27.01.2015 Views

Announcement of Revised DEIR - March 2013.pdf - Zitholele.co.za

Announcement of Revised DEIR - March 2013.pdf - Zitholele.co.za

Announcement of Revised DEIR - March 2013.pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Zitholele</strong> Consulting (Pty) Ltd<br />

Reg. No. 2000/000392/07<br />

PO Box 6002 Halfway House 1685<br />

South Africa<br />

Thandanani Park, Matuka Close<br />

Halfway Gardens, Midrand<br />

Tel 011-207-2060<br />

Fax 086-676-9950<br />

Email: mail@zitholele.<strong>co</strong>.<strong>za</strong><br />

15 <strong>March</strong> 2013<br />

Dear Stakeholder<br />

ENVIRONMENTAL STUDIES FOR THE PROPOSED SOLAR PARK INTEGRATION<br />

PROJECT<br />

(EIA#1: CSP-Aries/Nieuwehoop: DEA Ref No: 12/12/20/2606 and NEAS Ref No: DEA/EIA/0000785/2011)<br />

(EIA#2: CSP-Ferrum: DEA Ref No: 12/12/20/2607 and NEAS Ref No: DEA/EIA/0000778/2011)<br />

REVISED DRAFT ENVIRONMENTAL IMPACT REPORT (REVISED <strong>DEIR</strong>) AND DRAFT ENVIRONMENTAL<br />

MANAGEMENT PROGRAMME (DRAFT EMPR): AVAILABLE FOR REVIEW AND COMMENT<br />

As you may recall, the Draft Environmental Impact Assessment Report for the proposed Solar Park Integration<br />

Project (SPIP) has been made available for public review from Thursday 8 November 2012 to Thursday 7 December<br />

2012. The SPIP <strong>co</strong>nsist <strong>of</strong> several 400kV transmission power lines for the integration <strong>of</strong> the Concentrating Solar<br />

Park (CSP), near Upington, into the Eskom electricity network.<br />

Through the <strong>co</strong>nsultation process undertaken in the Environmental Impact Assessment (EIA) process, <strong>Zitholele</strong><br />

Consulting was made aware <strong>of</strong> the presence <strong>of</strong> the Square Kilometer Array (SKA) requirements regarding the close<br />

proximity <strong>of</strong> infrastructures, such as power lines, that will have a negative impact on their operations. This is the key<br />

reason why the specialists’ team had to identify and assess alternative <strong>co</strong>rridors. The following properties fall within<br />

the revised <strong>co</strong>rridors:<br />

EIA #1 EIA #2<br />

CSP-Aries Substation<br />

(southwest <strong>of</strong> Kenhardt)<br />

CSP-Nieuwehoop Substation<br />

(northeast <strong>of</strong> Kenhardt)<br />

CSP-Ferrum Substation<br />

(Kathu)<br />

LOXTON VALE 464 (Ptn9)<br />

Bethesda 38 (Ptns Remiander, BREDENKAMP 567 (Ptn Remainder)<br />

FRIER`S DALE 466 (Ptn27)<br />

279 & 335)<br />

Brooks 568 (Ptn Remainder)<br />

PLAAS 602 (Remainder) Beaumont 569 (Ptns Remainder & 3)<br />

PLAAS 584 (Remainder) Murray II 570 (Ptn 3)<br />

ZWART BOOIS BERG ANNEX 475 (Ptns<br />

Cos 571 (Ptns Remainder, 1, 2, 3 & 4)<br />

2, 6 &7)<br />

FARM 595 (Remainder) Vrolikheid 637 (Ptns Remainder, 1 & 2)<br />

FARM 616 (Remainder)<br />

Mount Leonard 640 (Ptns Remainder &<br />

1)<br />

EENDUIN 465 (Ptns 39 & 40) Mount Temple 645 (Ptns 1)<br />

ZWART BOOIS BERG SUID 652 (Ptns<br />

Caston 650 (Ptns Remainder, 1 & 2)<br />

Remainder & 3)<br />

BAVIAANS KRANTZ 474 (Ptns 10, 11 &<br />

Tomkins 657 (Ptn 1)<br />

15)<br />

Writght 538 (Ptns Remainder & 1)<br />

Harley 573 (Ptn Remainder)<br />

Ellies Rust 647 (Ptns Remainder & 1)<br />

Commissie 649 (Ptns Remainder & 2)<br />

Rossville 638 (Ptns Remainder & 1)<br />

Kalkpan 639 (Ptn Remainder)


