GOVERNMENT OF ARUNACHAL PRADESH<br />
PUBLIC WORKS DEPARTMENT<br />
NO.CEAP(D&P)PLG-11/CRF(NORMAL)/2006-07/340-47 29 th June 2007<br />
To<br />
The Commissioner (<strong>PWD</strong>)<br />
Government <strong>of</strong> <strong>Arunachal</strong> Pradesh<br />
Itangar<br />
Sub: Tentative allocations against CRF projects.<br />
Sir,<br />
It is necessary to convey the tentative allocations against CRF projects pending<br />
finalization <strong>of</strong> AOP 2007-08 Road and Bridge sector, to facilitate preparation <strong>of</strong> work<br />
plans by Chief Engineer (EZ), Chief Engineer (WZ), and the field <strong>of</strong>ficers under them.<br />
This is also required to prevent commitment <strong>of</strong> liabilities and unregulated<br />
expenditure before actual work wise distribution <strong>of</strong> fund.<br />
I am, therefore, enclosing herewith a statement showing tentative allocations against<br />
normal CRF projects (State Category) against a tentative outlay <strong>of</strong> Rs.1622.00 lakhs<br />
under the programme as seen during the last couple <strong>of</strong> years.<br />
You may like to consult Planning Department and convey your approval <strong>of</strong> the<br />
tentative allocations so that CE (EZ) and CE (WZ) could draw their work plans,<br />
which will be restricted within 80% <strong>of</strong> the resource base.<br />
Enclo: as above<br />
Yours faithfully<br />
(Tomi Ete)<br />
Chief Engineer (D&P)<br />
Copy to:<br />
1. The Development Commissioner, Government <strong>of</strong> <strong>Arunachal</strong> Pradesh, Itangar.<br />
2. The Secretary (Planning), Government <strong>of</strong> <strong>Arunachal</strong> Pradesh, Itanagar along<br />
with the statement.<br />
3. The PS to Minister (<strong>PWD</strong>&UD), AP, Itanagar for kind information <strong>of</strong> Hon’ble<br />
Minister please.<br />
4. The PS to Minister (Finance & Planning), AP, Itanagar for kind information <strong>of</strong><br />
Hon’ble Minister please.<br />
5. The Chief Engineer (EZ), <strong>PWD</strong>, AP, Itanagar.<br />
6. The Chief Engineer (WZ), <strong>PWD</strong>, AP, Itanagar.<br />
7. The Director (Planning), Government <strong>of</strong> <strong>Arunachal</strong> Pradesh, Itanagar.
CRF
STATEMENT SHOWING BALANCE FUND REQUIREMENT AND TENTATIVE ALLOCATION UNDER CRF DURING 2007-08<br />
(Rupees in lakhs)<br />
Page - 1<br />
Sl. No.<br />
Name <strong>of</strong> the Scheme<br />
Sanctioned<br />
Cost<br />
Technical<br />
Sanction Cost<br />
Achivement up<br />
to March 2007<br />
Balance<br />
Proposed<br />
allocation<br />
2007-08<br />
Remarks<br />
A<br />
1 2 3 4 5 6 7 8<br />
Schemes fully funded by the Govt. <strong>of</strong> India<br />
1 Approach road to V.K.V. school at Along (6.00Km) 98.88 98.85 105.35 Nil 0.00 Completed<br />
2 Improvement <strong>of</strong> Jirdin V.K.V. road to 152.48 158.57 174.01 Nil 0.00 Completed<br />
J.N.V. School on Taso-Mobuk(7.75Km)<br />
3 Patum Rumgong Road (22.00Km) 719.00 762.30 788.93 Nil 0.00 Completed<br />
4 C/o Along - Kaying BRTF road to Donyi Polo 42.68 42.68 42.68 Nil 0.00 Completed<br />
Degree College at Kamki<br />
5 Construction <strong>of</strong> Steel bridge over River Sigen 184.78 183.76 164.76 19.00 0.00 Completed<br />
6 Extension and Resurfacing <strong>of</strong> Basar Township Road 244.80 257.00 124.69 132.31 100.00 In progress<br />
