27.01.2015 Views

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STP 11-<strong>250N</strong>-SM-TG<br />

Subject Area 2: MESSAGE SWITCHING<br />

Direct the Installation and Integration of a Message Switch<br />

113-324-7003<br />

Conditions: You are assigned to a message switch team. You are given an OPORD, a team of soldiers,<br />

appropriate references, and a message switch.<br />

Standards: The message switch was operational IAW the OPORD.<br />

Performance Steps<br />

1. Initialize the Power Group.<br />

2. Initialize the Central Processor Group (CPG).<br />

3. Initialize the Time Division Interface Module (TDIM) Group.<br />

4. Initialize the Common Interface Group (CIG).<br />

5. Initialize the Communications Group.<br />

6. Perform on-line procedures.<br />

7. Perform shutdown procedures.<br />

8. Conduct risk assessment.<br />

Performance Measures GO NO GO<br />

1. Initialized the Power Group. —— ——<br />

2. Initialized the CPG. —— ——<br />

3. Initialized the TDIM Group. —— ——<br />

4. Initialized the CIG. —— ——<br />

5. Initialized the Communications Group. —— ——<br />

6. Performed on-line procedures. —— ——<br />

7. Performed shutdown procedures. —— ——<br />

8. Conducted risk assessment. —— ——<br />

Evaluation Guidance: Score the soldier GO if all steps are passed. Score the soldier NO GO if any<br />

step is failed. If the soldier fails any step, show what was done wrong and how to do it correctly.<br />

3-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!