW) ≤ 800 800 to 1000 1000 to 1250 1250 to 1600 1600 to 2000<br />

C/O cycles x 1000 <strong>Electric</strong>al without ma<strong>in</strong>tenance 440 / 690 V (5) IEC 60947 - 3 Annex M/IEC 60947- 4- 1<br />

6<br />

(1) 50 °C: rear vertical connected. Refer to temperature derat<strong>in</strong>g tables for o<strong>the</strong>r connection types. (2) See <strong>the</strong> current-limit<strong>in</strong>g curves <strong>in</strong> <strong>the</strong> "additional characteristics" section. (3) Equipped with a trip unit with a mak<strong>in</strong>g current of 90 kA peak. (4) External protection must comply with permissible <strong>the</strong>rmal constra<strong>in</strong>ts of <strong>the</strong> circuit breaker (please consult us). No fault-trip <strong>in</strong>dication by <strong>the</strong> SDE or <strong>the</strong> reset button.<br />

(5) Available for 480 V NEMA. (6) Suitable for motor control (direct-on-l<strong>in</strong>e start<strong>in</strong>g).


<strong>Electric</strong>al Management Services<br />

Energy Sav<strong>in</strong>g<br />

Make <strong>the</strong> most of your <strong>energy</strong> SM<br />

Energy and production costs<br />

You’re look<strong>in</strong>g for ways to make productivity ga<strong>in</strong>s<br />

www.eastmed.schneider-electric.com<br />

You’re <strong>in</strong> a competitive sector<br />

with strong pressure on profitability<br />

due to <strong>the</strong> ris<strong>in</strong>g cost of <strong>energy</strong><br />

Energy is hav<strong>in</strong>g an <strong>in</strong>creas<strong>in</strong>gly<br />

significant impact on each product<br />

• You’re look<strong>in</strong>g for a better understand<strong>in</strong>g<br />

of your <strong>energy</strong> situation.<br />

• You want to turn this constra<strong>in</strong>t <strong>in</strong>to an<br />

opportunity for progress.


<strong>Electric</strong>al Management Services<br />

Energy Sav<strong>in</strong>g<br />

<strong>Schneider</strong> <strong>Electric</strong> Solutions<br />

<strong>Schneider</strong> <strong>Electric</strong> East Mediterranean s.a.l.<br />

Tabaris, Charles Malek Avenue, Tabaris Centre 1063, 10 th Floor<br />

P.O. Box : 166223 - Beirut, Lebanon<br />

Tel. +961 1 204 502<br />

Fax +961 1 204 458<br />

www.eastmed.schneider-electric.com<br />

Implementation of quick-w<strong>in</strong> solutions<br />

Power Factor Correction<br />

& Harmonic Filter<strong>in</strong>g<br />

Benefits<br />

@ Remove reactive power charges<br />

from your <strong>energy</strong> bill and reduce<br />

your <strong>energy</strong> bill by 5 to 10%<br />

@ Elim<strong>in</strong>ate nuisance tripp<strong>in</strong>gs<br />

and down time<br />

@ Preserve lifetime of motors and<br />

sensitive equipment<br />

@ Increase availability of power<br />

for future expansion<br />

@ Reduce capital expenditure<br />

for expansion<br />

Variable Speed Drives Power Monitor<strong>in</strong>g & Control<br />

Benefits<br />

@ Reduce <strong>energy</strong> bill (up to 30%)<br />

and CO 2 emissions<br />

@ Remove your <strong>in</strong>vestment risk<br />

@ Solutions operate transparently<br />

once <strong>in</strong>stalled<br />

@ Increase lifespan of equipment<br />

@ Reduce ma<strong>in</strong>tenance cost and<br />

down time<br />

Implementation of full solutions for specific applications<br />

Power monitor<strong>in</strong>g, all fluids and energies<br />

> Ga<strong>in</strong>: consumption that closely fits <strong>in</strong>dustrial needs<br />

> Studies: outside production periods or cycles and dur<strong>in</strong>g production cycles, analysis<br />

of production start-up and shutdown.<br />

Compressed air<br />

> Ga<strong>in</strong>: detection of leaks and adaptation of operat<strong>in</strong>g pressure, efficiency<br />

> Measurement of flow rates, analysis of consumers and operat<strong>in</strong>g costs<br />

Positive cold refrigeration, process cool<strong>in</strong>g, <strong>in</strong>dustrial water<br />

> Ga<strong>in</strong>: organisation of refrigerat<strong>in</strong>g power, leak detection, adaptation of operat<strong>in</strong>g<br />

pressure, efficiency<br />

> Measurement of flow rates, analysis of consumers and operat<strong>in</strong>g costs<br />

Behaviour and communication<br />

> Ga<strong>in</strong>: empowerment regard<strong>in</strong>g <strong>the</strong> l<strong>in</strong>k consumption / production<br />

> Best practices on <strong>the</strong> part of <strong>management</strong> and production operators<br />