7 Improvement/construction <strong>of</strong> Puchigeko to 325.07 325.07 93.62 231.45 100.00 In progress<br />
Sikiputu via Anglomodak, Pegalomdak and Gichi<br />
8 Construction <strong>of</strong> Mebo-Dholla road(36.70 Km) 1005.50 1081.00 795.64 285.36 100.00 In progress<br />
9 Construction <strong>of</strong> Mebo-Dholla road (Ph-II) 345.18 363.35 171.40 191.95 100.00 In progress<br />
(36.70 Km)<br />
10 Improvement <strong>of</strong> Yingkiong Township road 230.00 227.49 230.00 Nil 0.00 Completed<br />
(20.00 km)<br />
11 C/o PSC girder and RCC slab composite bridge 305.88 334.05 150.71 183.34 125.00 In progress<br />
over river Buri - Dihing (Span – 120.00 mtr).<br />
E:\crf-07-08
STATEMENT SHOWING BALANCE FUND REQUIREMENT AND TENTATIVE ALLOCATION UNDER CRF DURING 2007-08<br />
(Rupees in lakhs)<br />
Page - 2<br />
Sl. No.<br />
Name <strong>of</strong> the Scheme<br />
Sanctioned<br />
Cost<br />
Technical<br />
Sanction Cost<br />
Achivement up<br />
to March 2007<br />
Balance<br />
Proposed<br />
allocation<br />
2007-08<br />
Remarks<br />
1 2 3 4 5 6 7 8<br />
12 Steel truss girder bridge over river Dibang 434.88 442.00 474.92 Nil 4.00 Pending<br />
(Span:150m)<br />
errection <strong>of</strong><br />
decking to be<br />
completed<br />
13 C/o Chowkham -Tezu road via Alubari & Digaru 208.54 208.54 187.75 21.00 21.00 Decking to be<br />
hut( C/o RCC Bridge over river Bereng)(span:80m)<br />
completed<br />
14 Roing - Shantipur Road 482.50 528.76 528.76 Nil 0.00 Completed<br />
15 By pass road to Roing township 288.45 288.45 308.78 Nil 0.00 Completed<br />
16 Re-surfacing <strong>of</strong> Road at Itanagar under 147.81 147.81 147.52 Nil 0.00 Completed<br />
Division A & B<br />
17 C/o Bailey Bridge over river Konko Nallah 120.23 132.31 132.52 Nil 0.00 Completed<br />
(20 mtr span) including approach and rain etc. <strong>of</strong><br />
the approach road to Sangge Lhaden Sports Shool<br />
Complex (1.10 Km) at Chimpu, Itanagar.<br />
18 Parking space near R.K. Mission Hospital Itanagar 9.36 9.36 9.36 Nil 0.00 Completed<br />
on NH-52 'A'<br />
19 C/o road from Bat on Ita-Jotte road to Chimi 396.39 400.00 300.00 100.00 58.00 In progress<br />
via Muglipop (7.50 km) (Ph-I)<br />
20 Improvement <strong>of</strong> Naharlagun Township roads. 292.72 320.61 320.61 Nil 0.00 Completed<br />
21 C/o Double lane approach road to <strong>Arunachal</strong> 117.95 117.89 117.89 Nil 0.00 Completed<br />
University at Rono Hill, Doimukh<br />
22 Approach road to DC Office at Yupia (Ph-I) 89.40 93.87 93.87 Nil 0.00 Completed<br />
E:\crf-07-08
STATEMENT SHOWING BALANCE FUND REQUIREMENT AND TENTATIVE ALLOCATION UNDER CRF DURING 2007-08<br />
(Rupees in lakhs)<br />
Page - 3<br />
Sl. No.<br />
Name <strong>of</strong> the Scheme<br />
Sanctioned<br />
Cost<br />
Technical<br />
Sanction Cost<br />
Achivement up<br />
to March 2007<br />
Balance<br />
Proposed<br />
allocation<br />
2007-08<br />
Remarks<br />
1 2 3 4 5 6 7 8<br />
23 C/o Double lane road to <strong>Arunachal</strong> University at 114.56 134.57 124.56 10.01 10.00<br />
Rono Hill, Doimukh (Pavement & Supplementary<br />
Works = 2.36 km)<br />
24 Improvement/Extension <strong>of</strong> Sagalee Township 528.58 528.58 115.00 413.58 150.00 In progress<br />
Road (5.975 Km)<br />
25 Improvement <strong>of</strong> road from Dha Hill on 839.23 827.13 364.78 462.35 275.00 In progress<br />
Tamen-Tali road to Gangte (13.10 km).<br />
