WORK AUTHORIZATION NO. GSG LL.Ls<br />

to<br />

Management Services Agreement Between the<br />

Florida Governmental Utility Authority ("<strong>FGUA</strong>"),<br />

a legal entity and public body created by interlocal agreement pursuant to<br />

Section 163.01(7), Florida Statutes<br />

and<br />

Government Services Group, lnc. ("GSG")<br />

A. SUMMARY OF SERVICES TO BE RENDERED<br />

Government Services Group, lnc. (GSG) will provide all necessary inspection services for the<br />

MacDill AFB ISDC (lnitial System Deficiency Correction) project for the replacement of<br />

security locks at all <strong>FGUA</strong> assets, including, but not limited to WWTP and WTP entry doors,<br />

water towers, lift stations and backflow preventers to be completed by U.S. Water Services<br />

Corporation (USW) under Work Authorization USW 11-03.<br />

The compensation to GSG for inspection costs related to this ISDC project equates to 5% of<br />

the total project costs, which is consistent with the <strong>FGUA</strong> proposal to the Government for<br />

MacDill AFB, and consistent with the budgeted amounts.<br />

The inspection services to be provided by GSG shall include, but are not limited to:<br />

1-. VisualSite lnsPection<br />

2. Project Progress Meetings<br />

3. Work Site Documentation<br />

4. VerificationthatEquipment/MaterialsUsed.<br />

5. Verification of operation of installed locks and hardware<br />

6. Project Close-out Documentation<br />

B. PROJECT COST - MacDillAFB Ut¡l¡ty System<br />

Total Project Costs % for lnspection lnspection Cost<br />

$25,095 5o/o $1,255<br />

Total Lump Sum Amount $ 1'255<br />

This lump sum amount shall be paid in 4 equal monthly installments beginning in April<br />

2OIt. Payment of this amount is contingent upon the <strong>FGUA</strong> receiving payments from the<br />

Government as proposed for the construction of the designated ISDC projects.<br />

C. PROJECTSCHEDULE<br />

Mobilization<br />

Removal and replacement of all Padlocks<br />

Removal and replacement of Entry Door Locks<br />

Provide Backflow Preventer Locks and Chains<br />

March 1,2otl<br />

March LO,2OL1'<br />

April 1, 2OtL<br />

July 1, 2OLI<br />

work Authorizat¡on No. GSG 11-15 Page tof 2