STATEMENT SHOWING BALANCE FUND REQUIREMENT AND TENTATIVE ALLOCATION UNDER CRF DURING 2007-08<br />

(Rupees in lakhs)<br />

Page - 4<br />

Sl. No.<br />

Name <strong>of</strong> the Scheme<br />

Sanctioned<br />

Cost<br />

Technical<br />

Sanction Cost<br />

Achivement up<br />

to March 2007<br />

Balance<br />

Proposed<br />

allocation<br />

2007-08<br />

Remarks<br />

1 2 3 4 5 6 7 8<br />

32 Construction <strong>of</strong> approach road to V.K.V. at Dobi in Lower<br />

Subansiri District, Ziro (length = 2025 mtr) in the State <strong>of</strong><br />

<strong>Arunachal</strong> Pradesh.<br />

33 Improvement and up-gradation <strong>of</strong> Road network Lumla<br />

Township road (15.095 Km) in the State <strong>of</strong> <strong>Arunachal</strong><br />

Pradesh.<br />

34 Construction <strong>of</strong> Road from Pai to Pinegroove (20.00 Km)<br />

Phase-I (0.00 - 5.00 Km) in the State <strong>of</strong> <strong>Arunachal</strong><br />

Pradesh.<br />

35 Improvement <strong>of</strong> Naharlagun Township Road Phase-II in<br />

the State <strong>of</strong> <strong>Arunachal</strong> Pradesh.<br />

65.46 -- 0.00 65.46 35.00 New sanction<br />

600.00 -- 0.00 600.00 60.00 New sanction<br />

500.00 -- 0.00 500.00 50.00 New sanction<br />

500.00 -- 0.00 500.00 50.00 New sanction<br />

36 C/o Rima Motongsa road (18.00 km) Ph-I 0.00 to 7.00<br />

km.<br />

500.00 -- 0.00 500.00 60.00 New sanction<br />

Total: 12216.94 9698.10 7221.58 5375.10 1622.00<br />