Indoor and outdoor light<strong>in</strong>g<br />

> Ga<strong>in</strong>: optimisation of light<strong>in</strong>g periods<br />

> Measurement of light<strong>in</strong>g, automation, compliance with standards, technologies<br />

HVAC, hot water, overheated water, steam<br />

> Ga<strong>in</strong>: optimisation of fluid flow rates and circulation, efficiency<br />

> Measurement of fluid flow rates, gas flow rates and combusion, analysis of uses<br />

and operat<strong>in</strong>g costs<br />

> Study of premise occupants’ comfort, sectorisation<br />

Benefits<br />

@ Reveal opportunities to cut<br />

<strong>energy</strong> costs<br />

@ Manage and operate your<br />

<strong>in</strong>stallation:<br />

- Predict and prevent downtime<br />

- Optimise capacity and utilisation<br />

- Decrease capital expenditure<br />

- Maximise uptime and sav<strong>in</strong>gs<br />

through efficient plann<strong>in</strong>g and<br />

analysis<br />

Cyprus + 357 24 812 649 • customercare.cy@schneider-electric.com<br />

Iraq + 962 6 516 6260 • customercare.iq@schneider-electric.com<br />

Jordan + 962 6 516 6465 • customercare.jo@schneider-electric.com<br />

Lebanon + 961 1 321 645 • customercare.lb@schneider-electric.com<br />

Syria + 963 11 6124799 • customercare.sy@schneider-electric.com


Technical education<br />

Educational Solutions<br />

Catalogue 2011


Educational Solutions<br />

The OFMOD concept<br />

Modular offer: a <strong>new</strong> concept for teach<strong>in</strong>g automation<br />

systems and electrical distribution<br />

This <strong>new</strong> offer conta<strong>in</strong>s educational modules allow<strong>in</strong>g you to create any k<strong>in</strong>d<br />

of configuration. Chang<strong>in</strong>g from a simple configuration to one that is more<br />

developed is done very flexibly by add<strong>in</strong>g additional modules.<br />

The diversity of modules allows you to mix different types of components<br />

with<strong>in</strong> <strong>the</strong> same automation system architecture:<br />

@ electromechanical motor starters<br />

@ electronic motor starters<br />

@ programmable logic controllers l<strong>in</strong>ked to human-mach<strong>in</strong>e <strong>in</strong>terface term<strong>in</strong>als<br />

@ control-system architectures etc.<br />

@ tertiary electrical <strong>in</strong>stallation<br />

@ <strong>in</strong>stallation with KNX bus<br />

@ mach<strong>in</strong>e safety<br />

@ etc.<br />

Modules geared towards construction allow you to progress to <strong>in</strong>stallations<br />

implement<strong>in</strong>g <strong>energy</strong> efficiency.<br />

The simple operational parts allow you to illustrate <strong>the</strong> applications be<strong>in</strong>g<br />

developed.<br />

3


4<br />

<strong>Electric</strong>al Energy<br />

Distribution<br />

<strong>Electric</strong>al<br />

Installation<br />

5<br />

> LV switchboard for professional school teach<strong>in</strong>g<br />

6 <strong>new</strong> > Fire safety system<br />

Energy Control 7 > Motor starter bench<br />

Energy Efficiency 8 > Heat<strong>in</strong>g control bench<br />

Data Acquisition<br />

and Process<strong>in</strong>g<br />

9<br />

10<br />

11 <strong>new</strong> > Lift<br />

12<br />

13<br />

14<br />

> Reactive <strong>energy</strong> compensation<br />

> Harmotris:<br />

3-phase network harmonic <strong>in</strong>terference bench<br />

> Hanged cage surface treatment equipment<br />

> Automatic door<br />

> Comsi case


<strong>Electric</strong>al Energy Distribution<br />

LV switchboard for<br />

professional school teach<strong>in</strong>g<br />

Teach<strong>in</strong>g Objectives<br />

@ To study <strong>the</strong> hardware of a ma<strong>in</strong><br />

switchboard<br />

@ To control distribution<br />

@ To manage <strong>energy</strong><br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

400 V 3-Ph + ground<br />

@ Size (H x W x D) - weight:<br />

2310 x 1000 x 530 mm - 214 kg<br />

Ma<strong>in</strong> <strong>in</strong>dustry<br />

@ Electrotechnical professional school<br />

This cab<strong>in</strong>et conta<strong>in</strong>s:<br />

@ a ma<strong>in</strong> power supply<br />

@ a residual current device at <strong>the</strong> head and a<br />

@ switch-disconnector with visible break<strong>in</strong>g<br />

@ a busbar<br />

@ a measurement unit equipped with a<br />

configurable alarm device<br />

@ an emergency stop device on <strong>the</strong> cab<strong>in</strong>et and<br />

@ <strong>the</strong> possibility of remote <strong>in</strong>stallation of at least<br />

one o<strong>the</strong>r emergency stop po<strong>in</strong>t<br />

@ feeder control us<strong>in</strong>g ON/OFF pushbutton<br />

+ <strong>in</strong>dication<br />

@ connection of power supplies and feeders<br />

at <strong>the</strong> back of <strong>the</strong> cab<strong>in</strong>et<br />

