29.01.2015 Views

Investor Presentation - Welspun

Investor Presentation - Welspun

Investor Presentation - Welspun

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Welspun</strong> Group | <strong>Welspun</strong> Corp Ltd<br />

Global Manufacturing Capacities<br />

2,500<br />

2,000<br />

1,500<br />

1,000<br />

Manufacturing Capacities in ‘000 MTPA<br />

500<br />

-<br />

700<br />

1,350<br />

175<br />

200<br />

LSAW HSAW ERW Total<br />

Pipes<br />

Anjar, Dahej and Mandya<br />

175<br />

2,250<br />

1,500<br />

Plates<br />

New<br />

Capacities<br />

Current<br />

Capacities<br />

Little Rock, Arkansas, USA<br />

Current Capacities<br />

Anjar,<br />

India<br />

Dahej,<br />

India<br />

Mandya,<br />

India<br />

Dammam, Saudi Arabia<br />

Dammam,<br />

Little Rock,<br />

US<br />

Plate-cum-Coil Mill<br />

In ‘000 MTPA<br />

Total<br />

Capacity<br />

LSAW 350 350 700<br />

HSAW 500 50 150 300 350 1,350<br />

ERW 200 175* 375*<br />

Total Pipe<br />

Capacity<br />

Plate & Coil 1,500<br />

Coating<br />

(mn mtr sq)<br />

1,050 400 150 300 475* 2,425<br />

7.75 6.5 4.5 7.0 25.75<br />

* New Capacity to be commissioned by Q4 FY13<br />

• Premier integrated set-up for manufacturing<br />

welded pipes with state-of-the-art-technology<br />

geared to meet the requirements of the global<br />

industry<br />

• The Longitudinal Pipes division (LSAW)<br />

has a capacity of 350,000 MTPA at<br />

Dahej<br />

• The New Longitudinal Pipe Plant<br />

(LSAW) plant at Anjar has a capacity of<br />

350,000 MTPA<br />

• The Spiral Pipes division (HSAW) at<br />

Dahej and Anjar together have a<br />

capacity of 550,000 MTPA<br />

• The Spiral Pipes division (HSAW) at<br />

Mandya (Karnataka) has a capacity of<br />

150,000 MTPA<br />

• The ERW Pipes division at Anjar has a<br />

capacity of 200,000 MTPA<br />

• Manufacturing facility on a 740-acre site<br />

adjacent to the Little Rock Port Authority<br />

commissioned in February 2009<br />

• This API certified facility currently employs<br />

443 people and is capable of producing<br />

350,000 MTPA of HSAW pipes annually<br />

for the use of the oil and gas industry<br />

• It also has Coating and Double Jointing<br />

capabilities<br />

• The construction of the new ERW mill with<br />

175,000 MTPA capacity is underway and<br />

should be commissioned Q4 FY13 as per<br />

the schedule.<br />

• Manufacturing facility of 300,000<br />

MTPA of HSAW pipes with<br />

Coating facility<br />

• Recently commissioned coating<br />

facility of 1.0 mn sq mtrs<br />

• This backward integration at<br />

Anjar, India has annual capacity<br />

to produce 1,500,000 MTPA of<br />

Plate and Coil with plates (up to<br />

12.5 mtrs in length, 140 mm<br />

thickness and 450 mm width) and<br />

Coil (up to 2800 mm width and 25<br />

mm thickness) with strength of<br />

120,000 PSI

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!