29.01.2015 Views

Port infrastructure for coal transportation - The Associated Chambers ...

Port infrastructure for coal transportation - The Associated Chambers ...

Port infrastructure for coal transportation - The Associated Chambers ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Marching towards Glory ……<br />

Mundra <strong>Port</strong> & Special Economic Zone Ltd.<br />

1


Adani Group<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Adani Power Limited<br />

Mundra <strong>Port</strong> & SEZ Limited<br />

Adani Enterprises Limited<br />

Rs. 27,392 Cr.<br />

Rs. 28,498 Cr.<br />

Rs. 73,385 Cr.<br />

2


Agenda<br />

1<br />

Mundra <strong>Port</strong> & SEZ Limited<br />

2<br />

West Basin Coal Import Terminal<br />

3<br />

Future Outlook<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited


Major Milestones<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

1998 2010<br />

Major Milestones<br />

1998<br />

1998<br />

1999<br />

2001<br />

2001<br />

2001<br />

Approval from GMB to set captive jetty<br />

Berth 1, 2 operational<br />

Berth 3, 4 operational<br />

Concession agreement with GMB<br />

Agreement with GGSRL<br />

Agreement with Indian Oil Corporation<br />

2003<br />

2005<br />

2006<br />

2007<br />

2007<br />

2009<br />

Container Terminal 1 operations<br />

(sub concession – P&O)<br />

Merger of Adani <strong>Port</strong> Ltd with<br />

Gujarat Adani <strong>Port</strong> Ltd , SPM operational<br />

Company name changed to MPSEZ<br />

Terminal 2 & Container Terminal 2<br />

operations commenced<br />

IPO and listing of shares at BSE & NSE<br />

Auto terminal commences operational<br />

2002<br />

Agreement with Indian Railways Mundra-Adipur<br />

2010<br />

West Basin / Fertilizer Cargo Complex<br />

commences operational<br />

4


Value Chain Integration<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Integrated Coal<br />

Management<br />

Coal Mining<br />

• Development and<br />

operation of Parsa East<br />

and Kente Basan <strong>coal</strong><br />

blocks at Chhattisgarh<br />

• Development and<br />

operation of<br />

Machhakata and<br />

Chhendipada <strong>coal</strong><br />

blocks at Orissa<br />

• LoA <strong>for</strong> development,<br />

mining and<br />

<strong>transportation</strong> of <strong>coal</strong><br />

from Parsa <strong>coal</strong> block at<br />

Chhattisgarh<br />

• Coal mining<br />

concessions in Bunyu<br />

island, Indonesia<br />

• Coal Mining interest in<br />

Gaililee basin,<br />

Queensland, Australia<br />

<strong>Port</strong>s and<br />

Logistics<br />

• Developer and operator of<br />

the largest private sector<br />

multi-user port at Mundra<br />

(Gulf of Kutch , Gujarat ,<br />

India)<br />

• Developing Dry Bulk<br />

terminals at Dahej,<br />

Multipurpose port at<br />

Hazira, Gujarat and a<br />

dedicated <strong>coal</strong> jetty at<br />

Mormugao, Goa<br />

• Providing integrated<br />

container train services &<br />

ICDs at Patli & Kishangarh<br />

under Adani Logistics Ltd<br />

( ALL)<br />

• Synergy between ports,<br />

SEZ and logistics to deliver<br />

seamless connectivity<br />

Power Generation<br />

and Transmission<br />

• Currently developing<br />

power projects of 9,570<br />

MW across India<br />

• 1,980 MW already<br />

under operation<br />

including India's 1 st<br />

660 MW super<br />

critical thermal unit<br />

• 2,640MW under<br />

planning<br />

• Operational and planned<br />

power transmission<br />

network of 1,619 kms.<br />

5


Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Adani’s Interest in the <strong>Port</strong> Sector<br />

DOMESTIC PORTS:<br />

• Mundra: India’s Largest Private Sector Multi-User port<br />

• Existing Basin: 55 MMTPA<br />

• West Basin : 60 MMTPA<br />

• Additional berths : 20 MMTPA<br />

• Dahej: Bulk berths with sub concession from Petronet LNG<br />

Limited (PLL) 20 MMTPA<br />

• Murmugao: Berth operation at major port 7 MMTPA<br />

• Hazira: LoI received to develop multi cargo terminal 80<br />

MMTPA<br />

PORTS OUTSIDE INDIA:<br />

SEZ:<br />

• Dudgeon, Australia: Coal handling of 50 MMTPA<br />

• Bunyu, Indonesia : Coal handling of 10 MMTPA<br />

• Mundra SEZ: Master plan of 15000 Ha<br />

LOGISTICS:<br />

• Adani Logistics Ltd: Container trains, ICDs<br />

• KRCL: Gandhidham – Palanpur Link<br />

6


Our Business Model<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Products handled<br />

