EPRI Proprietary Licensed Material<br />

This site was selected so that power from the flywheel equipment may be utilized to<br />

supp<strong>or</strong>t per<strong>f<strong>or</strong></strong>mance testing <strong>of</strong> new technology trains on the test track. Testing requires a<br />

stable track voltage, which has not been available at this site. As shown in Figure 16<br />

average voltage is approximately 672 Vdc at light load, however excursions well above<br />

and below this level are were <strong>com</strong>mon during train operations. The existing substation<br />

spacing along the Far Rockaway Line at Broad Channel makes the voltage requirements<br />

<strong>f<strong>or</strong></strong> per<strong>f<strong>or</strong></strong>mance testing (600V maintained) difficult to meet.<br />

Figure 16<br />

Typical Voltage Pr<strong>of</strong>ile At The Far Rockaway Test Track In October 2001<br />

The prototype installation consists <strong>of</strong> ten individual high-speed flywheels <strong>of</strong> 100-kw<br />

each, connected together to provide one-megawatt capacity, see photo in Figure 17.<br />

Together the flywheels st<strong>or</strong>e about 5 kWh in kinetic energy and could be expected to<br />

operate as <strong>of</strong>ten as every 2 minutes during peak hours, and average about every 6 minutes<br />

during n<strong>or</strong>mal operating hours. A <strong>com</strong>plete cycle <strong>of</strong> the flywheels consist <strong>of</strong> a 20 second<br />

discharge triggered by reduced voltage during train accelerations and a recharge at<br />

approximately the same rate if trains are regeneratively braking in the vicinity.<br />

Otherwise the recharge is controlled based on track voltage during the several minutes<br />

between trains.<br />

Figure 17<br />

Flywheel Installation At NYCT Bay Equalizer Location, 10 1-MW Units In New Building<br />

Flywheels Page 31