Item<br />
Florida Governmental Utility Authority<br />
Board <strong>Agenda</strong> Item<br />
Thursday, February 17, 2011<br />
SM 4 Approval of Amendment to the Design-Build Agreement for Waterway Estates<br />
Interconnect between <strong>FGUA</strong> and CDM Constructors, Inc.<br />
___________________________________________________________________________________<br />
Summary<br />
Provided for your review and consideration is an Amendment to the Design-Build Agreement For Waterway Estates<br />
Interconnect entered into between the Florida Governmental Utility Authority (<strong>FGUA</strong>) and CDM Constructors, Inc.,<br />
dated October 21, 2010. In accordance with the Design-Build Agreement, acceptance of the Guaranteed Maximum<br />
Price (GMP) by the <strong>FGUA</strong> Board “shall occur on or before February 17, 2011 in order for Design-Builder to meet the<br />
specified Substantial Completion Date…….” On January 18, 2011 the Design-Builder, CDM Constructors, Inc.<br />
submitted a GMP to <strong>FGUA</strong> which was well in excess of the funds budgeted for the project. Since this time, <strong>FGUA</strong><br />
staff and the Design-Builder have been actively negotiating in an attempt to reach a GMP acceptable to all parties.<br />
The Design-Builder is currently incorporating a number of value engineering alternatives into the project which<br />
hopefully will result in an acceptable GMP. In the event an acceptable GMP is not resolved by February 17, 2011 for<br />
Board approval, and negotiations are continuing, a contract amendment is required to amend the GMP (and<br />
issuance of the associated Notice to Proceed) approval date. Accordingly, we are recommending that the date for<br />
GMP acceptance be extended to March 17, 2011 (the next regularly scheduled Board meeting) with no change to<br />
the specified Substantial Completion Date. Staff has evaluated the project schedule and do not believe this will<br />
adversely affect the final completion date.<br />
Recommendation<br />
Staff recommends approval of the Amendment to the Design-Build Agreement for Waterway Estates Interconnect.<br />
Budget Impact<br />
NA<br />
Board Action<br />
Moved by: Seconded by: Action Taken: