Supplemental Agenda Items - FGUA
Supplemental Agenda Items - FGUA
Supplemental Agenda Items - FGUA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2009. CPH was retained for design services and has provided a set of design plans for<br />
correcting deficiencies identified in the report.<br />
CPH has a working knowledge of<br />
the Islamorada system, and very<br />
specific and detailed information<br />
on the existing vacuum system.<br />
CPH also understands the unique<br />
soils and groundwater conditions<br />
in the area.<br />
Kiewit Infrastructure South Co.<br />
complements that work with its<br />
own extensive experience, and<br />
some creative thinking that provided special touches to projects.<br />
That happened in Carmichael, Calif., for a $19 million membrane filtration plant Kiewit<br />
built there. The membrane filtration building itself was designed to look just like<br />
another house in the neighborhood it was placed. In reality, however, it was sitting on<br />
a 2 million gallon CT tank. Wastewater facilities are needed, but they can always be<br />
blended in to not disrupt an already picturesque neighborhood.<br />
A fully owned subsidiary of Kiewit Corp., it has offices throughout Florida and the<br />
Southeast, building a local workforce with the expertise and experience to take on<br />
some of the largest local projects.<br />
Team Proposal Florida Governmental Utility Authority<br />
19