@ cab<strong>in</strong>et access from <strong>the</strong> front and back<br />

(for exercises and accreditation)<br />

@ a light beacon at <strong>the</strong> top to <strong>in</strong>dicate power on<br />

@ safety devices conform to current standards.<br />

Un-wired rear face<br />

Package description<br />

This cab<strong>in</strong>et is used to:<br />

@ perform cabl<strong>in</strong>g and accreditation tasks with <strong>in</strong>tervention on busbars<br />

@ take measurements (<strong>in</strong>tensity, simple and composite voltages, active,<br />

reactive and apparent power, power factor and phase order)<br />

@ take measurements us<strong>in</strong>g an oscilloscope and hook-on ammeter<br />

@ distribute electrical <strong>energy</strong> on 6 separate feeders.<br />

It can be supplied <strong>in</strong> a mounted, non-cabled version delivered with an Accessories<br />

kit to carry out cabl<strong>in</strong>g operations.<br />

Proposed as an option:<br />

@ accessories batch (wires, tags, cable ends and sheaths)<br />

@ tool<strong>in</strong>g batch (screwdriver, clamps, allen keys).<br />

In <strong>the</strong> workshop, <strong>the</strong> cab<strong>in</strong>et will be used to supply:<br />

@ systems separately<br />

@ <strong>the</strong> spatial production area (3D cells)<br />

@ <strong>the</strong> panel-builder’s workstations<br />

@ a light<strong>in</strong>g area<br />

@ <strong>the</strong> cab<strong>in</strong>et cabl<strong>in</strong>g stations<br />

@ <strong>the</strong> “study” zone with <strong>the</strong> microcomputers.<br />

To order<br />

MD1AA720: cabled LV switchboard<br />

MD1AA720NC: non-cabled LV switchboard<br />

MD1AA728: accessories kit<br />

MD1AA728P4: accessories kit (Q = 4)<br />

MD1AA729: tool kit<br />

5


Educational Solutions<br />

<strong>Electric</strong>al Installation<br />

Fire safety system<br />

Teach<strong>in</strong>g objectives<br />

@ To study how a fire safety<br />

system works<br />

@ To f<strong>in</strong>d out about and <strong>in</strong>stall<br />

<strong>the</strong> components of a fire safety system<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

230 V AC + E<br />

@ Size (H x W x D) - weight:<br />

1800 x 1000 x 600 mm – 120 kg approx.<br />

Ma<strong>in</strong> <strong>in</strong>dustries<br />

@ <strong>Electric</strong>al eng<strong>in</strong>eer<strong>in</strong>g<br />

@ Energy eng<strong>in</strong>eer<strong>in</strong>g<br />

6www.eastmed.schneider-electric.com<br />

Package description<br />

The fire safety system control bench is a chassis mounted on castors,<br />

it <strong>in</strong>cludes:<br />

@ an enclosed 127-po<strong>in</strong>t addressable control centre with alarm <strong>management</strong> unit<br />

@ a central unit for fire safety sett<strong>in</strong>gs<br />

@ a splitter box control panel with LCD screen<br />

@ an <strong>in</strong>teractive, addressable, optical smoke detector<br />

@ an <strong>in</strong>teractive, addressable <strong>the</strong>rmo-velocimetric heat sensor<br />

@ two addressable, manual releases<br />

@ an action <strong>in</strong>dicator<br />

@ a sound diffuser<br />

@ an electromagnetic release<br />

@ a smoke detector test gas cannister<br />

@ a kit compris<strong>in</strong>g holder, pushbuttons and safety devices needed for it to<br />

operate properly.<br />

The products are <strong>in</strong>stalled on a workspace equipped with safety sockets and are<br />

ready to use. Operations on this bench are performed <strong>in</strong> total safety due to <strong>the</strong><br />

exclusive use of safety cables for establish<strong>in</strong>g connections.<br />

This bench is used to:<br />

@ signal data from <strong>the</strong> automatic sensors and manual releases<br />

@ locate <strong>the</strong> start of <strong>the</strong> fire<br />

@ trigger sound diffusers<br />

@ halt <strong>the</strong> broadcast<strong>in</strong>g process <strong>in</strong> <strong>the</strong> case of unjustified trigger<strong>in</strong>g<br />

@ operate <strong>in</strong> restricted standby mode.<br />

To order<br />

<strong>new</strong><br />

MDG99130A: Fire safety system


Energy Control<br />

Motor starter bench<br />

Teach<strong>in</strong>g objectives<br />

@ To study typical diagrams of<br />

electromechanical and electronic<br />

motor starters<br />

@ To comb<strong>in</strong>e power control components<br />

@ To measure <strong>the</strong> circuit voltages and currents<br />

@ To calculate torque, power and <strong>energy</strong><br />

@ To study protection<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

400 V triple phase + N + E / 2 kVA<br />

@ Size (H x W x D) - weight:<br />

1950 x 700 x 700 mm - 190 kg<br />

Ma<strong>in</strong> <strong>in</strong>dustry<br />

@ <strong>Electric</strong>al eng<strong>in</strong>eer<strong>in</strong>g<br />

