EPRI Proprietary Licensed Material<br />
3<br />
T&D SYSTEM ENERGY STORAGE SYSTEM<br />
APPLICATIONS<br />
This section addresses the following T&D applications <strong>f<strong>or</strong></strong> which NAS batteries are particularly<br />
well suited:<br />
• Load leveling, typically 3 to 8 hours<br />
• Power quality protection, 30 seconds and up to hours <strong>f<strong>or</strong></strong> power disturbance mitigation<br />
• Automatic generation control (AGC), control power interchange and frequency management<br />
<strong>f<strong>or</strong></strong> events up to one hour<br />
• Wind generation stabilization <strong>f<strong>or</strong></strong> hours <strong>of</strong> firm power delivery<br />
Representative applications are described in m<strong>or</strong>e detail in Section 3.1, top-level energy st<strong>or</strong>age<br />
system requirements <strong>f<strong>or</strong></strong> these applications are provided Section 3.2, and NAS battery<br />
per<strong>f<strong>or</strong></strong>mance with respect to requirements is characterized in Section 3.3. It should be noted that<br />
the functional attributes <strong>of</strong> the PCS, including the grid interface, are imp<strong>or</strong>tant elements <strong>of</strong> both<br />
cost and per<strong>f<strong>or</strong></strong>mance. It should also be noted that <strong>com</strong>bining functional requirements where<br />
appropriate leads to improved economics. Examples <strong>of</strong> the economics <strong>of</strong> <strong>com</strong>bined function<br />
applications are addressed in Section 4, and include load leveling <strong>com</strong>bined with AGC and<br />
power quality mitigation <strong>com</strong>bined with peak shaving.<br />
3.1 <strong>Energy</strong> <strong>St<strong>or</strong>age</strong> System Descriptions<br />
The following T&D system energy st<strong>or</strong>age applications are representative <strong>of</strong> the primary<br />
functions listed above. Specific sizes have been selected <strong>f<strong>or</strong></strong> the convenience <strong>of</strong> NAS battery<br />
system arrangements and to facilitate <strong>com</strong>parisons.<br />
1. 10MW distribution substation installation <strong>f<strong>or</strong></strong> ~8 hr load leveling (utilizing 200 NAS<br />
PS Modules): Strategically located energy st<strong>or</strong>age systems <strong>f<strong>or</strong></strong> load leveling are<br />
deployed to avoid <strong>or</strong> defer T&D system upgrades in locations constrained by access <strong>or</strong> by<br />
the admissibility <strong>of</strong> generation options. In most instances, this application does not<br />
require rapid response. That is, scheduled startup over a few minute interval is adequate,<br />
and such configurations avoid the expense <strong>of</strong> grid-interactive 2 power electronics and the<br />
2<br />
F<strong>or</strong> the purposes <strong>of</strong> this document, the term “grid interactive” describes a continuously connected, inverter-based<br />
power conversion system capable <strong>of</strong> providing immediate voltage and frequency supp<strong>or</strong>t to the grid, as well as<br />
power disturbance mitigation, to the extent <strong>of</strong> st<strong>or</strong>ed energy.<br />
3-1