A Freight Plan for the NYMTC Region<br />
7.0 Financing<br />
The NYMTC region faces significant capital financing needs for <strong>freight</strong>. Historically, it<br />
was believed that the private sector, which operates most <strong>freight</strong> services, would take care<br />
of these needs, driven by profit and the need to expand. Now, <strong>freight</strong> needs have come to<br />
be considered as societal needs as well due to the externalities generated by <strong>freight</strong><br />
movement. These externalities include congestion, air pollution, community impacts, and<br />
wear and tear on the infrastructure. In addition, in the NYMTC region, unlike in many<br />
areas, much of the rail <strong>freight</strong> infrastructure is publicly owned but privately operated. For<br />
these reasons, various levels of government have proposed or implemented projects and<br />
programs to address <strong>freight</strong> needs. Governments at the Federal, state, and local levels<br />
have made limited funding available for some categories of <strong>freight</strong> projects.<br />
The purpose of this section of the <strong>freight</strong> <strong>plan</strong> is to:<br />
• Describe the financial needs of <strong>freight</strong> movement in the NYMTC region;<br />
• Examine issues relating to finance;<br />
• Summarize funding sources; and<br />
• Discuss follow up activities.<br />
• 7.1 Financial Needs<br />
The NYMTC Regional <strong>Transportation</strong> Plan specifies transportation capital funding needs<br />
broken down by state of good repair, normal replacement, and capacity expansion. The<br />
Plan identifies $143 billion in projects during the years 2000 through 2025, versus a likely<br />
funding allocation of $150 billion from all Federal, state, and local sources. Because under<br />
Federal regulations <strong>regional</strong> <strong>plan</strong>s must be financially constrained, the Program of Projects<br />
is driven by an estimate of available funding, and not by an estimate of need. The transportation<br />
needs of the region far exceed available funding. This relationship of projects,<br />
funding, and needs is shown in Figure 7.1.<br />
Based on the limited cost estimates made available for this study, projects identified in<br />
Section 5.0 for further advancement or study would cost approximately $2 billion. These<br />
projects have cost estimates in the right-hand column of Tables ES.1 and 5.1. In addition,<br />
the Cross Harbor tunnel and ancillary facilities would cost between $4.4 and $7.3 billion,<br />
depending on whether a single or double tunnel system was constructed.<br />
Cambridge Systematics, Inc. 7-1