O<strong>the</strong>r <strong>in</strong>dustries<br />

@ Mechanical eng<strong>in</strong>eer<strong>in</strong>g<br />

@ Industrial technology<br />

Manual panel Automatic panel<br />

Package description<br />

This bench allows motor starters to be studied chronologically:<br />

@ implementation of <strong>the</strong> most common diagrams:<br />

_ DOL start<strong>in</strong>g<br />

_ star-delta start<strong>in</strong>g<br />

_ revers<strong>in</strong>g start<strong>in</strong>g<br />

_ start<strong>in</strong>g with electronic starter.<br />

@ comb<strong>in</strong><strong>in</strong>g power control components:<br />

_ switch<br />

_ isolator<br />

_ contactor<br />

_ <strong>the</strong>rmal overload relay<br />

_ compact Tesys U starter.<br />

@ measurement of circuit voltages and currents<br />

@ calculation of torque, power and <strong>energy</strong><br />

The motor starter bench <strong>in</strong>cludes:<br />

@ two autonomous and <strong>in</strong>dependent work panels with <strong>in</strong>dustrial components<br />

connected to safety sockets<br />

@ one panel for analys<strong>in</strong>g and connect<strong>in</strong>g <strong>the</strong> power circuit<br />

@ one panel for analys<strong>in</strong>g and connect<strong>in</strong>g <strong>the</strong> power and control circuit<br />

@ a pl<strong>in</strong>th with 2 units (230 V AC - 185 W motor / 190 V DC - 280 W generator)<br />

@ two adjustable load rheostats<br />

@ a voltmeter to measure <strong>the</strong> voltage at each po<strong>in</strong>t of <strong>the</strong> circuit<br />

@ ammeters for each motor phase and for <strong>the</strong> load<br />

@ wir<strong>in</strong>g accessories compliant with safety standards<br />

Motor starters are built us<strong>in</strong>g <strong>the</strong> follow<strong>in</strong>g types of component:<br />

@ basic function components, such as <strong>the</strong> Vario switch, LS1D isolator, LC1 / LC2<br />

contactors, class 10 LRD <strong>the</strong>rmal overload relay<br />

@ components with multiple or <strong>in</strong>tegrated functions, such as <strong>the</strong> GV2 circuit<br />

breaker, Integral 18, TeSys U motor starter or ATS01 starter.<br />

To order<br />

MD1AA540: motor starter bench<br />

7


Educational Solutions<br />

Energy Efficiency<br />

Heat<strong>in</strong>g control bench<br />

Teach<strong>in</strong>g objectives<br />

@ To use and program <strong>the</strong> control<br />

functions of a Premium PLC<br />

@ To understand and configure <strong>the</strong> operation<br />

of a control loop<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

230 V T / 2000 VA<br />

@ Size (H x W x D) - weight:<br />

1800 x 1000 x 1000 mm - 120 kg<br />

Ma<strong>in</strong> <strong>in</strong>dustries<br />

@ <strong>Electric</strong>al eng<strong>in</strong>eer<strong>in</strong>g<br />

@ Control and monitor<strong>in</strong>g<br />

8www.eastmed.schneider-electric.com<br />

Package description<br />

The heat<strong>in</strong>g control bench is used to study a central heat<strong>in</strong>g system with<br />

control loops.<br />

The operational part represents a reduced central heat<strong>in</strong>g system compris<strong>in</strong>g:<br />

@ a 3-way motorised valve<br />

@ a variable speed pump (circulator)<br />

@ a heat exchanger (fan-cooled heats<strong>in</strong>k).<br />

The control part <strong>in</strong>cludes a Premium PLC which provides all <strong>the</strong> control<br />

operations, an Altivar variable speed drive and all <strong>the</strong> associated electrical<br />

protection elements.<br />

A graphic operator <strong>in</strong>terface term<strong>in</strong>al is used to control and monitor <strong>the</strong> system.<br />

An E<strong>the</strong>rnet connection allows you to connect a computer and control<br />

supervision remotely.<br />

The system is configured to use one of <strong>the</strong> three follow<strong>in</strong>g control loops:<br />

@ PID loop: central heat<strong>in</strong>g with <strong>in</strong>ternal temperature sensor<br />

(act<strong>in</strong>g on <strong>the</strong> water flow)<br />

@ PID loop + servo: central heat<strong>in</strong>g with <strong>in</strong>ternal temperature sensor<br />

