EPRI Proprietary Licensed Material<br />

Table 13<br />

Benefits Summary (NPV Of Using The CAES Plant Developed F<strong>or</strong> Each Application In<br />

Table 10 F<strong>or</strong> The Five Situations Shown Across The Top)<br />

Original T&D<br />

Application<br />

<strong>of</strong> Plant<br />

Deferral <strong>of</strong><br />

T&D<br />

Construction<br />

Peak Shaving<br />

Situation<br />

Avoided Load<br />

Shedding<br />

Arbitrage<br />

Spinning<br />

Reserve<br />

Credit<br />

Reactive<br />

Power<br />

Supply (VAR<br />

Supp<strong>or</strong>t)<br />

Peak<br />

Shaving<br />

<strong>Energy</strong><br />

Imbalance<br />

(Area<br />

Control)<br />

Spinning<br />

Reserve<br />

Supplemental<br />

Reserve<br />

Price<br />

Hedging<br />

(Arbitrage)<br />

$72M n/a n/a n/a n/a<br />

n/a $7M $38M n/a n/a<br />

n/a n/a n/a n/a $42M<br />

n/a n/a n/a n/a $41M<br />

n/a n/a n/a n/a $42M<br />

$120M n/a n/a $580M $42M<br />

The following five cases are considered:<br />

• T&D Deferral – The baseline is <strong>f<strong>or</strong></strong> the utility to construct new T&D facilities during the first<br />

year. The CAES alternatives are <strong>f<strong>or</strong></strong> the utility to use the CAES plants delineated in Table<br />

10 to defer the construction <strong>of</strong> T&D <strong>f<strong>or</strong></strong> ten years. The cost <strong>of</strong> constructing the new T&D<br />

facilities in ten years is included as part <strong>of</strong> the CAES situation, but the economic value <strong>of</strong> the<br />

CAES plant beyond ten years is neglected. A benefit to the utility is achieved if the CAES<br />

plant has a lower net present value than the T&D construction.<br />

• Peak Shaving – The baseline is <strong>f<strong>or</strong></strong> the utility to construct a new simple-cycle <strong>com</strong>bustion<br />

turbine power plant during the first year to meet the demand. The CAES alternatives are to<br />

provide the power required with the CAES plants defined in Table 10. A benefit is achieved<br />

if the CAES plant has a lower net present value than the <strong>com</strong>bustion turbine power plant<br />

construction.<br />

• Load Shedding – The baseline is <strong>f<strong>or</strong></strong> the utility to do nothing to avoid lost sales due to load<br />

shedding. The CAES alternatives are to provide the power required to avoid load shedding<br />