• Coal<br />

• Fertiliser<br />

• Agri products<br />

• Minerals<br />

• Containers<br />

• Liquid<br />

• Automobiles<br />

• Crude<br />

• Vegetable oil<br />

Demand drivers<br />

• Energy shortage<br />

• Location<br />

attractivenes<br />

• Proximity to N-W<br />

hinterland<br />

• Proximity to imp.<br />

World trade route<br />

• Road- rail<br />

connectivity<br />

Geography /Hinterland<br />

Mundra<br />

India<br />

MPSEZ’s hinterland:<br />

Gujarat, Rajasthan, Uttar Pradesh, Madhya Pradesh,<br />

NCR, Punjab, Haryana and Upper North<br />

Services<br />

• Stevedoring<br />

• Back up cargo<br />

handling<br />

• Storage – dry /<br />

liquid<br />

• Rail yard<br />

operations<br />

• Custom house<br />

operations<br />

• Container<br />

operations<br />

• Bunkering<br />

• Pilotage & towage<br />

7


Multi-Modal Connectivity<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Air<br />

• 1900 meters long runway<br />

• Plans to upgrade the runway to 4500 meters<br />

• Proposed passenger & cargo handling<br />

• One hour drive to Kandla and Bhuj<br />

Road<br />

• Connected to National Highway Network of<br />

the Golden Quadrilateral Project through<br />

National Highway 8A Extension (NH 8A<br />

Extn)<br />

• Connected to Gandhidham via SH 6 & 50<br />

and Bhuj by SH 48<br />

Pipeline<br />

• <strong>Port</strong> of choice <strong>for</strong> crude and other liquid<br />

cargo bound <strong>for</strong> northern hinterland<br />

including refineries of Punjab.<br />

8


Rail Connectivity -A Competitive Advantage<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Shortest Route to the Northern Hinterland<br />

Distance from Mumbai – Vasai –<br />

Vadodara – Kota – Mathura – Delhi.<br />

Distance from Mundra <strong>Port</strong> (Mundra <strong>Port</strong><br />

–Adipur–Gandhidham–Bhildi –Palanpur–<br />

Jaipur –Delhi)<br />

Geographical advantage<br />

Double stacking of<br />

containers operational<br />

1500 km<br />

1058 km<br />

442 km<br />

Liquid cargo being<br />

handled at the port<br />

• 57 -Km private railway link, doubling in progress<br />

• 4 Locomotives – Owned<br />

9


MPSEZ Ranked 9 th in India<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Cargo handled in 2009-10 (Million Tons)<br />

Revenue growth - 55% CAGR (5 yr)<br />

Cargo growth - 42% CAGR (5 yr)<br />

10


Cargo Composition 2009-10<br />

MPSEZ has handled 40 million tons in FY 2009-10<br />

11<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited


Certifications & Accolades<br />

ISO 9001:2008<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

ISO 14001:2004<br />

• “<strong>Port</strong> Authority of the Year 2006” award, in the Middle<br />

East and Indian Subcontinent by Lloyd’s List.<br />

OHSAS 18001 :<br />

2007<br />

NSPC<br />

ISPS<br />

• C-40 World Best <strong>Port</strong> 2008 confer by IAPH<br />

(International Association of <strong>Port</strong>s & Harbor<br />

12


Effective capacity : Mundra, Gujarat<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Effective capacity of 115 million tons per annum<br />

90 tanks with 9<br />

8 cargo berths <strong>for</strong><br />

90 tanks with 9<br />

dock lines, 4.02<br />

handling <strong>for</strong> handling dry & dry<br />

dock lines, 4.02 KL<br />

KL storage<br />

liquid & liquid cargo cargo<br />

storage capacity<br />

capacity<br />

Terminal 1&2<br />

Liquid terminal<br />

SPM<br />

SPM capable of<br />

SPM capable of<br />

handling<br />

handling 3,60,000<br />

3,60,000 DWT<br />

DWT vessels<br />

vessels<br />

Maruti Suzuki<br />

exports its<br />

vehicle from our<br />

port<br />

West Basin<br />

Coal import<br />

terminal with 3 3<br />

berths<br />

Ro Ro<br />

Container Terminal 1&2<br />

4 berths capable<br />

of handling 2.5<br />

million TEUs<br />

13


Multipurpose Terminals<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Multipurpose Terminal 1 Multipurpose Terminal 2<br />