26 C/O Bypass Road from BRTF Road to VKV School 286.10 286.10 60.00 226.10 95.00 In progress<br />
Via General Ground,SSB Colony and HS School<br />
at Koloriang<br />
27 C/o Road from Khenewa C.O. Hq. To Seppa- 581.00 581.00 315.00 266.00 95.00 In progress<br />
Chayangtajo via Purdung and Pakke village<br />
(15 km) (Scope : Widening 0.00 to 11.00 km,<br />
SMC, Slab Culverts, Minor bridges, R&B wall,<br />
Side drain & Traffic signs)<br />
28 Bypass road to Bomdila township from BRTF 314.75 314.75 313.91 0.84 6.00 To be completed<br />
road via New Bomdila<br />
29 Improvement <strong>of</strong> road from Dirang -Tawang road 327.39 313.46 275.71 37.75 38.00 To be completed<br />
to Gonpache to connect National Yak Research<br />
Centre<br />
30 Impvt. & upgradation <strong>of</strong> bypass for Bomdir on 188.79 188.79 188.85 Nil 0.00 Completed<br />
BRTF road to District Headquater at Tawang<br />
31 Improvement <strong>of</strong> Road from De-delo to Leporianf (10 Km)<br />
in the State <strong>of</strong> <strong>Arunachal</strong> Pradesh<br />
628.60 -- 0.00 628.60 90.00 New sanction<br />
E:\crf-07-08
STATEMENT SHOWING BALANCE FUND REQUIREMENT AND TENTATIVE ALLOCATION UNDER CRF DURING 2007-08<br />
(Rupees in lakhs)<br />
Page - 4<br />
Sl. No.<br />
Name <strong>of</strong> the Scheme<br />
Sanctioned<br />
Cost<br />
Technical<br />
Sanction Cost<br />
Achivement up<br />
to March 2007<br />
Balance<br />
Proposed<br />
allocation<br />
2007-08<br />
Remarks<br />
1 2 3 4 5 6 7 8<br />
32 Construction <strong>of</strong> approach road to V.K.V. at Dobi in Lower<br />
Subansiri District, Ziro (length = 2025 mtr) in the State <strong>of</strong><br />
<strong>Arunachal</strong> Pradesh.<br />
33 Improvement and up-gradation <strong>of</strong> Road network Lumla<br />
Township road (15.095 Km) in the State <strong>of</strong> <strong>Arunachal</strong><br />
Pradesh.<br />
34 Construction <strong>of</strong> Road from Pai to Pinegroove (20.00 Km)<br />
Phase-I (0.00 - 5.00 Km) in the State <strong>of</strong> <strong>Arunachal</strong><br />
Pradesh.<br />
35 Improvement <strong>of</strong> Naharlagun Township Road Phase-II in<br />
the State <strong>of</strong> <strong>Arunachal</strong> Pradesh.<br />
65.46 -- 0.00 65.46 35.00 New sanction<br />
600.00 -- 0.00 600.00 60.00 New sanction<br />
500.00 -- 0.00 500.00 50.00 New sanction<br />
500.00 -- 0.00 500.00 50.00 New sanction<br />
36 C/o Rima Motongsa road (18.00 km) Ph-I 0.00 to 7.00<br />
km.<br />
500.00 -- 0.00 500.00 60.00 New sanction<br />
Total: 12216.94 9698.10 7221.58 5375.10 1622.00<br />
E:\crf-07-08
STATEMENT SHOWING BALANCE FUND REQUIREMENT AND TENTATIVE ALLOCATION UNDER CRF DURING 2007-08<br />
(Rupees in lakhs)<br />
Page - 5<br />
Sl. No.<br />
Name <strong>of</strong> the Scheme<br />
Sanctioned<br />
Cost<br />
Technical<br />
Sanction Cost<br />
Achivement up<br />
to March 2007<br />
Balance<br />
Proposed<br />
allocation<br />
2007-08<br />
Remarks<br />
1 2 3 4 5 6 7 8<br />
B Schemes Under EI<br />
1) C/o road from Dirang-dzong to Namthung via Sanlum<br />
(19.215km)<br />
50% N/S<br />
50% C/S 544.98 1089.53 52.14 492.84<br />
2) By pass road from Papu Nalla to Itanagar via Donyi Polo Vidya<br />
Bhawan (7.50km) in Papum Pare Dist.<br />
50%S/S<br />
50%C/S 388.58 827.72 120.00 268.58<br />
Total: 933.56 1917.25 172.14 761.42<br />
Grand Total 13150.50 11615.35 7393.72 6136.52<br />
Chief Engineer (D&P)<br />
<strong>PWD</strong>, AP, Itanagar<br />