Annual Report,2009 - Directorate General of Mines Safety
Annual Report,2009 - Directorate General of Mines Safety Annual Report,2009 - Directorate General of Mines Safety
DGMS Annual Report,2009 (2) SSEX Component of the Scheme 1. Procurement of computers & peripherals Continued 2. Procurement of Office equipment Continued 3. Furnishing of offices Continued 4. Establishing exam section at Nagpur Continued 5. System Study Under study 6. System review Under review 7. Application software development In progress 8. Testing and implementation of software In progress 9. Training In progress 10. Design & development of the web content of the In progress examination-specific web pages 11. Design & development of online application In progress form. 12. Development of other internet- enabled services with enterprise-wide WAN connectivity. In progress (3) PIF Component: 1. Modular furnishing of conference hall at Sitarampur Under progress 2. Providing and fixing of 100 KVA DG set at Sitarampur Under progress 3. Const. of boundary wall around the DGMS plot at Under progress Bilaspur 4. Providing and construction of pavement in front of office Under progress and main gate Bellary 5. Providing, placing and fixing of PVC tank with separate Completed water pipe line for drinking water and utility at DGMS colony at Ajmer 6. Renovation of toilets in office bldg of DGMS at Ajmer Completed 8. Construction of office and residential buildings of DGMS Under progress at Goa 9. Construction of office and residential buildings of DGMS at Jabalpur Under progress A-90
DGMS Annual Report,2009 LEGISLATION FOR MINES SAFETY, HEALTH & WELFARE APPENDIX-I ADMINISTERED BY DGMS The Mines Act, 1952 The Coal Mines Regulations, 1957 The Metalliferous Mines Regulations, 1961 The Oil Mines Regulations, 1984 The Mines Rules, 1955 The Mines Vocational Training Rules, 1966 The Mines Rescue Rules, 1985 The Mines Crèche Rules, 1966 Coal Mines Pit Head Bath Rules, 1959 Electricity Act, 2003 Indian Electricity Rules, 1956 Allied Legislation Factories Act, 1948 – Chapter III & IV Manufacture, Storage & Import of Hazardous Chemicals Rules,1989 - under Environmental (Protection) Act, 1986 Land Acquisition (Mines) Act, 1885 Coal Mines Conservation & Development Act, 1974 A-91
- Page 39 and 40: Bucket wheel Excavator Dragline Sur
- Page 41 and 42: DGMS Annual Report,2009 2.6 Vocatio
- Page 43 and 44: DGMS Annual Report,2009 2.8 Owner-w
- Page 45 and 46: DGMS Annual Report,2009 Owner Year
- Page 47 and 48: DGMS Annual Report,2009 Owner Year
- Page 49 and 50: DGMS Annual Report,2009 Owner 2.9 O
- Page 51 and 52: DGMS Annual Report,2009 Owner Year
- Page 53 and 54: DGMS Annual Report,2009 Owner Year
- Page 55 and 56: DGMS Annual Report,2009 3.0 Non-Coa
- Page 57 and 58: DGMS Annual Report,2009 2006 78 79
- Page 59 and 60: DGMS Annual Report,2009 TABLE: 38 T
- Page 61 and 62: DGMS Annual Report,2009 3.2.2.3 Tra
- Page 63 and 64: DGMS Annual Report,2009 3.3 Respons
- Page 65 and 66: DGMS Annual Report,2009 *Provisiona
- Page 67 and 68: DGMS Annual Report,2009 3.9 Mineral
- Page 69 and 70: DGMS Annual Report,2009 Fatal Accid
- Page 71 and 72: DGMS Annual Report,2009 Fatal Accid
- Page 73 and 74: DGMS Annual Report,2009 3.10 Minera
- Page 75 and 76: DGMS Annual Report,2009 Mineral Yea
- Page 77 and 78: DGMS Annual Report,2009 Mineral Yea
- Page 79 and 80: DGMS Annual Report,2009 Mineral Yea
- Page 81 and 82: DGMS Annual Report,2009 5.0 Coal &
- Page 83 and 84: DGMS Annual Report,2009 6.0 Nationa
- Page 85 and 86: DGMS Annual Report,2009 8.0 Plan Sc
