DGMS <strong>Annual</strong> <strong>Report</strong>, <strong>2009</strong><br />
The Ro<strong>of</strong> Bolts and its components or parts shall be subjected to Accelerated<br />
Weathering Test in mine water condition for 20 days. No deterioration should occur<br />
on the Assembly.<br />
(b) Accelerated Weathering Test shall also be conducted in acidic water<br />
condition for 20 days during which no deterioration should occur on the Assembly.<br />
(c) Corrosion Resistance Test :-<br />
The Ro<strong>of</strong> Bolt Assembly shall also be subjected to Field Exposure and Corrosion<br />
Resistivity Test per IS-555: 1970 to test the resistance to corrosion <strong>of</strong> the steel <strong>of</strong> the<br />
ro<strong>of</strong> bolt and its parts. The Ro<strong>of</strong> Bolt should pass the required test.<br />
6.0 SAMPLING & TESTING<br />
In order to check the composition and required parameters during manufacture, it shall<br />
be required that the random sampling shall be collected at least 1 sample containing<br />
adequate number/quantity <strong>of</strong> ro<strong>of</strong> bolts and its accessories for every 10,000 pieces <strong>of</strong><br />
the product in a batch and shall be subjected to required set <strong>of</strong> tests as prescribed in<br />
the previous paragraphs above and the data shall be kept recorded in a bound paged<br />
book kept for the purpose which shall be signed by the persons carrying out the test<br />
and shall be countersigned by the quality control <strong>of</strong>ficer posted at the manufacturing<br />
unit (s).<br />
6.1 The user shall carry out Physical examination tests as far as possible but shall<br />
conduct Tensile Test <strong>of</strong> the Assembly for every batch <strong>of</strong> Ro<strong>of</strong> Bolts & its Accessories<br />
received at their end before use and keep the records in a bound paged book kept for<br />
the purpose.<br />
In case the Ro<strong>of</strong> Bolts or any <strong>of</strong> its accessories fail to pass the required tests at the user<br />
end, that lot <strong>of</strong> the manufacture shall not be used and intimation there<strong>of</strong> shall be sent<br />
to this <strong>Directorate</strong> and also to the manufacture.<br />
Manufactures and the Users including the Test Houses, who are engaged for testing <strong>of</strong><br />
such material, are therefore requested to ensure the above mentioned Standard and<br />
Parameters before supplying and using at the mine.<br />
No. DGMS (Tech)/Circular No./ 11 Dhanbad, Dated – 20 th October, <strong>2009</strong><br />
To,<br />
Owner/Agent/Manager <strong>of</strong> all opencast <strong>Mines</strong>.<br />
Sub:- Provisions <strong>of</strong> Rear Vision System in Equipments<br />
Several accidents have occurred in opencast mines while reversing <strong>of</strong> equipment<br />
especially in dumpers/tippers. The manufactures provide only audio visual alarm and<br />
rear view mirrors in the equipments. Although the Audio Alarm gives warning to the<br />