The findings <strong>of</strong> the environmental studies have been integrated and the <strong>Revised</strong> <strong>DEIR</strong> and the <strong>Revised</strong> EMPr. The<br />

<strong>Revised</strong> <strong>DEIR</strong> also provides information regarding the methodology and <strong>co</strong>mparative assessment done which<br />

provided the environmental with the information they needed to re<strong>co</strong>mmend Corridor Alternative 1B for the Solar –<br />

Aries <strong>co</strong>rridor, Corridor Alternative 3B for the Solar - Hieuwehoop <strong>co</strong>rridor, and Corridor Alternative 3A for the Solar<br />

– Ferrum <strong>co</strong>rridor as the preferred Alternative Corridors.<br />

Public review <strong>of</strong> <strong>Revised</strong> <strong>DEIR</strong> and <strong>Revised</strong> EMPr<br />

from Thursday 14 <strong>March</strong> 2013 to Wednesday 17 April 2013<br />

The <strong>Revised</strong> <strong>DEIR</strong> and <strong>Revised</strong> EMPr have been prepared in terms <strong>of</strong> the Environmental Impact Assessment<br />

Regulations as published in GNR 543 - 546 – Government Gazette No. 33306 <strong>of</strong> 2010. In ac<strong>co</strong>rdance with the EIA<br />

Regulations (2010), any significant changes after a draft Report was made available for public review, a revised or<br />

updated Report must be made available for a 30-day <strong>co</strong>mment period.<br />

The <strong>Revised</strong> <strong>DEIR</strong> and <strong>Revised</strong> EMPr will be available for public review from Friday 15 <strong>March</strong> 2013 to Wednesday<br />

17 April 2013. Thereafter, the reports will be updated and submitted to the Department <strong>of</strong> Environmental Affairs<br />

(DEA). The DEA will, in <strong>co</strong>nsultation with the <strong>co</strong>mmenting authorities, <strong>co</strong>nsider the findings and re<strong>co</strong>mmendations<br />

and either grant an Environmental Authorisation or reject it.<br />

These Reports will be available at the public places listed in the table below. The report is also available for<br />

download from the Eskom and <strong>Zitholele</strong> websites (www.eskom.<strong>co</strong>.<strong>za</strong>/eia and www.zitholele.<strong>co</strong>.<strong>za</strong>/eskom-solar).<br />

PUBLIC PLACE CONTACT CONTACT TEL ADDRESS<br />

Kathu Public Library Ms Theodora Tsalao (053) 723 2261 Civic Centre, Cnr Frikkie Meyer & Hendrik Van Eck, Kathu<br />

Olifantshoek Public Library Ms Ellen Visser (053) 331 0002 Lanham Street, Olifantshoek<br />

Upington Public Library Ms Inga Engelbrecht (053) 338 7157 Mutual Street, Upington<br />

Kenhardt Public Library Ms Geene Einam (053) 651 6508 Park Street, Kenhardt<br />

Kakamas Public Library Ms Manda Yough (054) 431 6303 Voortrekker Street, Kakamas<br />

Keimoes Public Library Ms Yvonne Booysen (054) 461 6406 Main Street, Keimoes<br />

You can <strong>co</strong>mment on the reports in any <strong>of</strong> the following ways:<br />

By <strong>co</strong>mpleting the <strong>co</strong>mment sheet that is available with these reports at the public places.<br />

By writing a letter.<br />

By e-mail or telephone to the public participation <strong>of</strong>fice.<br />

By attending any one <strong>of</strong> the public meetings (see below).<br />

Comments on these reports must be submitted on or before Wednesday 17 April 2013.<br />

Kindly send your reply to Ni<strong>co</strong>lene Venter at the Public Participation Office on fax number 086-676-9950 or e-mail to<br />

ni<strong>co</strong>lenev@zitholele.<strong>co</strong>.<strong>za</strong>. You are also wel<strong>co</strong>me to <strong>co</strong>ntact <strong>Zitholele</strong> Consulting on (011) 207-2077.<br />

Yours sincerely<br />

Ni<strong>co</strong>lene Venter<br />

Public Participation Office

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!