(act<strong>in</strong>g on <strong>the</strong> three-way valve)<br />

@ PID loop: central heat<strong>in</strong>g with external temperature sensor and water<br />

ratio (act<strong>in</strong>g on <strong>the</strong> three-way valve).<br />

The system can be disturbed us<strong>in</strong>g a set of three motorised fans of variable<br />

speed.<br />

To order<br />

Close-up view of 3-way valve<br />

MD1AE895PR: heat<strong>in</strong>g control bench


Energy Efficiency<br />

Reactive <strong>energy</strong><br />

compensation<br />

Teach<strong>in</strong>g objectives<br />

@ To modify, identify and rectify <strong>the</strong><br />

power factor <strong>in</strong> an <strong>in</strong>stallation<br />

@ To highlight and study <strong>the</strong> <strong>in</strong>fluence of:<br />

_ harmonics phenomena on capacitors<br />

_ <strong>in</strong>rush currents when capacitors are<br />

switched on<br />

@ To implement suitable solutions<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

230 V s<strong>in</strong>gle-phase + ground /


Educational Solutions<br />

Energy Efficiency<br />

Harmotris: 3-phase network<br />

harmonic <strong>in</strong>terference bench<br />

Teach<strong>in</strong>g objectives<br />

@ To study problems of electrical<br />

<strong>in</strong>terference <strong>in</strong> a 3-phase <strong>in</strong>stallation<br />

@ To implement <strong>the</strong> relevant solutions<br />

@ To analyse third harmonic and neutral<br />

heat<strong>in</strong>g phenomena<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

400 V 3-phase + N + ground /


Data Acquisition and Process<strong>in</strong>g<br />

Lift<br />

Teach<strong>in</strong>g objectives<br />

@ To understand how to program and<br />

implement a PLC<br />

@ To study <strong>the</strong> timer, counter and storage<br />

functions of a Grafcet<br />

@ To manage priorities and allocate tasks<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

230 V s<strong>in</strong>gle phase + ground / < 150 VA<br />

@ Size (H x W x D) - weight:<br />

_ control unit:<br />

300 x 290 x 210 mm - 5 kg<br />

_ operational unit:<br />

1015 x 615 x 635 mm - 24 kg<br />

Ma<strong>in</strong> <strong>in</strong>dustry<br />

@ Industrial technology<br />

O<strong>the</strong>r <strong>in</strong>dustries<br />

@ <strong>Electric</strong>al eng<strong>in</strong>eer<strong>in</strong>g<br />

@ Mechanical eng<strong>in</strong>eer<strong>in</strong>g<br />

<strong>new</strong><br />

Package description<br />

Operat<strong>in</strong>g unit<br />

@ a 5-floor lift with:<br />

_ land<strong>in</strong>g door contact<br />

_ car floor call control<br />

_ land<strong>in</strong>g call buttons<br />

_ car arrival sensors.<br />

Control unit<br />

@ a PLC mounted and wired to a support:<br />

_ TSX Micro or Twido or M340<br />

_ two ribbon cables for quick connection<br />

to <strong>the</strong> operat<strong>in</strong>g unit.<br />

To control<br />

MD1AE254: lift operational part<br />

MD1AE257: TSX Micro complete lift<br />

MD1AE257MR: M340 complete lift<br />

MD1AE257TW: Twido complete lift<br />

For <strong>the</strong> control part only, please consult us<br />

11


Educational Solutions<br />

Data Acquisition and Process<strong>in</strong>g<br />

Hanged cage surface<br />

treatment equipment<br />

Teach<strong>in</strong>g objectives<br />

@ To approach sequencial programm<strong>in</strong>g<br />

@ To manage <strong>the</strong> stop/start modes of an<br />

automated system (DGOSM)<br />

@ To study <strong>the</strong> Grafcet and its timer, counter<br />

and storage functions<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

230 V s<strong>in</strong>gle phase + ground / < 100 VA<br />

@ Size (H x W x D) - weight:<br />

_ micro control unit:<br />

210 x 380 x 350 mm - 5 kg<br />

_ Twido control unit:<br />

170 x 290 x 310 mm - 2 kg<br />

_ operat<strong>in</strong>g unit:<br />

400 x 700 x 350 mm - 18 kg<br />

Ma<strong>in</strong> <strong>in</strong>dustries<br />

@ <strong>Electric</strong>al eng<strong>in</strong>eer<strong>in</strong>g<br />

@ Mechanical eng<strong>in</strong>eer<strong>in</strong>g<br />

O<strong>the</strong>r <strong>in</strong>dustry<br />

@ Industrial technology<br />

12www.eastmed.schneider-electric.com<br />

Package description<br />

The operat<strong>in</strong>g unit modell<strong>in</strong>g a surface treatment system <strong>in</strong>cludes:<br />

