Key Largo Wastewater Treatment District – Southern Forcemain Project<br />

Project: $3.9 million<br />

Owner: Key Largo Wastewater Treatment District<br />

Owner Contact: Chuck Fishburn, (305) 451-5105<br />

Included the design of collection Basin A by the use of a vacuum sewer collection<br />

system. Basin A consisted of 39,031 linear feet of PVC pipe ranging in size from 4 to<br />

10 inches. Basin A also had a vacuum pump station to serve Basins A and B.<br />

The contractor submitted a proposal to change all the piping within the slip-line portion<br />

of the project to HDPE. To maintain the inside diameter of the design calculations, the<br />

HDPE was upsized by one size over the PVC design. The pipeline size varies from 4 to<br />

18 inches along the U.S. corridor.<br />

The project did contain an innovative design element. An abandoned 30-inch water<br />

main existed within the U.S. 1 corridor. Key Largo was able to obtain the rights to<br />

utilize this pipe as their corridor for the forcemain, therefore no digging was involved in<br />

order to install it.<br />

Since this did not allow for “normal access,” it was decided to use fusible PVC for the<br />

line with the water main.<br />

The line used supports at intervals to keep the new line from rubbing on the old line<br />

much like a bore and jack. It was decided not to grout the line in place, and use the<br />

separation devices instead. The spacers also helped the pull-in process by reducing<br />

friction during installation.<br />

Utilizing the old water main (with the installation of a slip-line pipe) minimized the<br />

impact of construction on traffic within the U.S. 1 corridor.<br />

Key Largo Wastewater Treatment District – Collection System Basin A<br />

Project: $5.1 million<br />

Owner: Key Largo Wastewater Treatment District<br />

Owner Contact: Chuck Fishburn, (305) 451-5105<br />

Included the design of collection Basin A by the use of a vacuum sewer collection<br />

system. Basin A consisted of 39,031 lf of PVC pipe ranging in size from 4 to 10<br />

inches. Basin A also had a vacuum pump station to serve Basins A and B.<br />

CPH provided a preliminary report, which compared the use of gravity collection,<br />

low pressure systems and vacuum systems. The use of a vacuum system was<br />

recommended.<br />

Other items that were discussed included demand and service capability to residential<br />

and commercial areas, and minimizing disruption to the area.<br />

Team Proposal Florida Governmental Utility Authority<br />

57