28.01.2015 Views

Supplemental Agenda Items - FGUA

Supplemental Agenda Items - FGUA

Supplemental Agenda Items - FGUA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

supply wells and County Interconnect, located throughout the Aloha Gardens section<br />

of the utility. The wastewater treatment system allows mechanical screening and grit<br />

removal, and consists of:<br />

• A 500,000-gallong aerated influent equalization basin<br />

• Two 0.65 MGD treatment trains consisting of two aeration basins and three<br />

clarifiers<br />

• A 0.8 MGD treatment train consisting of four aeration basins and one clarifier<br />

• An intermediate pumping station<br />

• Traveling hood effluent filter<br />

• Existing sand filter consisting of seven 78.5-square-foot filter cells<br />

• Two baffled chlorine contact chambers with a combined volume of 95,504 gallons<br />

• Three aerated sludge holding tanks, each with a total volume of 128,000 gallons<br />

• More than 2.3 million gallons of reject effluent storage in a lined pond<br />

• A 5-acre on-site reclaimed water storage pond with a volume of 17.1 million<br />

gallons<br />

North Fort Myers Utility System – Lee County<br />

Project: N/A<br />

Owner: Florida Governmental Utility Authority<br />

Owner Contact: Charles Sweat, (407) 629-6900<br />

Quality water is delivered to approximately 1,900 customers and is supplied through<br />

two raw water ground source wells and treated at the aeration/chlorination-type<br />

water facility. There is one water treatment plant, two potable water wells and 10<br />

groundwater monitoring wells within the facility.<br />

It services roughly 252 acres of the Pine Lake country club and Lake Fairways mobile<br />

home park.<br />

Also includes the Del Prado Wastewater System as well as a 3.5 MGD wastewater<br />

treatment plant providing advanced secondary wastewater treatment for public access<br />

reuse.<br />

Wastewater services are provided to 11,342 residential and 399 business customers<br />

along 385,000 linear feet of gravity pipelines and 307,000 linear feet of wastewater<br />

forcemain. System infrastructure includes 104 duplex pumps stations, 95,000 linear<br />

feet of reclaimed water forcemains, and one deep injection well.<br />

Team Proposal Florida Governmental Utility Authority<br />

63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!