Work Authorization No. USW 11-02<br />
to<br />
A Professional Services Agreement between the<br />
Florida Governmental Utility Authority ("<strong>FGUA</strong>")<br />
A legal entity and public body created by interlocal agreement<br />
pursuant to Section 163.01(7), Florida Statutes<br />
and<br />
U.S. Water Services Corporation (“USW”)<br />
A. SUMMARY OF SERVICES TO BE RENDERED<br />
Part of the <strong>FGUA</strong> commitment, as described within the original bid proposal to the Federal Government,<br />
is to install Closed-circuit Television (CCTV) Surveillance and WWTP Grounds Security. The WWTP<br />
grounds currently have unrestricted access and do not provide the type of Security needed to ensure<br />
proper operation of the utility. During the transition period, both US Water and PBS&J have identified<br />
the need for tighter security in this area as a deficiency. In addition, AFB officials at MacDill recognize<br />
the need for this project. USW intends to begin work on this project immediately upon the start of<br />
operations at MacDill.<br />
US Water Services Corporation will perform the following services under this work authorization:<br />
• Coordination of activities with existing base personnel<br />
AFB officials have designated and approved property allocation south of the intersection of Bayshore<br />
Blvd and service driveway for Building 717, commonly known as the WWTP grounds. US Water has<br />
submitted a preliminary layout to the Facilities Utilization Board (FUB) for approval, where at this time it<br />
is being verbally approved and supported by 6CES Management. It is anticipated that the FUB will grant<br />
approval on Feb 18, 2011. This project is not subject to the Base Design/Review process, but it is<br />
understood that all visible structures must conform to the current MacDill Design Guide. US Water shall<br />
secure all required approvals.<br />
• Development of Design and Layout<br />
All design and layout of the CCTV Network, Automatic Gate installation and Security Fencing will be<br />
completed by USW and shall be compatible with existing AFB system.<br />
• F&I of Automated Gate, Fencing and CCTV network<br />
F&I of new automated security fence & gate across entry to property will be included thereby<br />
securing the entire area allocated to the WWTP in the asset transfer. The project will include: 6' high<br />
9-gauge vinyl coated chain link fence & gate, CCTV observation camera and keypad entry, asphalt<br />
modifications to accommodate new driveway entry. The following items are included in the cost<br />
proposal for this project:<br />
Electric Service Upgrades<br />
Sitework (ALL)<br />
Pavement & Subgrade Prep & Replacement<br />
7 - CCTV Cameras / Weather Proof Housing<br />
8 - Channel DVR - Sequencer<br />
CCTV Monitor