WORK AUTHORIZATION NO. GSG LL.L4<br />
to<br />
Management Services Agreement Between the<br />
Florida Governmental Utility Authority ("<strong>FGUA</strong>"),<br />
a legal entity and public body created by interlocal agreement pursuant to<br />
Section 163.01(7), Florida Statutes<br />
and<br />
Government Services Group, lnc. ("GSG")<br />
A. SUMMARY OF SERVICES TO BE RENDERED<br />
Government Services Group, lnc. (GSG) will provide all necessary inspection services for the<br />
MacDill AFB ISDC (lnitial System Deficiency Correction) project for WWTP Security to be<br />
completed by U.S. Water services Corporation under work authorization USW 11-02.<br />
The compensation to GSG for inspection costs related to this ISDC project equates to 5% of<br />
the total project costs, which is consistent with the <strong>FGUA</strong> proposal to the Government for<br />
MacDill AFB, and consistent with the budgeted amounts.<br />
The inspection services to be provided by GSG shall include, but are not limited to:<br />
t. Participation in preconstruction planning<br />
2. Drawing Review<br />
3. VisualSite lnspection<br />
4. Project Progress Meetings<br />
5. Verify that the contractor follows all safety standards as required by OSHA.<br />
6. Work Site Documentation<br />
7. Verification of Materials Used and Stored on Site<br />
8. Verification of Equipment-Materials Used is in Accordance with Approved Plans<br />
9. Witness all start-up and testing<br />
10. ProjectDocumentationClose-out<br />
B. PROJECT COST - MacDillAFB Ut¡l¡ty System<br />
Total Project Gosts % for lnspection lnspection Cost<br />
fi739,1-24 5o/o $6,956<br />
Total Lump Sum Amount $ 6,956<br />
This lump sum amount shall be paid in 4 equal monthly installments beginning in April<br />
2}tt. Payment of this amount is contingent upon the <strong>FGUA</strong> receiving payments from the<br />
Government as proposed for the construction of the designated ISDC projects.<br />
C. PROJECTSCHEDULE<br />
Design & Layout<br />
Mobilization<br />
Substantial Completion<br />
March 2OLI<br />
MaY 2Ott<br />
July 2Ot1'<br />
Work Authorizat¡on No. GSc 11-14 Page t of 2