- Page 87 and 88: DGMS Annual Report,2009 suitable co
- Page 89: DGMS Annual Report,2009 (v) Classif
- Page 93 and 94: DGMS Annual Report, 2009 Field Orga
- Page 95 and 96: DGMS Annual Report, 2009 5. Dy.Dire
- Page 97 and 98: DGMS Annual Report, 2009 LIST OF GR
- Page 99 and 100: DGMS Annual Report, 2009 (d) Overma
- Page 101 and 102: DGMS Annual Report, 2009 (b) Second
- Page 103 and 104: DGMS Annual Report, 2009 APPENDIX-V
- Page 105 and 106: DGMS Annual Report, 2009 NOTIFICATI
- Page 107 and 108: DGMS Annual Report, 2009 members, w
- Page 109 and 110: DGMS Annual Report, 2009 Dadra & Na
- Page 111 and 112: DGMS Annual Report, 2009 Southern E
- Page 113 and 114: DGMS Annual Report, 2009 Dhanbad Re
- Page 115 and 116: DGMS Annual Report, 2009 Mine elect
- Page 117 and 118: DGMS Annual Report, 2009 severity r
- Page 119 and 120: DGMS Annual Report, 2009 (c) Mine S
- Page 121 and 122: DGMS Annual Report, 2009 Theodolite
- Page 123 and 124: DGMS Annual Report, 2009 Haulage an
- Page 125 and 126: DGMS Annual Report, 2009 Applicatio
- Page 127 and 128: DGMS Annual Report, 2009 Maintenanc
- Page 129 and 130: DGMS Annual Report, 2009 applicatio
- Page 131 and 132: DGMS Annual Report, 2009 thermodyna
- Page 133 and 134: DGMS Annual Report, 2009 Area and v
- Page 135 and 136: DGMS Annual Report, 2009 Developmen
- Page 137 and 138: DGMS Annual Report, 2009 [No.Board/
- Page 139 and 140: DGMS Annual Report, 2009 Safety rel
DGMS <strong>Annual</strong> <strong>Report</strong>,<strong>2009</strong><br />
(2) SSEX Component <strong>of</strong> the Scheme<br />
1. Procurement <strong>of</strong> computers & peripherals Continued<br />
2. Procurement <strong>of</strong> Office equipment Continued<br />
3. Furnishing <strong>of</strong> <strong>of</strong>fices Continued<br />
4. Establishing exam section at Nagpur Continued<br />
5. System Study Under study<br />
6. System review Under review<br />
7. Application s<strong>of</strong>tware development In progress<br />
8. Testing and implementation <strong>of</strong> s<strong>of</strong>tware In progress<br />
9. Training In progress<br />
10. Design & development <strong>of</strong> the web content <strong>of</strong> the In progress<br />
examination-specific web pages<br />
11. Design & development <strong>of</strong> online application In progress<br />
form.<br />
12. Development <strong>of</strong> other internet- enabled services with<br />
enterprise-wide WAN connectivity.<br />
In progress<br />
(3) PIF Component:<br />
1. Modular furnishing <strong>of</strong> conference hall at Sitarampur Under progress<br />
2. Providing and fixing <strong>of</strong> 100 KVA DG set at Sitarampur Under progress<br />
3. Const. <strong>of</strong> boundary wall around the DGMS plot at Under progress<br />
Bilaspur<br />
4. Providing and construction <strong>of</strong> pavement in front <strong>of</strong> <strong>of</strong>fice Under progress<br />
and main gate Bellary<br />
5. Providing, placing and fixing <strong>of</strong> PVC tank with separate Completed<br />
water pipe line for drinking water and utility at DGMS<br />
colony at Ajmer<br />
6. Renovation <strong>of</strong> toilets in <strong>of</strong>fice bldg <strong>of</strong> DGMS at Ajmer Completed<br />
8. Construction <strong>of</strong> <strong>of</strong>fice and residential buildings <strong>of</strong> DGMS Under progress<br />
at Goa<br />
9. Construction <strong>of</strong> <strong>of</strong>fice and residential buildings <strong>of</strong> DGMS<br />
at Jabalpur<br />
Under progress<br />
A-90