@ a double-motion hanged cage<br />

@ a load<strong>in</strong>g/unload<strong>in</strong>g station.<br />

The control unit <strong>in</strong>cludes:<br />

@ a TSX Micro or Twido or M340 PLC<br />

@ a base with connection layers.<br />

To order<br />

MD1AE224: surface treatment operational part<br />

MD1AE227: TSX Micro complete lift<br />

MD1AE227MR: M340 complete lift<br />

MD1AE227TW: Twido complete lift<br />

For <strong>the</strong> control part only, please consult us


Data Acquisition and Process<strong>in</strong>g<br />

Automatic door<br />

Teach<strong>in</strong>g objectives<br />

@ To learn and understand automated<br />

system structures<br />

@ To analyse operation by wired or programmed<br />

logic<br />

@ To study and comply with safety rules and<br />

user protection devices<br />

@ To program door operation (list, Ladder,<br />

Grafcet)<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

230 V s<strong>in</strong>gle phase + ground / < 130 VA<br />

@ Size (H x W x D) - weight:<br />

_ control unit:<br />

700 x 300 x 700 mm - 37 kg<br />

_ operational unit:<br />

540 x 600 x 600 mm - 22 kg<br />

Ma<strong>in</strong> <strong>in</strong>dustry<br />

@ <strong>Electric</strong>al eng<strong>in</strong>eer<strong>in</strong>g<br />

O<strong>the</strong>r <strong>in</strong>dustries<br />

@ Mechanical eng<strong>in</strong>eer<strong>in</strong>g<br />

@ Industrial technology<br />

Package description<br />

Operat<strong>in</strong>g unit<br />

The “Safe Automatic Door” teach<strong>in</strong>g module consists of a sw<strong>in</strong>g<strong>in</strong>g door implement<strong>in</strong>g<br />

all <strong>the</strong> operation safety devices required by relevant standards:<br />

@ XUL photoelectric barrier cells with double output contact<br />

@ mobile panel obstruction detection by XUD optic fibres and photoelectric cells<br />

@ mechanical open/close end-of-travel switches<br />

@ door motion <strong>in</strong>dicator lamps<br />

@ safe access zone light<strong>in</strong>g <strong>in</strong>dicators.<br />

Mechanical motion is controlled by an AC motor with a speed reducer and<br />

an adjustable torque limiter.<br />

The mobile panel is driven by p<strong>in</strong>ion and cha<strong>in</strong> gear with ball bear<strong>in</strong>g rail guides.<br />

Control unit<br />

An <strong>in</strong>dustrial electrical box <strong>in</strong>cludes:<br />

@ <strong>the</strong> standard protection devices: fuse isolator, <strong>the</strong>rmal magnetic circuit<br />

breaker and <strong>the</strong>rmal relay<br />

@ <strong>the</strong> components needed to achieve <strong>the</strong> two operat<strong>in</strong>g modes<br />

@ depend<strong>in</strong>g on <strong>the</strong> version, <strong>the</strong> PLC is a TSX Micro (16I/12O), a Twido<br />

(16I/12O) or a Zelio (12I/8O) module<br />

@ <strong>in</strong> manual mode, door motion and safety devices are controlled by limit<br />

switches<br />

@ <strong>in</strong> automatic mode, <strong>the</strong> motion and safety devices, keyboard access and<br />

signals are controlled by a PLC.<br />

To order<br />

MD1AE774: automatic door operational part<br />

MD1AE176: TSX Micro control part<br />

MD1AE177: TSX Micro complete assembly<br />

MD1AE173TW: Twido control part<br />

MD1AE175TW: Twido complete assembly<br />

MD1AE173ZL: Zelio control part<br />

MD1AE175ZL: Zelio complete assembly<br />

13


Educational Solutions<br />

Data Acquisition and Process<strong>in</strong>g<br />

Comsi case<br />

Teach<strong>in</strong>g objectives<br />

@ To study E<strong>the</strong>rnet and ASi<br />

communication tools<br />

@ To program a PLC <strong>in</strong> PL7<br />

<strong>Electric</strong>al and<br />

mechanical data<br />

@ Power supply:<br />

230 V s<strong>in</strong>gle-phase /


Automation Services<br />

Automation Systems<br />

Improve <strong>the</strong> reliability and availability<br />

of your equipment<br />

Spare parts<br />

Be able to get operations started aga<strong>in</strong> as<br />

quickly as possible after a failure by hav<strong>in</strong>g<br />

a spare part or equivalent solution available<br />

on site.<br />

Standard<br />

exchange<br />

and repairs<br />

www.eastmed.schneider-electric.com<br />

Our offer :<br />

@ <strong>the</strong> supply from our stock of tested and certified equipment and<br />

spare parts compatible with your <strong>in</strong>stallations,<br />

@ <strong>the</strong> use of genu<strong>in</strong>e parts with orig<strong>in</strong>al manufacturer quality,<br />

@ <strong>the</strong> recycl<strong>in</strong>g of your old configurations modernised with spare parts<br />

updated and certified by <strong>the</strong> manufacturer,<br />

@ <strong>the</strong> supply of spare parts beyond <strong>the</strong> commercialisation period.<br />

Benefits for you :<br />

@ limit down time thanks to our service stock,<br />

@ have access to services after <strong>the</strong> end of commercialisation of products,<br />

@ have access to our stocks at any time, on a contractual basis<br />

<strong>in</strong> case of emergencies.<br />

@ Benefit from service on products no longer commercialised.<br />

@ Have a manufacturer’s technician come to your site to repair <strong>the</strong><br />

faulty equipment.<br />

@ F<strong>in</strong>d a good compromise between price and servic<strong>in</strong>g time.<br />

Our offer :<br />

@ repair of <strong>the</strong> faulty equipment on our premises or on your site,<br />

@ standard exchange of certa<strong>in</strong> parts.<br />

Benefits for you :<br />

@ <strong>the</strong> repaired parts are checked and overhauled, and wear<br />

components are replaced,<br />

@ <strong>the</strong> complete part is guaranteed, not only <strong>the</strong> faulty component,<br />

@ with standard exchange of some parts, you get good prices and a<br />

fast response.


