EPRI Proprietary Licensed Material<br />

Regenesys Electricity <strong>St<strong>or</strong>age</strong> Technology<br />

inactive, the Regenesys system could be brought to a state <strong>of</strong> charge that would make up <strong>f<strong>or</strong></strong> an<br />

inefficiencies and imbalances in energy charged and discharged.<br />

A Regenesys energy st<strong>or</strong>age system would be particularly suited to the area/frequency regulation<br />

application because <strong>of</strong> the high cyclability (capability to be charged and discharged at all states<br />

<strong>of</strong> charge without degradation) and the long expected life under the conditions expected.<br />

<strong>Transmission</strong> Customer Power Quality, Power Reliability<br />

A variety <strong>of</strong> loads--ranging from modest industrial installations to substations <strong>of</strong> significant<br />

capacity--require energy to provide power quality and backup power. This energy is used <strong>f<strong>or</strong></strong> a<br />

variety <strong>of</strong> conditions such as when momentary disturbances require real power injection to avoid<br />

power interruptions. In the case <strong>of</strong> industrial customers, a local source <strong>of</strong> power may be required<br />

when there is an interruption <strong>of</strong> power from the utility. This power source may function until the<br />

power feed from the utility is rest<strong>or</strong>ed, until a reserve generat<strong>or</strong> is started, <strong>or</strong> until critical loads<br />

are shut down in a safe manner. In the case <strong>of</strong> a substation, a variety <strong>of</strong> momentary disturbances<br />

such as lightning strikes <strong>or</strong> transmission flashovers cause power trips <strong>or</strong> low voltages. The total<br />

energy st<strong>or</strong>age requirement is greater and there may be a need power flow separation to insure<br />

continuous power to imp<strong>or</strong>tant customers.<br />

Costs and Benefits<br />

Projected Costs<br />

In Table 2, we show projections <strong>f<strong>or</strong></strong> the costs <strong>f<strong>or</strong></strong> Regenesys energy st<strong>or</strong>age plants at two levels<br />

<strong>or</strong> production: a first <strong>com</strong>mercial plant (i.e., the plant after the one <strong>f<strong>or</strong></strong> TVA) and full<br />

implementation (say the 30 th plant sold with sales <strong>of</strong> 10 plants per year). The costs shown, which<br />

are Symons/EECI projections based on values obtained from Innogy publications <strong>or</strong> from Innogy<br />

personnel, relate to a plant with a nominal power capability <strong>of</strong> 10MW and an energy st<strong>or</strong>age<br />

capacity <strong>f<strong>or</strong></strong> a 10-hour discharge <strong>of</strong> 100MWh.<br />

The columns headed $/kWh and $/kW in Table 2 relate to the p<strong>or</strong>tions <strong>of</strong> the total cost that can<br />

be attributed to energy capacity and power capability, respectively. Thus, to estimate the cost <strong>of</strong><br />