EPRI Proprietary Licensed Material Table 5 VRB Capital and O&M Costs Application Size Plant Capacity Capital Cost – Power Related ($/kW) Capital Cost – Energy Related ($/kWh) Total Capital Cost ($) O&M Cost – Fixed ($/kW-yr) O&M Cost – Variable ($/kWh) DR/Peak Shaving Prototype 2260 550 4.5M 12.0 0.029 FOAK 1 MW 4 MWh 700 230 1.6M 4.0 0.029 NOAK 500 150 1.1M 2.0 0.029 Spinning Reserve Prototype 2150 1050 42.5M 1.2 0.029 FOAK 10 MW 20 MWh 608 410 14.3M 0.4 0.029 NOAK 426 250 9.3M 0.2 0.029 Windfarm Stabilization & Dispatch Prototype 2150 300 45.5M 1.2 0.029 FOAK 10 MW 80 MWh 608 140 17.3M 0.4 0.029 NOAK 426 100 12.3M 0.2 0.029 Vanadium Redox Battery 30
EPRI Proprietary Licensed Material 4.3. Benefits All benefits calculations were performed by a spreadsheet using discounted cash flows to determine the NPV. The analysis used EPRI-provided economics assumptions, including a real discount rate of 5% and annual inflation of 2%. In addition, all escalation is assumed to be 2%. DR/Peak Shaving Benefits include capital investment deferral and substation O&M deferral. The analysis assumes that each year, one substation capital project is deferred. During peak generation days, the system is used to provide peak generation support as well (charging with off-peak energy, accounting for system losses, and discharging during the on-peak period). The assumptions are given in Table 6. Table 6 DR/Peak Shaving Assumptions Utility Avg Substation Capital Cost 2,000,000 $ Substation O&M cost 25,000 $/sub/yr Power - Peak 80 $/MWh Power - Off Peak 20 $/MWh Peak days 60 days/yr Discount rate (real) 5 % VRB System Size 1 MW Energy Storage 4 h Efficiency 0.70 Cycle life 1500 cycles Max life 20 years Total NPV of the benefits over the 20-year study period is calculated as $1.5M. Spinning Reserve Spinning reserve benefits include (1) contract revenues from the open ancillary services market and (2) the generation benefits from discharging energy during the spinning reserve events. Table 7 shows the input assumptions. Vanadium Redox Battery 31
- Page 1: Handbook of Energy Storage for Tran
- Page 4 and 5: DISCLAIMER OF WARRANTIES AND LIMITA
- Page 7: EPRI Proprietary Licensed Material
- Page 10 and 11: Vanadium Redox Battery 2
- Page 12 and 13: EPRI Proprietary Licensed Material
- Page 14 and 15: EPRI Proprietary Licensed Material
- Page 16 and 17: EPRI Proprietary Licensed Material
- Page 18 and 19: EPRI Proprietary Licensed Material
- Page 20 and 21: EPRI Proprietary Licensed Material
- Page 22 and 23: EPRI Proprietary Licensed Material
- Page 24 and 25: EPRI Proprietary Licensed Material
- Page 26 and 27: EPRI Proprietary Licensed Material
- Page 28 and 29: EPRI Proprietary Licensed Material
- Page 30 and 31: EPRI Proprietary Licensed Material
- Page 32 and 33: EPRI Proprietary Licensed Material
- Page 34 and 35: EPRI Proprietary Licensed Material
- Page 36 and 37: EPRI Proprietary Licensed Material
- Page 40 and 41: EPRI Proprietary Licensed Material
- Page 42 and 43: EPRI Proprietary Licensed Material
- Page 45 and 46: EPRI Proprietary Licensed Material
- Page 47 and 48: EPRI Proprietary Licensed Material
- Page 49 and 50: EPRI Proprietary Licensed Material
- Page 51 and 52: EPRI Proprietary Licensed Material
- Page 53 and 54: Regenesys Electricity Storage Techn
- Page 55 and 56: EPRI Proprietary Licensed Material
- Page 57 and 58: Regenesys Electricity Storage Techn
- Page 59 and 60: EPRI Proprietary Licensed Material
- Page 61 and 62: EPRI Proprietary Licensed Material
- Page 63 and 64: EPRI Proprietary Licensed Material
- Page 65 and 66: Regenesys Electricity Storage Techn
- Page 67 and 68: EPRI Proprietary Licensed Material
- Page 69 and 70: EPRI Proprietary Licensed Material
- Page 71 and 72: EPRI Proprietary Licensed Material
- Page 73: EPRI Proprietary Licensed Material
- Page 76 and 77: EPRI Proprietary Licensed Material
- Page 78 and 79: EPRI Proprietary Licensed Material
- Page 80 and 81: EPRI Proprietary Licensed Material
- Page 82 and 83: EPRI Proprietary Licensed Material
- Page 84 and 85: EPRI Proprietary Licensed Material
- Page 86 and 87: The status of sodium sulfur batteri
EPRI Proprietary Licensed Material<br />
Table 5<br />
VRB Capital and O&M Costs<br />
Application Size Plant<br />
Capacity<br />
Capital Cost<br />
– Power<br />
Related<br />
($/kW)<br />
Capital Cost<br />
– <strong>Energy</strong><br />
Related<br />
($/kWh)<br />
Total Capital<br />
Cost<br />
($)<br />
O&M Cost –<br />
Fixed<br />
($/kW-yr)<br />
O&M Cost –<br />
Variable<br />
($/kWh)<br />
DR/Peak<br />
Shaving<br />
Prototype 2260 550 4.5M 12.0 0.029<br />
FOAK 1 MW 4 MWh 700 230 1.6M 4.0 0.029<br />
NOAK<br />
500 150 1.1M 2.0 0.029<br />
Spinning<br />
Reserve<br />
Prototype 2150 1050 42.5M 1.2 0.029<br />
FOAK 10 MW 20 MWh 608 410 14.3M 0.4 0.029<br />
NOAK<br />
426 250 9.3M 0.2 0.029<br />
Windfarm<br />
Stabilization<br />
& Dispatch<br />
Prototype 2150 300 45.5M 1.2 0.029<br />
FOAK 10 MW 80 MWh 608 140 17.3M 0.4 0.029<br />
NOAK<br />
426 100 12.3M 0.2 0.029<br />
Vanadium Redox Battery 30