28.01.2015 Views

NW.P.PC.L - Delhi Pollution Control Committee

NW.P.PC.L - Delhi Pollution Control Committee

NW.P.PC.L - Delhi Pollution Control Committee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

a. ~<br />

- '---<br />

I'<br />

-<br />

"\<br />

OFFICE OF THE: DELHI POLLUTION CONTROL COMMITTEE<br />

4thFLOOR, IS8T BUILDING, KASHMERE GATE, DELHI-110006<br />

~ ""'.., For Ornce Use Only<br />

FORM NO.. ,. ..,...........-....-.....<br />

Received by ,.-. ..- .-. ., ....-<br />

Date of Receillino .,- "'-"-" ."... ....-<br />

Common Applicationfor Consent<br />

UnderWater(Preventionand <strong>Control</strong> of <strong>Pollution</strong>) Act, 1974and<br />

UnderAir (Preventionand <strong>Control</strong> of <strong>Pollution</strong>) Act, 1981,as amended<br />

ORANGE<br />

From:<br />

MIs Pragati Power Corporation Ltd.<br />

IP Estate, Ring Road,<br />

New <strong>Delhi</strong> - 110002<br />

Dated: '2. '&- 01.-0..(,.<br />

To,<br />

The Member Secretary,<br />

<strong>Delhi</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Committee</strong>,<br />

4thFloor, I.S.8.T. Building,<br />

Kashmere Gate, <strong>Delhi</strong> - 110006.<br />

SirlMadam,<br />

We herebyapply for<br />

(Q Consent to Esta~lish'Operate'Renewal of Consent under section 25 and 26 of the Water<br />

(Preventionand <strong>Control</strong> of <strong>Pollution</strong>)Act, 1974, as amended.<br />

(ii) Consentto Establ'h/OperatelRenewal of Consent under section 21 of the Air (Prevention and<br />

<strong>Control</strong>of <strong>Pollution</strong>)Act, 1981, as amended.<br />