Automation Services<br />

Automation Systems<br />

On-site<br />

services<br />

Retrofit<br />

If you would like a turnkey solution for<br />

<strong>the</strong> replacement of your automation<br />

products, we have created a complete<br />

modernisation offer to help you to make<br />

your project a success :<br />

@ Full handl<strong>in</strong>g of your migration (application<br />

software and hardware)<br />

@ Project <strong>management</strong> with your partners or<br />

direct<br />

@ Commitment to results regard<strong>in</strong>g down time<br />

@ Multi-site deployment<br />

www.eastmed.schneider-electric.com<br />

Benefit on site from <strong>the</strong> expertise<br />

of our technicians :<br />

@ <strong>in</strong> case of a fault, get operations started aga<strong>in</strong> as quickly as possible<br />

to limit losses and risks,<br />

@ be sure that <strong>the</strong> equipment is started up as recommended by <strong>the</strong><br />

manufacturer,<br />

@ obta<strong>in</strong> validation from <strong>the</strong> manufacturer that a variable speed drive,<br />

PLC, network, human-mach<strong>in</strong>e <strong>in</strong>terface, architecture or supervision<br />

system has been <strong>in</strong>stalled,<br />

Our offer :<br />

On-site services by our technicians and experts, us<strong>in</strong>g manufacturerspecific<br />

tools for an <strong>in</strong>-depth diagnosis of your equipment.<br />

Benefits for you :<br />

@ limit down time by rely<strong>in</strong>g on our knowledge of our products and your<br />

bus<strong>in</strong>ess,<br />

@ be certa<strong>in</strong> that <strong>the</strong> <strong>in</strong>spected or commissioned equipment will meet<br />

requirements to ensure optimal production quality.<br />

Your situation :<br />

@ you have equipment that can still give you many more years of service<br />

mechanically speak<strong>in</strong>g, but you are hav<strong>in</strong>g more and more difficulty<br />

with <strong>the</strong> ma<strong>in</strong>tenance of <strong>the</strong> electrical part, which reduces reliability,<br />

@ <strong>the</strong> ma<strong>in</strong>tenance costs for <strong>the</strong> electrical part of this age<strong>in</strong>g equipment<br />

are go<strong>in</strong>g up substantially,<br />

@ you want to <strong>in</strong>crease <strong>the</strong> performance of your equipment by us<strong>in</strong>g<br />

more recent automation products <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> latest technologies,<br />

@ you want to upgrade your equipment to comply with <strong>new</strong> standards.<br />

Our offer :<br />

@ technical retrofit solutions, allow<strong>in</strong>g you to benefit from our expertise<br />

and considerably reduce <strong>the</strong> risks and down time l<strong>in</strong>ked to cabl<strong>in</strong>g and<br />

mechanical adaptation operations,<br />

@ retrofit with little or no revision of <strong>the</strong> application software or product<br />

sett<strong>in</strong>gs,<br />

@ <strong>in</strong> case application software modifications are necessary, our<br />

modernisation offer has been designed to meet your specific needs.<br />

Benefits for you :<br />

@ extend your equipment service life without <strong>in</strong>vest<strong>in</strong>g <strong>in</strong> costly <strong>new</strong><br />

mach<strong>in</strong>es,<br />

@ reduce down time for retrofit thanks to our technical solutions.


Critical Power & Cool<strong>in</strong>g Services<br />

APC InfrastruXure TM<br />

Services to keep your mission-critical applications<br />

operat<strong>in</strong>g at optimal performance<br />

www.eastmed.schneider-electric.com<br />

Ma<strong>in</strong>ta<strong>in</strong> & Optimize<br />

Your mission-critical applications at maximum efficiency<br />

When it comes to ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g and operat<strong>in</strong>g your mission-critical applications, your primary<br />

concern is keep<strong>in</strong>g your equipment runn<strong>in</strong>g at maximum efficiency and optimal performance.<br />

Proper care and regular ma<strong>in</strong>tenance will help you avoid unnecessary downtime, sav<strong>in</strong>g you<br />

headaches, time and money.<br />

<strong>Schneider</strong> <strong>Electric</strong> Critical Power & Cool<strong>in</strong>g has <strong>the</strong> services to support you <strong>in</strong> <strong>the</strong>se efforts<br />

and protect your <strong>in</strong>vestment. Our services portfolio is designed to ensure your applications<br />

receive <strong>the</strong> care <strong>the</strong>y need to operate efficiently. Preventive Ma<strong>in</strong>tenance, On-Site Service,<br />

