28.01.2015 Views

Supplemental Agenda Items - FGUA

Supplemental Agenda Items - FGUA

Supplemental Agenda Items - FGUA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Item<br />

Florida Governmental Utility Authority<br />

Board <strong>Agenda</strong> Item<br />

Thursday, February 17, 2011<br />

SM1f Approval of Work Authorization USW 11-02 with U.S. Water Services Corporation<br />

regarding MacDill AFB ISDC Project for WWTP Security<br />

___________________________________________________________________________________<br />

Summary<br />

Please find attached work authorization USW 11-02 with U.S. Water Services Corporation regarding the MacDill AFB<br />

ISDC (Initial System Deficiency Correction) project for WWTP Security. This ISDC project is included in the amended<br />

<strong>FGUA</strong> proposal for the MacDill AFB Utility System and essentially involves the installation of CCTV Surveillance and<br />

Security devices at the WWTP and grounds. The current WWTP grounds have unrestricted access and do not provide<br />

the type of security needed to ensure secure operation of the utility system. Both US Water and Post Buckley<br />

identified the need for tighter security in this area as part of the due diligence efforts during the transition period.<br />

The proposed ISDC project schedule contemplates initiating work on this project immediately upon the start of<br />

operations at MacDill. US Water Services Corporation will perform the following services under this work<br />

authorization:<br />

• Coordination of activities with existing base personnel<br />

• Development of Design and Layout<br />

• F&I of Automated Gate, Fencing and CCTV network<br />

• Electric Service Upgrades<br />

• Site work (ALL)<br />

• Pavement & Subgrade Prep & Replacement<br />

• 7 - CCTV Cameras / Weather Proof Housing<br />

• 8 - Channel DVR - Sequencer<br />

• CCTV Monitor<br />

• CCTV Wire and Cable / Conduit (est 2300' total)<br />

• CCTV Conduit & Wire Installation<br />

• F&I 20' Slide Gate<br />

• F&I Automatic Gate Operator, Mounting Base, SS Chain & Loop Detectors<br />

• F&I Keypad & Key Card Entry with Voice Call Box to Plant Office<br />

• Existing Security Fence/ Gate Modifications<br />

• New Security Fence/ Gate Installation<br />

• 40' Slide Gate Track Concrete Work (elevated east side of track)<br />

• Decorative Entrance Wall<br />

• System start-up and testing<br />

The costs and scheduling associated with this work authorization are included in the pricing proposal submitted to<br />

the Government which is anticipated to be included in the final contract amendment. The total lump sum<br />

compensation to U.S. Water under this work authorization is $123,820.<br />

Recommendation<br />

Staff recommends approval of work authorization USW 11-02 regarding MacDill AFB ISDC Project for<br />

WWTP Security<br />

Board Action<br />

Moved by: Seconded by: Action Taken

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!