• Tranquility Bay Sewers – Marathon, Fla.<br />
Provided subcontractor services for the installation of a 3,700-foot long<br />
sanitary sewer and 4,100-foot-long water line and wastewater treatment plant<br />
at Buccaneer Resort condominiums. To perform subaqueous operations, crews<br />
positioned dewatering pumps adjacent to the pipe trenches during low-tide<br />
periods, lowering the water table 2 to 3 feet to place the pipeline.<br />
• Pembroke Pump Station – Hallandale Beach, Fla.<br />
Included a new pump station to prevent flooding during excessive rainfall. Worked<br />
included an at at-grade precast panel pump station building, four 40 CFS pumps<br />
with 30-inch diameter expansion joints, backflow gates and butterfly valves, and<br />
an electrical distribution system and motor control center.<br />
• Bajamont Way Membrane Filtration Plant – Carmichael, Calif.<br />
Constructed 2,300 linear feet of 48-inch micro-tunneled, gravity flow pipelines<br />
beneath the American River to convey raw water from the Ranney collector wells<br />
to the new 17 MGD treatment plant. Caissons were installed on either side of<br />
the American River, using sectional slip-form. After each section cured, the areas<br />
inside the caissons were excavated, causing the caissons to sink.<br />