CPH Engineers<br />

Will serve as the engineer of record for the project, utilizing the team’s unique<br />

understanding of local conditions and relationships to ensure an implementable<br />

design. CPH team members will:<br />

• Provide full survey and environmental services for the route and treatment systems,<br />

which will be used as the design drawings base.<br />

• Provide permitting services and agency coordination services. Through extensive<br />

local experience, CPH is very familiar with the FDEP process for permitting vacuum<br />

sewerage systems in the Keys.<br />

• Utilize SewerCad, a computer modeling program for sewerage systems, to assist<br />

during the design phase. This will allow CPH to cost effectively design the forcemain<br />

to meet the conditions of flow while optimizing the forcemain size.<br />

• Will provide a complete design, including plan and profile drawings, of each pipe run.<br />

Will provide spreadsheet analysis of the system to determine overall vacuum and<br />

static and friction loss calculations.<br />

• Architectural and civil design of required vacuum pump stations. These pump<br />

stations will be architecturally designed so they blend in with the residential nature<br />

of the area.<br />