WORK AUTHORIZATION NO. GSG LL.L4<br />

to<br />

Management Services Agreement Between the<br />

Florida Governmental Utility Authority ("<strong>FGUA</strong>"),<br />

a legal entity and public body created by interlocal agreement pursuant to<br />

Section 163.01(7), Florida Statutes<br />

and<br />

Government Services Group, lnc. ("GSG")<br />

A. SUMMARY OF SERVICES TO BE RENDERED<br />

Government Services Group, lnc. (GSG) will provide all necessary inspection services for the<br />

MacDill AFB ISDC (lnitial System Deficiency Correction) project for WWTP Security to be<br />

completed by U.S. Water services Corporation under work authorization USW 11-02.<br />

The compensation to GSG for inspection costs related to this ISDC project equates to 5% of<br />

the total project costs, which is consistent with the <strong>FGUA</strong> proposal to the Government for<br />

MacDill AFB, and consistent with the budgeted amounts.<br />

The inspection services to be provided by GSG shall include, but are not limited to:<br />

t. Participation in preconstruction planning<br />

2. Drawing Review<br />

3. VisualSite lnspection<br />

4. Project Progress Meetings<br />

5. Verify that the contractor follows all safety standards as required by OSHA.<br />

6. Work Site Documentation<br />

7. Verification of Materials Used and Stored on Site<br />

8. Verification of Equipment-Materials Used is in Accordance with Approved Plans<br />

9. Witness all start-up and testing<br />

10. ProjectDocumentationClose-out<br />

B. PROJECT COST - MacDillAFB Ut¡l¡ty System<br />

Total Project Gosts % for lnspection lnspection Cost<br />

fi739,1-24 5o/o $6,956<br />

Total Lump Sum Amount $ 6,956<br />

This lump sum amount shall be paid in 4 equal monthly installments beginning in April<br />

2}tt. Payment of this amount is contingent upon the <strong>FGUA</strong> receiving payments from the<br />

Government as proposed for the construction of the designated ISDC projects.<br />

C. PROJECTSCHEDULE<br />

Design & Layout<br />

Mobilization<br />

Substantial Completion<br />

March 2OLI<br />

MaY 2Ott<br />

July 2Ot1'<br />

Work Authorizat¡on No. GSc 11-14 Page t of 2