Repair of Earthquake-Damaged Sewers – Guam<br />

Project: $6.4 million<br />

Owner: N/A<br />

Owner Contact: N/A.<br />

Designed sewer replacement and retrofit improvements for 10 miles of gravity sewer<br />

serving more than 1,000 single, duplex and quadplex units for a U.S. Navy Base in<br />

Guam.<br />

The work involved:<br />

• Replacement of numerous line reaches in the residential housing areas using 6-<br />

and 8-inch PVC pipe<br />

• Replacement of a 24-inch interceptor sewer, along with other major interceptors<br />

and sewers serving the wharves in the harbor area<br />

• Extensive road repair and restoration<br />

CPH completed the design on this major project in 90 days. The residential areas<br />

accounted for approximately 20,000 linear feet of pipe.<br />

CPH served as contractor quality control manager, overseeing construction and<br />

verifying that the project was built per plans and specifications.<br />

U.S. Water Services Corp.<br />

North Plantation Key 0.355 MGD Advanced Wastewater Treatment<br />

Plant - Islamorada<br />

Project: N/A<br />

Owner: Village of Islamorada<br />

Owner Contact: Myles Milander, 81500 Overseas Highway, Islamorada, FL 33036<br />

Provides contract operations and maintenance services on behalf of the Village of<br />

Islamorada. The treatment plant uses an advanced wastewater treatment process<br />

to achieve very low effluent discharges of various nutrients such as nitrogen and<br />

phosphorus.<br />

The treatment plant consists of two trains with equalization tanks followed by anoxic<br />

and aerobic treatment tanks as well as a membrane biological reactor that the<br />

operator adjusts daily to meet very stringent effluent limits. The operating permit for<br />

the facility requires treatment to advanced wastewater treatment standards of 5mg/1<br />

CBOD5, 5 mg/1 TSS, 3mg/1 Total Nitrogen and 1mg/1 Total Phosphorus.<br />

U.S. Water routinely achieves or surpasses effluent results for the AWT standards<br />

Team Proposal Florida Governmental Utility Authority<br />

59