SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP
SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP
SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
STP 11-<strong>250N</strong>-SM-TG<br />
Subject Area 2: MESSAGE SWITCHING<br />
Direct the Installation and Integration of a Message Switch<br />
113-324-7003<br />
Conditions: You are assigned to a message switch team. You are given an OPORD, a team of soldiers,<br />
appropriate references, and a message switch.<br />
Standards: The message switch was operational IAW the OPORD.<br />
Performance Steps<br />
1. Initialize the Power Group.<br />
2. Initialize the Central Processor Group (CPG).<br />
3. Initialize the Time Division Interface Module (TDIM) Group.<br />
4. Initialize the Common Interface Group (CIG).<br />
5. Initialize the Communications Group.<br />
6. Perform on-line procedures.<br />
7. Perform shutdown procedures.<br />
8. Conduct risk assessment.<br />
Performance Measures GO NO GO<br />
1. Initialized the Power Group. —— ——<br />
2. Initialized the CPG. —— ——<br />
3. Initialized the TDIM Group. —— ——<br />
4. Initialized the CIG. —— ——<br />
5. Initialized the Communications Group. —— ——<br />
6. Performed on-line procedures. —— ——<br />
7. Performed shutdown procedures. —— ——<br />
8. Conducted risk assessment. —— ——<br />
Evaluation Guidance: Score the soldier GO if all steps are passed. Score the soldier NO GO if any<br />
step is failed. If the soldier fails any step, show what was done wrong and how to do it correctly.<br />
3-6