SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP
SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP
STP 11-250N-SM-TG Subject Area 4: ISYSCON Perform ISYSCON Node Setup and Initialization at a Signal Brigade or Higher 113-482-8001 Conditions: You are a network management technician assigned to a Brigade or higher. You are given an ISYSCON facility with preloaded system software, an OPORD, and appropriate references. Standards: The ISYSCON facility was operational IAW the OPORD. Performance Steps 1. Setup. 2. Start-up. a. Map data administration. b. File administration. c. Basic account and node administration. Performance Measures GO NO GO 1. Setup. —— —— 2. Start-up. —— —— a. Map data administration. b. File administration. c. Basic account and node administration. Evaluation Guidance: Score the soldier GO if all steps are passed. Score the soldier NO GO if any step is failed. If the soldier fails any step, show what was done wrong and how to do it correctly. References Required TM 11-5895-1560-13&P TM 11-5895-1582-13&P Related 3-34
STP 11-250N-SM-TG Subject Area 5: NETWORK PLANNING AND ENGINEERING Conduct Network Planning and Engineering (NPE) at a Signal Brigade or Higher 113-494-8001 Conditions: You are a network management technician assigned to a Signal Brigade or higher. You are given an OPORD; an operational, integrated system control facility/platform (ISYSCON, RAPTer, NPT, TNAPS, JNMS, etc.), user requirements, and appropriate references. Standards: Accepted the plan for inclusion in the OPORD. Performance Steps 1. Perform preplanning and network management functions for an integrated network. 2. Perform BSM planning. a. Direct planning allocation and deconfliction of frequency resources for switch and non-switch communication systems. b. Develop SOI/CEOI. 3. Conduct mission and plan management functions. 4. Identify COMSEC requirements. a. Determine network keying and rekeying requirements. b. Develop crypto-key distribution plan. c. Develop crypto-key variable management plan. 5. Perform WAN technical control. 6. Perform log and report management functions. 7. Plan LANs. a. Determine location of hosts. b. Determine equipment requirements. c. Determine type of connection media (10baseT, remote access, etc.). d. Determine IP allocation. e. Determine user requirements (NIPRNET/SIPRNET). f. Determine security classification of the LAN and encryption requirements. g. Determine networking software requirements and interoperability with hardware. h. Identify system-training requirements. i. Identify maintenance requirements. j. Identify sustainment supply needs (connectors, NIC, etc.). k. Prepare network diagram and OPORD appendix. 8. Direct LAN system administration. a. Diagnose LAN system malfunctions. b. Determine LAN performance using available network monitoring tools. c. Reconfigure LAN based on user requirements. d. Configure server for user profiles and permission. e. Assign security features for users (names, passwords, etc.). f. Establish and implement fault tolerance measures. 9. Perform risk assessment. 10. Provide management information to the JCCC or higher. 11. Develop reconstitution and contingency plan for the network. 3-35
- Page 1: STP 11-250N-SM-TG HEADQUARTERS DEPA
- Page 4 and 5: STP 11-250N-SM-TG Subject Area 3: T
- Page 7 and 8: STP 11-250N-SM-TG CHAPTER 1 Introdu
- Page 9 and 10: STP 11-250N-SM-TG (b) The instituti
- Page 11 and 12: STP 11-250N-SM-TG (1) Leaders condu
- Page 13 and 14: STP 11-250N-SM-TG coordinate Active
- Page 15 and 16: STP 11-250N-SM-TG CHAPTER 2 Trainin
- Page 17 and 18: STP 11-250N-SM-TG 2-3. Critical Tas
- Page 19 and 20: STP 11-250N-SM-TG CHAPTER 3 MOS/Ski
- Page 21 and 22: STP 11-250N-SM-TG Direct the Instal
- Page 23 and 24: STP 11-250N-SM-TG References Requir
- Page 25 and 26: STP 11-250N-SM-TG References Requir
- Page 27 and 28: STP 11-250N-SM-TG Evaluation Guidan
- Page 29 and 30: STP 11-250N-SM-TG Performance Measu
- Page 31 and 32: STP 11-250N-SM-TG Performance Measu
- Page 33 and 34: STP 11-250N-SM-TG References Requir
- Page 35 and 36: STP 11-250N-SM-TG Subject Area 5: N
