27.01.2015 Views

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STP 11-<strong>250N</strong>-SM-TG<br />

Performance Measures GO NO GO<br />

1. Performed preplanning and network management functions for an integrated<br />

network.<br />

—— ——<br />

2. Performed BSM planning. —— ——<br />

a. Directed planning allocation and deconfliction of frequency resources for<br />

switch and non-switch communication systems.<br />

b. Developed SOI/CEOI.<br />

3. Conducted mission and plan management functions. —— ——<br />

4. Identified COMSEC requirements. —— ——<br />

a. Determined network keying and rekeying requirements.<br />

b. Developed crypto-key distribution plan.<br />

c. Developed crypto-key variable management plan.<br />

5. Performed WAN technical control. —— ——<br />

6. Performed TI management functions. —— ——<br />

7. Performed log and report management functions. —— ——<br />

8. Planned LANs. —— ——<br />

a. Determined location of hosts.<br />

b. Determined equipment requirements.<br />

c. Determined type of connection media (10baseT, remote access, etc.).<br />

d. Determined IP allocation.<br />

e. Determined user requirements (NIPRNET/SIPRNET).<br />

f. Determined security classification of the LAN and encryption requirements.<br />

g. Determined networking software requirements and interoperability with<br />

hardware.<br />

h. Identified system-training requirements.<br />

i. Identified maintenance requirements.<br />

j. Identified sustainment supply needs (connectors, NIC, etc.).<br />

k. Prepared system diagram, network diagram, and OPORD appendix.<br />

9. Directed LAN system administration. —— ——<br />

a. Diagnosed LAN system malfunctions.<br />

b. Determined LAN performance using available network monitoring tools.<br />

c. Reconfigured LAN based on user requirements.<br />

d. Configured server for user profiles and permission.<br />

e. Assigned security features for users (names, passwords, etc.).<br />

f. Established and implemented fault tolerance measures.<br />

10. Performed risk assessment. —— ——<br />

11. Provided management information to Brigade or higher. —— ——<br />

Evaluation Guidance: Score the soldier GO if all steps are passed. Score the soldier NO GO if any<br />

step is failed. If the soldier fails any step, show what was done wrong and how to do it correctly.<br />

3-18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!