Part A: General<br />

1. Name, designation office address with<br />

Telephone: fax numbers, e-mail of the<br />

applicant!occupier'Institution' Local Body<br />

Rajinder Tiku, DGM (I/C)-Projects,<br />

Pragati Power CorporationLimited, I.P.<br />

Estate, Ring Road, New <strong>Delhi</strong> - 110002<br />

Tel:23370346<br />

Fax:23378947<br />

Email:r~tiku@hotmail.com<br />

2. (a) Name and address of the industrial<br />

unit/premises: for which the application is<br />

made. (withtelephoneand fax number)<br />

(b) Status ofthe Unit<br />

Rent<br />

(c) Name and address of the premises owner (with:<br />

telephone and fax number)<br />

Proposed 350 MW (nominal) Pragati II<br />

Gas based CombinedCycle Power<br />

Project,New <strong>Delhi</strong>.<br />

Tel:23370346<br />

Fax:23378947<br />

~Owned<br />

Don<br />

Premises<br />

Pragati Power CorporationLimited, I.P.<br />

Estate, Ring Road, New <strong>Delhi</strong> - 110002<br />

Tel:23370346<br />

Fax~117R947


-<br />

(d) Name & Designation of the person authorized to :<br />

sign this application form (The original<br />

authorization except in case of individual<br />

proprietary concern to be enclos~)<br />

3. Names, residence address with telephone and fax:<br />

number of Managing Director/Managing Partner and<br />

officer responsible for matters connected with<br />

pollution control<br />

4. (a) Are you registered as a small scale Industrial Unit:<br />

(b) If yes, give the number and date of registration<br />

5. Gross capital investment (in Rs.) of the Unit without :<br />

depreciation till date of application (cost of building,<br />

land, plant and machinery) (To be supported by an<br />

affidavit and: Certificate form a Charted Accountant.<br />

For proposed unit(s), give estimated figure)<br />

Ra.jinder Ti1.l.1. DGM (IIC )-Pfl)jects.<br />

I A., "" Anne"." .r<br />

Yes<br />

GJNO<br />

Tlus is a proposed project.<br />

Estimated Cost=Rs.1 388.66 cr.<br />

6. (a) Location of the Unit<br />

:~ IndustrialDNon Industrial<br />

~ Area Area<br />

(b) If situated in industrial Area, details of CETP:<br />

Society membership thereof (Enclose copy of I NOTAPPLIClillLE<br />

CETP membership)<br />

7. (a) Total plot area ofthe unit (in sq. meter)<br />

(b) Built-up area ofthe unit (in sq. meter)<br />

95.000 sq. meter<br />

70,000 sq. meter<br />

(c) Sanction Power Load (in HP)<br />

8. Month and Year of Commencement of Production<br />

I<br />

N.A.<br />

I 2008-09<br />

(a) Proposed<br />

Unit<br />

Gas based combined cycle power pf(~iect<br />

comprising Gas Tm-bine. Heat Recoyen<br />

Steam Generator and Steam Turbine<br />

(b) Existing Unit<br />

9. (a) Number of workers<br />

(b) Number of employees (including workers and<br />

office staff)<br />

10. List of products and by-products manufactured in<br />

tones/month, KI/month or numbers/month (Give<br />

figure corresponding to maximum installed<br />

production capacity (Separate sheet may be<br />

enclosed)<br />

11. List of raw materials and process chemicals with<br />

annual consumption corresponding to above stated<br />

production figures, in tones/month or KUmonth or<br />

numbers/month (Separate sheet may be enclosed)<br />

12. Description of process of manufacture for each of the<br />

products (showing illput, output, quality and quantity<br />

Nil<br />

J\1ax. 350 nos. during construction<br />

175 persons<br />

(9{)staff+ 85 contractor's employee)<br />

350 MW Electrical Po\\er ( Nominal)<br />

MaXlll.capacity 385 MW depending on<br />

clmtif.,.uration<br />

Refer page no. 3. Chapter I ofRELA.<br />

report / Annexure- n<br />

Refer page no. 16-18. Chapter 2 of REIA<br />

report


.,J#<br />

of solid, liquid and gaseous wastes, if any from each<br />

unit process)<br />

(To be supported by flow sheet and/or water balance<br />

sheet)<br />

Part B: Waste Water Aspects<br />

13. Water consumption for different users (Iitreslday)<br />

(a) Domestic<br />

purpose<br />

(b) Industrial cooling or boiler feeds<br />

(c) Processing whereby water get polluted and the<br />

pollutants are easily biodegradable.<br />

(d) Processing whereby water gets polluted and the<br />

pollutants are not easily biodegradable and are<br />

toxic.<br />

(e) Service water, Gardening etc.<br />

: Refer water balance diagram<br />

~<br />

111.856 KL/day (494 m'/hr)<br />

5.880 KL/day (245 m'/hr)<br />

[N.A.<br />

[ 120 KL /day (5 m'/hr)<br />

Total: 17,856 Kilo-litre/day (744 m%r)<br />