Remote Monitor<strong>in</strong>g, Extended Warranty, and Tra<strong>in</strong><strong>in</strong>g services may be ordered <strong>in</strong>dividually<br />

(see product description below), or as a package at discounted prices (see package<br />

descriptions at right).<br />

Services to help you MAINTAIN<br />

and OPTIMIZE your mission-critical applications<br />

On-Site Service<br />

Get <strong>the</strong> help you need on location to br<strong>in</strong>g your bus<strong>in</strong>ess back<br />

up and runn<strong>in</strong>g <strong>in</strong> a time frame compatible with your bus<strong>in</strong>ess<br />

requirements.<br />

Our Field Service Eng<strong>in</strong>eers arrive on-site to isolate and correct <strong>the</strong> problem <strong>in</strong> as little time as<br />

possible, m<strong>in</strong>imiz<strong>in</strong>g downtime.<br />

Service Pack Extended Warranty<br />

Provides an extension of coverage beyond <strong>the</strong> factory warranty<br />

In <strong>the</strong> unlikely event of a failure of your s<strong>in</strong>gle-phase UPS, your product will be repaired or<br />

replaced quickly, m<strong>in</strong>imiz<strong>in</strong>g downtime.<br />

Our warranty guarantees free delivery of parts or unit to ensure you get what you need as<br />

soon as you need it.<br />

Options available:<br />

• 1 Year<br />

• 3 Year


Critical Power & Cool<strong>in</strong>g Services<br />

APC InfrastruXure TM<br />

<strong>Schneider</strong> <strong>Electric</strong> East Mediterranean s.a.l.<br />

Tabaris, Charles Malek Avenue, Tabaris Centre 1063, 10 th Floor<br />

P.O. Box : 166223 - Beirut, Lebanon<br />

Tel. +961 1 204 502<br />

Fax +961 1 204 458<br />

www.eastmed.schneider-electric.com<br />

Tra<strong>in</strong><strong>in</strong>g<br />

Award-w<strong>in</strong>n<strong>in</strong>g tra<strong>in</strong>ers give you <strong>the</strong> skills you need to <strong>in</strong>crease<br />

<strong>the</strong> availability and productivity of your equipment while<br />

decreas<strong>in</strong>g support requests.<br />

Our InfraStruXure ® Orientation and Tra<strong>in</strong><strong>in</strong>g Service <strong>in</strong>creases your understand<strong>in</strong>g and ability<br />

to <strong>in</strong>terface with your ISX solution. Tra<strong>in</strong><strong>in</strong>g is also available on <strong>in</strong>dustry technologies and<br />

trends.<br />

Preventive Ma<strong>in</strong>tenance Services<br />

An exam<strong>in</strong>ation of your system to ensure optimal performance<br />

and prevent problems before <strong>the</strong>y occur<br />

Power and air systems conta<strong>in</strong> components and parts that will wear out over time. Depend<strong>in</strong>g<br />

on your product and its environment, we’ll help you choose from <strong>the</strong> follow<strong>in</strong>g options:<br />

• Monthly Preventive Ma<strong>in</strong>tenance<br />

• Quarterly Preventive Ma<strong>in</strong>tenance<br />

• Semi-annual Preventive Ma<strong>in</strong>tenance<br />

• Annual Preventive Ma<strong>in</strong>tenance<br />

All of <strong>the</strong>se ma<strong>in</strong>tenance services are available with an option to schedule service outside of<br />

normal bus<strong>in</strong>ess hours<br />

Battery Replacement<br />

Provides you with <strong>new</strong> batteries when needed, guarantee<strong>in</strong>g<br />

your system is backed up appropriately<br />

Battery service and replacement is a vital component of any UPS ma<strong>in</strong>tenance program s<strong>in</strong>ce<br />

even one failed battery can compromise an entire system. Whe<strong>the</strong>r it is necessary to replace<br />

one or all of your batteries, we will provide you with <strong>the</strong> <strong>new</strong> batteries required for reliable<br />

back-up.<br />

Decommission<strong>in</strong>g/Removal/Disposal<br />

End-of-life treatment of your equipment<br />

Safe and efficient dismantl<strong>in</strong>g and removal of your old equipment, <strong>in</strong>clud<strong>in</strong>g proper disposal,<br />

comply<strong>in</strong>g with <strong>in</strong>ternational regulations regard<strong>in</strong>g handl<strong>in</strong>g end-of-life electrical equipment,<br />

and recycl<strong>in</strong>g of waste<br />

Cyprus + 357 24 812 649 • customercare.cy@schneider-electric.com<br />

Iraq + 962 6 516 6260 • customercare.iq@schneider-electric.com<br />

Jordan + 962 6 516 6465 • customercare.jo@schneider-electric.com<br />

Lebanon + 961 1 321 645 • customercare.lb@schneider-electric.com<br />

Syria + 963 11 6124799 • customercare.sy@schneider-electric.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!