Work Authorization No. USW 11-03<br />

to<br />

The Planning, Design and Construction Agreement between the<br />

Florida Governmental Utility Authotity ("<strong>FGUA</strong>"),<br />

A legal entity and public body created by interlocal agreement<br />

pursuant to Section l-63.01(7), Florida Statutes and<br />

U.S. Water Services Gorporation ("USW")<br />

A. SUMMARY OF SERVICES TO BE RENDERED<br />

Part of the <strong>FGUA</strong> commitment, as described within the original bid proposal to the Federal Government,<br />

is to ensure security of the <strong>FGUA</strong> assets with a lock changeout program commencing on March 1't,<br />

2otl. Current grounds have the Base wide common lock installed.<br />

USW will perform the following services under this work authorization:<br />

o Coordination of activities with existing base personnel<br />

US Water will coordinate the change-out of locks with AKIMA personnel and turnover all removed AKIMA<br />

property upon completion of this Work.<br />

o Removal and replacement of security locks<br />

The following work is included in the scope of this Work Authorization:<br />

o Provide new replacement, non-duplicate, 5 pin keyed padlocks on<br />

applicable assets, including, but not limited to water towers, lift stations,<br />

and backflow prevention devices (167 total).<br />

¡ Provide new keypad locks at WWTP and WTP entry Doors<br />

o Removal of all existing locks and door hardware associated with the above<br />

work, and turnover to AKIMA.<br />

B. PROJECT COST s22,335.00<br />

USW will perform the services listed above for a Lump Sum Fee of $22,335.00, which will be paid over<br />

a 4 month period beginning after project initiation. USW acknowledges that payment by the <strong>FGUA</strong> will<br />

be contingent upon receipt of transition period funding from the Federal Government.<br />

Breakdown of Services:<br />

Design & Layout (4%) $1,004.00<br />

Project lmplementation & Construction $21-,33t.OO<br />

C. PROJECT SCHEDULE<br />

Mobilization<br />

Removal and replacement of all Padlocks<br />

Removal and replacement of Walk Door Locks<br />

Provide Backflow Preventer Locks and Chains<br />

March t,zÙLt<br />

March tO,2O1-t<br />

April 1, 2Ùtt<br />

July 1, 2OtI