Length & Width : 895 m Lx 31 m W<br />

Draught : 12 – 15 Meter<br />

Type of Cargo : Dry/Liquid<br />

Length & Width : 575 m L x 48 m W<br />

Draught : 13.5 – 17.5 Meter<br />

Type of Cargo : Dry<br />

14


Container Terminals<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Salient points<br />

• 2 Container Terminals:<br />

• Adani Mundra Container<br />

Terminal: 1.25 MM TEU<br />

• Mundra International Container<br />

Terminal: 1.25 MM TEU<br />

• Length: 632 meters each<br />

• MPSEZ has berthed the<br />

largest container vessel M.V<br />

Northern Jaguar of MSC lines<br />

(8400 TEU’s and 332 m long)<br />

15


Adani Mundra Auto Terminal<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Salient points<br />

• MPSEZ has already tied up with Maruti Suzuki <strong>for</strong> the car<br />

terminal <strong>for</strong> 25 Years.<br />

• Two dedicated Ro-Ro berths to be developed by 2012<br />

• Backup area <strong>for</strong> parking of automobiles up to 20,000 cars<br />

• Large area available <strong>for</strong> setting up facilities <strong>for</strong> Pre-Dispatch<br />

Inspection center, paint/repair shop etc within a few kms from the<br />

port<br />

• Excellent intermodal links – connections to rail/road/sea<br />

• Easy accessibility to the Northern Hinterland<br />

16


Single Point Mooring<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Salient points<br />

• 8 nautical miles from port<br />

• Connected to IOCL tank farm by sub sea<br />

cement coated 48” pipeline<br />

• Discharge rate of over 10000 Cu.Mt/ hour<br />

• MPSEZ will commission another SPM in this<br />

financial year with a capacity of 9 million tons<br />

per annum<br />

17


Tugs<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Salient points<br />

• 10 ASD tugs (average age ~ 2.5 years)<br />

• 7 tugs: 56 Ton Bollard Pull<br />

• 3 tugs : 70 Ton Bollard Pull<br />

18


Current Equipment Base<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Conveyor system<br />

Import – 1500 MT/hour<br />

Goliath Cranes<br />

Mobile harbour cranes<br />

100 Tons (35 CBM) – 4<br />

Liebherr & 4 Gotwarld Cranes<br />

3 Gantry Cranes used<br />

<strong>for</strong> stacking pipes<br />

SWL of 10 MT & 20 MT<br />

Capacity of stacking 30<br />

pipes / hour<br />

Fertilizer Cargo<br />

Complex<br />

46 MBU machines<br />

Capacity of 10 rakes / day<br />

19


Fertilizer Cargo Complex (FCC)<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

• MPSEZ handles over 3 million tons of fertiliser every year. Fertilizer has always been a labor<br />

oriented business and there<strong>for</strong>e there was need to develop mechanized system <strong>for</strong> fertilizer<br />

cargo handling<br />

• FCC has 2 operational lines with 44 bagging machines having a capacity of bagging 440<br />

bags a minute (2 x 22 x 10)<br />

Be<strong>for</strong>e FCC<br />

• High dependency on labor<br />

• Manual Evacuation consumed lot of time<br />

• Non availability of labor during the festival and<br />

other seasons<br />

• Manual Evacuation Capacity : 4 rakes/day<br />

After FCC was commissioned<br />

•Mechanized with single point labor intervention<br />

•Reduction in labor by 80%<br />

•Can handle multiple grades of cargo<br />

• Mechanized Evacuation Capacity : 8-10<br />

rakes/day<br />

20


New developments planned at MPSEZ<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Multipurpose Berths<br />

• 4 Multipurpose berths <strong>for</strong> handling various<br />

dry commodities<br />

• Vessel size up to 60000 DWT vessels<br />

• Backup development <strong>for</strong> the cargo<br />

handling<br />

Container Jetty at South Basin<br />

• 810 m container jetty with capacity to<br />

handle UPPX vessels<br />

• Design provision of 9 nos RMQC<br />

• Dredged level upto 17.5 m CD<br />

Additional berth at West Basin<br />

• Berth no 4 at West Basin capable of<br />

handling 250000 DWT vessel<br />

• 3 grab unloaders and jetty conveyors<br />

Extension of Goliath Yard <strong>for</strong> Steel<br />

• Construction of paver block roads<br />

and road crossovers<br />

• Construction of foundation and<br />

rails<br />

Backup development at South Basin<br />

• Development of container yard<br />

• Dev. Of main gate with parking<br />

area<br />

• Railway evacuation and internal<br />

roads<br />

Agri Park<br />

• Transit and permanent godowns<br />

• Plot area of 2.5 lakh sq. meters<br />

• Wagon loading and truck loading<br />

system<br />

21


Planned Investments in New Equipment<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Mobile Harbor Cranes<br />

