EPRI Proprietary Licensed Material<br />

Regenesys Electricity <strong>St<strong>or</strong>age</strong> Technology<br />

Table 1<br />

T&D Applications Chosen <strong>f<strong>or</strong></strong> Detailed Analysis <strong>f<strong>or</strong></strong> Regenesys Technology<br />

(See notes after table)<br />

Application<br />

1. <strong>Transmission</strong><br />

Deferral/Supp<strong>or</strong>t<br />

2. Area <strong>or</strong><br />

Frequency<br />

Regulation<br />

Size<br />

MW<br />

Duration<br />

Hours<br />

Plant<br />

MWh<br />

Response<br />

Time<br />

Duty<br />

Cycle<br />

10 10 100 Seconds 20-200<br />

per year<br />

10 0.25 N/A 100 ms Continuous<br />

in daytime<br />

Roundtrip<br />

Efficiency<br />

Plant<br />

Footprint<br />

60-65% 2.5 acres<br />

60-65% N/A<br />

3. <strong>Transmission</strong><br />

Customer PQ<br />

10 1-2 N/A 100 ms 6 per year 60-65% N/A<br />

Notes <strong>f<strong>or</strong></strong> Table 1:<br />

a. T&D Deferral/Supp<strong>or</strong>t, with Peak Shaving is regarded as the primary application <strong>of</strong> a<br />

Regenesys ES plant and as such sizes the reference plant 100MWh/10MW.<br />

b. Provision <strong>of</strong> Area Regulation and Spinning Reserve is regarded as a secondary<br />

application <strong>f<strong>or</strong></strong> a Regenesys plant installed to meet the requirements <strong>of</strong> the primary<br />

application.<br />

c. Power Quality, <strong>or</strong> improved reliability, <strong>f<strong>or</strong></strong> sub-transmission customers, is regarded as an<br />

alternative <strong>or</strong> additional secondary application <strong>f<strong>or</strong></strong> a Regenesys plant installed primarily<br />

<strong>f<strong>or</strong></strong> the T&D Deferral/Supp<strong>or</strong>t, with Peak Shaving, application .<br />

In the transmission deferral/supp<strong>or</strong>t application, the Regenesys battery would be dispatched from<br />

20 to 200 times per year, depending on how close to the limits <strong>of</strong> the line <strong>or</strong> trans<strong>f<strong>or</strong></strong>mer the<br />

system is being operated, and the local load requirements. When dispatched, the Regenesys<br />

plant could be discharged <strong>f<strong>or</strong></strong> up to ten hours, since there are times when the peaks on<br />

transmission facilities last <strong>f<strong>or</strong></strong> this long. Use <strong>of</strong> the Regenesys plant in this way could also<br />

potentially increase netw<strong>or</strong>k efficiency.<br />

The transmission deferral/supp<strong>or</strong>t use could be particularly attractive <strong>f<strong>or</strong></strong> Regenesys application<br />

because <strong>of</strong> the low costs ($/kWh – see Cost section) <strong>f<strong>or</strong></strong> energy capacity and because <strong>of</strong> the long<br />

expected life <strong>f<strong>or</strong></strong> the system.<br />