Work Authorization No. USW 11-02<br />

to<br />

A Professional Services Agreement between the<br />

Florida Governmental Utility Authority ("<strong>FGUA</strong>")<br />

A legal entity and public body created by interlocal agreement<br />

pursuant to Section 163.01(7), Florida Statutes<br />

and<br />

U.S. Water Services Corporation (“USW”)<br />

A. SUMMARY OF SERVICES TO BE RENDERED<br />

Part of the <strong>FGUA</strong> commitment, as described within the original bid proposal to the Federal Government,<br />

is to install Closed-circuit Television (CCTV) Surveillance and WWTP Grounds Security. The WWTP<br />

grounds currently have unrestricted access and do not provide the type of Security needed to ensure<br />

proper operation of the utility. During the transition period, both US Water and PBS&J have identified<br />

the need for tighter security in this area as a deficiency. In addition, AFB officials at MacDill recognize<br />

the need for this project. USW intends to begin work on this project immediately upon the start of<br />

operations at MacDill.<br />

US Water Services Corporation will perform the following services under this work authorization:<br />

• Coordination of activities with existing base personnel<br />

AFB officials have designated and approved property allocation south of the intersection of Bayshore<br />

Blvd and service driveway for Building 717, commonly known as the WWTP grounds. US Water has<br />

submitted a preliminary layout to the Facilities Utilization Board (FUB) for approval, where at this time it<br />

is being verbally approved and supported by 6CES Management. It is anticipated that the FUB will grant<br />

approval on Feb 18, 2011. This project is not subject to the Base Design/Review process, but it is<br />

understood that all visible structures must conform to the current MacDill Design Guide. US Water shall<br />

secure all required approvals.<br />

• Development of Design and Layout<br />

All design and layout of the CCTV Network, Automatic Gate installation and Security Fencing will be<br />

completed by USW and shall be compatible with existing AFB system.<br />

• F&I of Automated Gate, Fencing and CCTV network<br />

F&I of new automated security fence & gate across entry to property will be included thereby<br />

securing the entire area allocated to the WWTP in the asset transfer. The project will include: 6' high<br />

9-gauge vinyl coated chain link fence & gate, CCTV observation camera and keypad entry, asphalt<br />

modifications to accommodate new driveway entry. The following items are included in the cost<br />

proposal for this project:<br />

Electric Service Upgrades<br />

Sitework (ALL)<br />

Pavement & Subgrade Prep & Replacement<br />

7 - CCTV Cameras / Weather Proof Housing<br />

8 - Channel DVR - Sequencer<br />

CCTV Monitor