SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP
SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP
SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 250N ... - AskTOP
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
STP 11-<strong>250N</strong>-SM-TG<br />
CHAPTER 3<br />
<strong>MOS</strong>/Skill Level Tasks<br />
Skill Levels 1/2<br />
Subject Area 1: CIRCUIT SWITCHING<br />
Plan a Circuit Switch Network at a Signal Battalion<br />
113-528-7001<br />
Conditions: You are in a Signal Battalion S3 environment and must design a circuit switch network<br />
(EAC, ECB, and Joint). You are given an OPORD, the subscriber requirements, appropriate references,<br />
and status of switching equipment.<br />
Standards: Accepted the plan for inclusion in the OPORD.<br />
Performance Steps<br />
1. Determine the availability of resources.<br />
2. Coordinate higher and adjacent system interface connectivity.<br />
3. Identify area codes and autonomous system boundaries.<br />
a. TPN (net ID).<br />
b. Develop and interpret SAR/GAR.<br />
c. Special circuits.<br />
4. Determine network-timing requirements.<br />
5. Establish Parent Switch (master/slave) relationship.<br />
6. Identify COMSEC Parent Switch.<br />
a. Determine network keying and rekeying requirements.<br />
b. Develop crypto-key distribution plan.<br />
c. Develop crypto-key variable management plan.<br />
7. Determine transmission media requirements (SHF, TROPO, EHF, UHF, VHF/RAU, fiber or cable,<br />
ATM, wireless, COTS, multiplexers/modems, satellite, and standardized tactical entry point (STEP)).<br />
a. Determine signal equipment availability.<br />
b. Determine signal system and satellite interface and configuration requirements.<br />
c. Determine hybrid transmission interface and connectivity requirements.<br />
d. Determine digital transmission group requirements (8/9-channel modularity, radio frequency,<br />
etc.).<br />
e. Determine commercial leased lines and interface equipment requirements.<br />
f. Develop and interpret crew assignment worksheets.<br />
8. Prepare system diagram, network diagram, and OPORD appendix.<br />
9. Determine essential user bypass (EUB) and duplication scheme.<br />
10. Determine preaffiliation list (PAL) requirements and develop PAL distribution plan.<br />
Performance Measures GO NO GO<br />
1. Determined the availability of resources. —— ——<br />
3-1