STATEMENT SHOWING BALANCE FUND REQUIREMENT AND TENTATIVE ALLOCATION UNDER CRF DURING 2007-08<br />

(Rupees in lakhs)<br />

Page - 1<br />

Sl. No.<br />

Name <strong>of</strong> the Scheme<br />

Sanctioned<br />

Cost<br />

Technical<br />

Sanction Cost<br />

Achivement up<br />

to March 2007<br />

Balance<br />

Proposed<br />

allocation<br />

2007-08<br />

Remarks<br />

A<br />

1 2 3 4 5 6 7 8<br />

Schemes fully funded by the Govt. <strong>of</strong> India<br />

1 Approach road to V.K.V. school at Along (6.00Km) 98.88 98.85 105.35 Nil 0.00 Completed<br />

2 Improvement <strong>of</strong> Jirdin V.K.V. road to 152.48 158.57 174.01 Nil 0.00 Completed<br />

J.N.V. School on Taso-Mobuk(7.75Km)<br />

3 Patum Rumgong Road (22.00Km) 719.00 762.30 788.93 Nil 0.00 Completed<br />

4 C/o Along - Kaying BRTF road to Donyi Polo 42.68 42.68 42.68 Nil 0.00 Completed<br />

Degree College at Kamki<br />

5 Construction <strong>of</strong> Steel bridge over River Sigen 184.78 183.76 164.76 19.00 0.00 Completed<br />

6 Extension and Resurfacing <strong>of</strong> Basar Township Road 244.80 257.00 124.69 132.31 100.00 In progress<br />

7 Improvement/construction <strong>of</strong> Puchigeko to 325.07 325.07 93.62 231.45 100.00 In progress<br />

Sikiputu via Anglomodak, Pegalomdak and Gichi<br />

8 Construction <strong>of</strong> Mebo-Dholla road(36.70 Km) 1005.50 1081.00 795.64 285.36 100.00 In progress<br />

9 Construction <strong>of</strong> Mebo-Dholla road (Ph-II) 345.18 363.35 171.40 191.95 100.00 In progress<br />

(36.70 Km)<br />

10 Improvement <strong>of</strong> Yingkiong Township road 230.00 227.49 230.00 Nil 0.00 Completed<br />

(20.00 km)<br />

11 C/o PSC girder and RCC slab composite bridge 305.88 334.05 150.71 183.34 125.00 In progress<br />