• LHM mobile harbor cranes – 8<br />

Container Jetty at South Basin<br />

• RMQC – 6<br />

• Crane rail of RMQCs of 35m rail<br />

gauge<br />

• Power supply from switchyard to<br />

electrification distribution of the<br />

terminal<br />

Backup development at South Basin<br />

• RTG – 14<br />

• Internal transport vehicles<br />

• Reach stackers – 3<br />

• Empty handlers – 1<br />

Extension of Goliath Yard <strong>for</strong> Steel<br />

• Goliath cranes – 5<br />

• Vaccumm lifters – 7<br />

• Telescopic pipe lifters, Coil Tongs,<br />

Magnetic pipe handlers<br />

• Forklifts - 4<br />

• Mobile cranes – 2<br />

• Reach stacker – 1<br />

Mechanization of B-03 at West Basin<br />

• Conveyor system – 10<br />

• Transfer tower – 4<br />

• Accessories and connection<br />

• Gantry unloaders – 3 (2000 TPH)<br />

22


Agenda<br />

1<br />

Mundra <strong>Port</strong> & SEZ Limited<br />

2<br />

West Basin Coal Import Terminal<br />

3<br />

Future Outlook<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited


West Basin Master Plan<br />

On completion the West <strong>Port</strong> will have 20 berths with around 19 meter<br />

depth capable of handling over 250 milion tons of cargo per annum<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited


Phase 1<br />

Phase 1 is already commissioned with two mechanized berths capable of<br />

handling vessels up to 200,000 DWT<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited


West Basin Floatilla<br />

• Berthing Facility 24 X 7<br />

basis<br />

• State of art ASD Tug<br />

Fleet with 4x70 Ton<br />

Bollard Pull , 6000 BHP<br />

• Average Age of 2.5 Years<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited


West Basin – Salient Features<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

• Extension of Mundra <strong>Port</strong> at a distance of 22 km<br />

• Dedicated <strong>coal</strong> import terminal <strong>for</strong> supplying <strong>coal</strong> to Coastal Gujarat<br />

Power Limited (CGPL) and Adani Power Limited.<br />

• Coastal Gujarat Power Limited (CGPL) will generate 4000 MW and is<br />

expected to be commissioned by 2013<br />

• Adani Power Limited will generate 4620 MW and is expected to be fully<br />

commissioned by 2012<br />

• Currently 1980 MW under generation, including 1*660 MW<br />

supercritical unit<br />

• Available depths to handle cape size bulk carriers up to 200,000 DWT<br />

• When fully commissioned it will have 20 berths capable of handling over<br />

250 million MT per annum<br />

• Berths will be constructed to serve the requirements of industries in the<br />

SEZ and the hinterland


West Basin – Operational Parameters<br />

• 3 operational berths capable of handling 60 million tons per annum<br />

• Depth will be 19 meters at the berth face in phased manner<br />

• Capable <strong>for</strong> handling cape size vessels up to 200,000 DWT<br />

Infrastructure<br />

Breakwater<br />

Wharf<br />

Backup yard<br />

5 km long, + 9.0 m avg. height<br />

4 million MT Rock Fill ( Approx.).<br />

3 berths of 1120 m quay length<br />

210 hectares capable of storing 3 million<br />

tons of cargo<br />

Materials Handling Systems<br />

Ship unloaders<br />

Stacker reclaimers<br />

Conveying systems<br />

Wagon loading<br />

system<br />

Truck loading<br />

systems<br />

Railway Sidings<br />

4 grab type ship unloaders with handling<br />

capacity of 2000 TPH<br />

4 stacker reclaimers with 6000 TPH<br />

stacking capacity, 2500 reclaiming cap.<br />

21 km of conveyor line @ 7.5 m/s<br />

conveying speed<br />

2 in-motion rapid wagon loading system<br />

@ 1 wagon per minute<br />

3 Silos<br />

3 sidings<br />

Services Dust suppression system, fire fighting<br />

28


Evacuation Capacity : 100,000 MT /day<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Rake Loading Capacity<br />