14. Source of water supply.<br />

(a) Municipal Authority<br />

(b) Ground Water<br />

Treated sewage from Okhla STP of DJB<br />

18000 KUday process water from STP<br />

7.0 KUday potable water<br />

Nil<br />

15. Quantity of waste (effluent) generated<br />

(i) Domestic (sewage)<br />

(ii) IndustriallTrade Effluent<br />

(a) Cooling Tower Blowdown<br />

(b) Power Cycle Blow down<br />

Nil<br />

5,400 KUday (225 m31hr)<br />

480 KUday (20 m31hr)<br />

(g) TotallndustriallTrade<br />

Effluent<br />

5880 KUDay (245 m31hr)<br />

16. Present treatment of trade effluent (Give sizes<br />

/capacities of treatment units). (A schematic diagram<br />

of the treatment scheme with inleUoutlet<br />

characteristics of each unit operation/process is to<br />

be provided. Include details of residue management<br />

systems (ETP sludges)<br />

17. Mode of disposal of treated effluents, with<br />

Respective quantity, Litres/Day<br />

i. Into public sewer/open drainlland for irrigation/<br />

inland surface water.<br />

ii. Quantity of treated effluent reused/Recyded,<br />

(Iitres/day)<br />

iii. Provide a location map of disposal Arrangement<br />

clearly indicating the outlet(s) for sampling<br />

18. (a) Quality of Untreatedltreated effluents (Specify<br />

pH, SS, BOD and specific pollutant relevant to<br />

The proposed treatment<br />

details for proposed unit is<br />

giyen in chapter 4. pnge no.<br />

101-1m of REIA report.<br />

Around 20% of treated etlluent<br />

\yiH be recycled back in to<br />

system. 5% \yiH be used fix<br />

green belt deye1opment and<br />

remaining \yiH be discharge in<br />

to riyer Yamuna through near<br />

by drain after appropriate<br />

treatment.<br />

Quality of treated eft1uent shaH<br />

be \\ithin prescribed limit<br />

3<br />

....


~<br />

j",<br />

the industry. Refer Schedule-I for industry<br />

specific standards and Schedule-VI for General<br />

effluent standards of Environment Protection<br />

Rules, 1986, as amended to date)<br />

(b) Enclose a copy of the latest report of Analysis<br />

from the laboratory approved by <strong>Delhi</strong> <strong>Pollution</strong><br />

<strong>Control</strong> <strong>Committee</strong> for proposed unit furnish<br />

expected characteristics of the Untreatedltreated<br />

effluent.<br />

Within stipulated limit jJrescribed<br />

by MoEF/C<strong>PC</strong>BID<strong>PC</strong>C<br />

part - C: Air Emission Aspects<br />

19. Details of Stack (Process & Fuel Stacks)<br />

(a) Stack number(s)<br />

(b) Number of operational Stacks<br />

(b) Attached to<br />

(c) Capacity<br />

(d) Fuel Type<br />

(e) Fuel Quantity (Kg/hr or litlhr)<br />

(f) Materialof construction<br />

(g) Shape (round/rectangular)<br />

(h) Height, m (above ground level)<br />

(i) Height, m (above roof level)<br />

U>Sampling facilityprovided<br />

(k) Diameter/size, in meters<br />

(I)Gas Quantity, Nm3/hr.<br />

(m) Gas temperature, °c<br />

(n) Exitgas velocity, m/sec.<br />

(0) <strong>Control</strong> equipment<br />

:4<br />

:2<br />

: Heat Recovery Steam Generator (HRSG)<br />

: Natural GaslRe-gasified LNG<br />

: 1.86 MSCMD<br />

: steel<br />

: round<br />

: 70m<br />

: depends on HRSG design (to be furnished later)<br />

: Yes, continuous stack monitoring facilitywillbe<br />

installed<br />

:5m<br />

2x1150841Nm3/hr<br />

: 100<br />

: 20<br />

: Dry Low NOx(DLN)burners in Gas turbine<br />

combustion system.<br />

20. Details of D.G. Set(s) : One diesel generator set for emergency power has been envisaged.<br />

Further details shall be provided during detail engineering stage.<br />

stack Height Acoustic Month & Year<br />

Noise Noise<br />

Month & Stack Height above roof of the enclosure of instaUation<br />

s. Monitoring level<br />

Capacity Year of above Ground building where installed of acoustic<br />

No. report within the<br />

(in KVA) installation level D.G. Set<br />

(Yes/No)<br />

enclosure!<br />

submitted limit<br />

of D.G. Set (in meters) instaUed acoustic<br />

(in meters)<br />

treatment<br />

(Yes/No) (Yes/No)<br />

1. 1300KVA Along with - - Yes Before - Yes<br />

the proiect<br />

commissioning<br />

21. Quality of treated fuel gas emissions and process<br />

emissions (Enclose a copy of the latest report of<br />

analysis from the approved laboratory by <strong>Delhi</strong><br />

<strong>Pollution</strong> <strong>Control</strong> <strong>Committee</strong>. For proposed units<br />