- Page 37 and 38: STP 11-250N-SM-TG References Requir
- Page 39 and 40: STP 11-250N-SM-TG Evaluation Guidan
- Page 41 and 42: STP 11-250N-SM-TG References Requir
- Page 43 and 44: STP 11-250N-SM-TG Performance Measu
- Page 45 and 46: STP 11-250N-SM-TG Performance Measu
- Page 47 and 48: STP 11-250N-SM-TG Performance Measu
- Page 49 and 50: STP 11-250N-SM-TG Performance Measu
- Page 51: STP 11-250N-SM-TG References Requir
- Page 55 and 56: STP 11-250N-SM-TG References Requir
- Page 57: STP 11-250N-SM-TG Performance Measu
- Page 60 and 61: STP 11-250N-SM-TG BGP BN bogus gate
- Page 62 and 63: STP 11-250N-SM-TG DTM Draft Technic
- Page 64 and 65: STP 11-250N-SM-TG METT-T Mission, E
- Page 66 and 67: STP 11-250N-SM-TG S3 SA Operations
- Page 68 and 69: STP 11-250N-SM-TG TRADOC Training a
- Page 70 and 71: STP 11-250N-SM-TG Other Product Typ
- Page 72 and 73: STP 11-250N-SM-TG TM 11-5820-865-12
- Page 74 and 75: STP 11-250N-SM-TG FM 24-18 Tactical
- Page 76 and 77: STP 11-250N-SM-TG DISA CIR 310-130-
- Page 78 and 79: STP 11-250N-SM-TG TB 11-5895-1544-1
- Page 80 and 81: STP 11-250N-SM-TG DTM 11-7010-326-1
- Page 82 and 83: STP 11-250N-SM-TG TM 11-5805-650-12
- Page 84 and 85: STP 11-250N-SM-TG TM 11-5805-747-12
- Page 86 and 87: STP 11-250N-SM-TG TM 11-5805-797-12
- Page 88 and 89: STP 11-250N-SM-TG AN/TRC-190A(V)2,
- Page 90 and 91: STP 11-250N-SM-TG through AN/FRC-16
- Page 92 and 93: STP 11-250N-SM-TG TM 11-5820-934-13
- Page 94 and 95: STP 11-250N-SM-TG TM 11-5895-1197-1
- Page 96 and 97: STP 11-250N-SM-TG TM 11-5895-1535-1
- Page 98 and 99: STP 11-250N-SM-TG TM 11-5985-370-12
- Page 100 and 101: STP 11-250N-SM-TG TM 11-7010-256-12
STP 11-<strong>250N</strong>-SM-TG<br />
Subject Area 5: NETWORK PLANNING <strong>AND</strong> ENGINEERING<br />
Conduct Network Planning and Engineering (NPE) at a Signal Brigade or Higher<br />
113-494-8001<br />
Conditions: You are a network management technician assigned to a Signal Brigade or higher. You are<br />
given an OPORD; an operational, integrated system control facility/platform (ISYSCON, RAPTer, NPT,<br />
TNAPS, JNMS, etc.), user requirements, and appropriate references.<br />
Standards: Accepted the plan for inclusion in the OPORD.<br />
Performance Steps<br />
1. Perform preplanning and network management functions for an integrated network.<br />
2. Perform BSM planning.<br />
a. Direct planning allocation and deconfliction of frequency resources for switch and non-switch<br />
communication systems.<br />
b. Develop SOI/CEOI.<br />
3. Conduct mission and plan management functions.<br />
4. Identify COMSEC requirements.<br />
a. Determine network keying and rekeying requirements.<br />
b. Develop crypto-key distribution plan.<br />
c. Develop crypto-key variable management plan.<br />
5. Perform WAN technical control.<br />
6. Perform log and report management functions.<br />
7. Plan LANs.<br />
a. Determine location of hosts.<br />
b. Determine equipment requirements.<br />
c. Determine type of connection media (10baseT, remote access, etc.).<br />
d. Determine IP allocation.<br />
e. Determine user requirements (NIPRNET/SIPRNET).<br />
f. Determine security classification of the LAN and encryption requirements.<br />
g. Determine networking software requirements and interoperability with hardware.<br />
h. Identify system-training requirements.<br />
i. Identify maintenance requirements.<br />
j. Identify sustainment supply needs (connectors, NIC, etc.).<br />
k. Prepare network diagram and OPORD appendix.<br />
8. Direct LAN system administration.<br />
a. Diagnose LAN system malfunctions.<br />
b. Determine LAN performance using available network monitoring tools.<br />
c. Reconfigure LAN based on user requirements.<br />
d. Configure server for user profiles and permission.<br />
e. Assign security features for users (names, passwords, etc.).<br />
f. Establish and implement fault tolerance measures.<br />
9. Perform risk assessment.<br />
10. Provide management information to the JCCC or higher.<br />
11. Develop reconstitution and contingency plan for the network.<br />
3-35