government of arunachal pradesh public works ... - Arunachal PWD
government of arunachal pradesh public works ... - Arunachal PWD
government of arunachal pradesh public works ... - Arunachal PWD
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
STATEMENT SHOWING BALANCE FUND REQUIREMENT AND TENTATIVE ALLOCATION UNDER CRF DURING 2007-08<br />
(Rupees in lakhs)<br />
Page - 4<br />
Sl. No.<br />
Name <strong>of</strong> the Scheme<br />
Sanctioned<br />
Cost<br />
Technical<br />
Sanction Cost<br />
Achivement up<br />
to March 2007<br />
Balance<br />
Proposed<br />
allocation<br />
2007-08<br />
Remarks<br />
1 2 3 4 5 6 7 8<br />
32 Construction <strong>of</strong> approach road to V.K.V. at Dobi in Lower<br />
Subansiri District, Ziro (length = 2025 mtr) in the State <strong>of</strong><br />
<strong>Arunachal</strong> Pradesh.<br />
33 Improvement and up-gradation <strong>of</strong> Road network Lumla<br />
Township road (15.095 Km) in the State <strong>of</strong> <strong>Arunachal</strong><br />
Pradesh.<br />
34 Construction <strong>of</strong> Road from Pai to Pinegroove (20.00 Km)<br />
Phase-I (0.00 - 5.00 Km) in the State <strong>of</strong> <strong>Arunachal</strong><br />
Pradesh.<br />
35 Improvement <strong>of</strong> Naharlagun Township Road Phase-II in<br />
the State <strong>of</strong> <strong>Arunachal</strong> Pradesh.<br />
65.46 -- 0.00 65.46 35.00 New sanction<br />
600.00 -- 0.00 600.00 60.00 New sanction<br />
500.00 -- 0.00 500.00 50.00 New sanction<br />
500.00 -- 0.00 500.00 50.00 New sanction<br />
36 C/o Rima Motongsa road (18.00 km) Ph-I 0.00 to 7.00<br />
km.<br />
500.00 -- 0.00 500.00 60.00 New sanction<br />
Total: 12216.94 9698.10 7221.58 5375.10 1622.00<br />
E:\crf-07-08