furnish the expected characteristic of the emissions).<br />

These are proposed units. Oilly NOx<br />

wiH be emitted from proposed<br />

actiyity (lnd the concentration \yiH be<br />

\yith in prescribed limit.<br />

Part - D : Hazardous Waste Aspects<br />

22. (a) Whether the unit is generating hazardous waste as defined in the Hazardous Waste<br />

(Management and Handling) Rules, 1989, as amended.<br />

(b) Ifso, the category No.<br />

No hazardous<br />

\yaste generation<br />

4<br />

l


f<br />

I<br />

.<br />

I<br />

I!Iw.<br />

23. Quantity of hazardous waste generated (kgIdays) or (MT/month): N. A<br />

24. We further declare that the information furnished above is correct to the best of our knowledge.<br />

25. We hereby submit that in case of any change from what is stated in this application in respect of<br />

raw materials, products, process of manufacture and treatment and/or disposal of effluent,<br />

emissions, hazardous wasted etc. in quality and quantity; a fresh application for<br />

ConsenUAuthorization no change shall be made.<br />

26. We undertake to furnish any other information within one month of its being called by the<br />

<strong>Committee</strong>.<br />

27. We agree to submit to the <strong>Committee</strong> an application for renewal of consenUauthorization in two<br />

months in advance before the date of expiry of the consenUauthorization validity period.<br />

28. We hereby declare that the provisions of Master Plan of <strong>Delhi</strong> shall not be violated at any stage.<br />

29. We enclose herewith a Demand Draft No.021272 Dated-27.2.2006 Drawn on State Bank of India,<br />

Rajghat Power House, New <strong>Delhi</strong>-110002 for Rs.4400/- (Rupees four thousand four hundred<br />

only)Drawnin favour of <strong>Delhi</strong><strong>Pollution</strong><strong>Control</strong><strong>Committee</strong>asthe fee of consent.<br />

Yours faithfully,<br />

Dated..2~..<br />

................ 2..0 b<br />

Signature....~~~. ~~~. .'..<br />

Name: Rajinder Tiku<br />

Designation: DGM(YC),P<strong>PC</strong>L<br />

Documents enclosed: Proposed unit<br />

1. CertifioGtefrom Charted /\oOOl:mtaRt<br />

2. List of raw materials used, product manufactured and by-products<br />

generated during the process with maximum quantityper day.<br />

3. Manufacturing Process in Detail (included in EIA report)<br />

4. Layout Plan of the Unit( included in FR)<br />

5. Proof of CETP Membership (Attested by Gazetted Officer)<br />

6. Staok/Chimney monitoring report<br />

7. Effluent analycic report<br />

8. Noise Monitoring Report (included in the EIA report)<br />

9. Affidavit in the prescribed form:::!tmentioning dGte of Establishment of<br />

the Unit.<br />

10. Adequacy report of ETP<br />

11. Adequacy report of ECS<br />

12. Copy of MCDiLooal Body (Factory Lioenoe) duly attested by<br />

Gazetted offioer, 00 a proof of existenoe of the unit<br />

13. Copy of eleotrioity/power cupply canotion by <strong>Delhi</strong> Vidyut Board<br />

14. Copy of Water Supply sanction by <strong>Delhi</strong> Jal Board<br />

15.GtRers<br />

- Annex.-II<br />

- Annex.III<br />

I<br />

,<br />

I<br />

.<br />

Signature... ... ...%~~.~~~... .....<br />

Name: Rajinder Tiku<br />

Designation: DGM (IIC),P<strong>PC</strong>L<br />

5<br />

~<br />

-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!