27.01.2015 Views

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STP 11-<strong>250N</strong>-SM-TG<br />

Plan a Message Switch Network at a Signal Brigade or Higher<br />

113-324-8001<br />

Conditions: You are in a Signal Brigade S3 environment and must design a message switch network<br />

(EAC, ECB, and Joint). You are given an OPORD, the subscriber requirements, appropriate references,<br />

and the status of switching equipment.<br />

Standards: Accepted the plan for inclusion in the OPORD and the plan supported the communications<br />

requirements.<br />

Performance Steps<br />

1. Determine availability of resources.<br />

2. Coordinate higher and adjacent system interface connectivity;<br />

3. Determine switching equipment interface and connectivity requirements.<br />

4. Determine subscriber (terminal) interface and connectivity requirements.<br />

5. Determine network AUTODIN access requirements.<br />

a. Review TSR.<br />

b. Review TSO.<br />

c. Develop or interpret SAR/GAR.<br />

6. Prepare system diagram, network diagram, and OPORD appendix.<br />

7. Identify user communities (R, U, and Y)<br />

8. Obtain Y routers, TCC and TRC codes.<br />

9. Prepare database.<br />

10. Identify SCIF activation and deactivation requirements/procedures.<br />

11. Determine crypto-key requirements, distribution plan, and crypto-key variable management plan.<br />

12. Develop reconstitution and contingency plan for the network.<br />

Performance Measures GO NO GO<br />

1. Determined availability of resources. —— ——<br />

2. Coordinated higher and adjacent system interface connectivity. —— ——<br />

3. Determined switching equipment interface and connectivity requirements. —— ——<br />

4. Determined subscriber (terminal) interface and connectivity requirements. —— ——<br />

5. Determined network AUTODIN access requirements. —— ——<br />

a. Reviewed TSR.<br />

b. Reviewed TSO.<br />

c. Developed or interpreted SAR/GAR.<br />

6. Prepared system diagram, network diagram, and OPORD appendix. —— ——<br />

7. Identified user communities (R, U, and Y) —— ——<br />

8. Obtained Y routers, TCC and TRC codes. —— ——<br />

9. Prepared database. —— ——<br />

3-28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!