• Silo capacity : 4000 MT (2 silos)<br />

• Rake loading : 3000 MT / hr<br />

• Capacity / line : 11 rakes / line<br />

• Rail lines : 2<br />

• Rail evacuation capacity: 88,000 MT / day<br />

Truck Loading Capacity<br />

• Silo capacity : 1500 MT (3 silos)<br />

• Silo1 : 3 trucks at the same time<br />

• Silo 2,3 : 2 trucks at the same time<br />

• Truck loading : 600 MT / hr (30 trucks / hr)<br />

• Truck evacuation capacity : 12,000 MT / day<br />

29


Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

TT-2<br />

Coal Logistics <strong>for</strong> Power Plants<br />

AR-5/6<br />

AR-3<br />

AR-4<br />

TT-1<br />

Mechanization of Berth 3 : July 2012<br />

Construction of Berth 4 : April 2012<br />

ARC-1<br />

TT<br />

9<br />

TT-3<br />

TT<br />

10<br />

ARD-1<br />

TT<br />

11<br />

ARD-2<br />

TT-4 TT-5 TT-6 TT-7 TT-8<br />

AR-2<br />

AR-1<br />

TT<br />

12<br />

ARD-3<br />

TT<br />

13<br />

ARD-4<br />

GUL<br />

3<br />

TT<br />

14<br />

AD-1A<br />

AD-1C<br />

AD-1D<br />

3<br />

AD-1B<br />

WL1<br />

AD-2B<br />

TL 1/ 2/ 3<br />

TT<br />

15<br />

WL2<br />

2<br />

AD-2A<br />

1<br />

Future truckload facility<br />

Phase 1 A<br />

Phase 1 B<br />

Phase 1 C<br />

APL SILO<br />

3000 Ton<br />

UMPP/TATA<br />

AD-3B<br />

TT<br />

16<br />

Legends :<br />

TT - Transfer Tower<br />

AR - Adani Receiving<br />

AD - Adani Dispatch<br />

WL - Wagon Loading<br />

TR - Truck Loading<br />

GUL- Grab Unloader<br />

AD-2C<br />

AD-3C<br />

TT<br />

17<br />

CGPL Scope<br />

FUTURE<br />

Rail Track<br />

3 Nos<br />

1. Three numbers Truck Loading station silo Cap. 1500 MT each.<br />

2. Two numbers Wagon Loading station Silo Cap. 4000 MT each.<br />

3. Provision <strong>for</strong> Truck Loading with Conveyor (future)<br />

Stacker-cum-Reclaimer<br />

( 4 Yards- 4 Nos )<br />

(2 Nos of Future )


Agenda<br />

1<br />

Mundra <strong>Port</strong> & SEZ Limited<br />

2<br />

West Basin Coal Import Terminal<br />

3<br />

Future Outlook<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited


South Basin<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Salient points<br />

• 6 Container berths<br />

• 2 deep water berths <strong>for</strong> LNG<br />

terminal<br />

• 2 Liquid offshore berths<br />

• 2 RO-RO Terminal & 1 Service berth<br />

32


Future plans - Mundra<br />

33<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited


Future Outlook<br />

Multi<br />

National<br />

<strong>Port</strong><br />

Another Mega <strong>Port</strong> in the making ……….<br />

Dedicated terminals <strong>for</strong> …….<br />

Liquid<br />

100 Million<br />

Tons by<br />

2012-13 Container<br />

200 Million<br />

Tons by<br />

2020<br />

Dry Bulk<br />

Break Bulk<br />

LNG<br />

Cargo Airport<br />

Ship repair yard<br />

RoRo<br />

34


CSR Initiatives<br />

Mundra <strong>Port</strong> & Special Economic Zone Limited<br />

Quality education<br />

• Underprivileged children<br />

• Training volunteers <strong>for</strong> teaching<br />

Health<br />

• Mobile dispensary<br />

• Immunization <strong>for</strong> children<br />

Livelihood development<br />

• Vocational training<br />

• Animal Husbandry<br />

Rural <strong>infrastructure</strong> development<br />

• Pond deepening<br />

• Water drainage system<br />

• Girl child education<br />

• Adani Vidyamandir<br />

• Teaching sanitation in rural area<br />

• HIV /AIDS awareness campaign<br />

• Cattle vaccination<br />

• Check dam construction<br />

• Other village <strong>infrastructure</strong><br />

• Roads, drinking water, power etc.<br />

35


Thank You<br />

36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!