Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ... Final Environmental Impact Report - Whittier Bridge/I-95 ...

mhd.state.ma.us
from mhd.state.ma.us More from this publisher
27.01.2015 Views

Appendix 2 References Primary information sources for this report are listed below. Reference No. Title 1 Essex County Flood Insurance Study (FIS), July 2012 . 2 Newburyport FIS, April 1977. 3 MassDOT Construction Plans, Br. No. A-07-016=N-11-017, January 1951. 4 Parsons Brinckerhoff (on behalf of MassDOT), I-95 / Whittier Bridge Replacement Type Study Report , September, 2010. 5 Applied Coastal Research and Engineering, Inc (on behalf of MassDOT), Draft Technical Report, Whittier Bridge, Merrimack River, Massachusetts , April 2010 6 U.S. Army Corps of Engineers (COE), Hydrologic Engineering Center, HEC-RAS River Analysis System, Version 4.1, January 2010. 7 US Army Corps of Engineers (COE), Hydrologic Engineering Center, Water Surface Profile Computer Program, HEC-2, September 1982. 8 Executive Order 11988--Floodplain Management, May 24, 1977. 9 Federal Emergency Management Agency, The National Flood Insurance Program and Related Regulations, Code of Federal Regulations (CFR) Title 44, Parts 59, 60, 65, and 70 (44 CFR Parts 59, 60, 65, and 70). 10 Federal Highway Administration (FHWA), Procedures For Coordinating Highway Encroachments On Floodplains With The Federal Emergency Management Agency, 23 CFR, Section 650.115, September 1992. 11 Federal Highway Administration (FHWA), , Location and Hydraulic Design of Encroachments on Flood Plains, 23 FR 650.101, November 1979.

Whittier Bridge/I-95 Improvement Project FEIR Appendices Appendix C Massachusetts Division of Marine Fisheries Correspondence dated December 9, 2011 and National Marine Fisheries Service Correspondence dated November 29, 2011

Appendix 2<br />

References<br />

Primary information sources for this report are listed below.<br />

Reference No.<br />

Title<br />

1 Essex County Flood Insurance Study (FIS), July 2012 .<br />

2 Newburyport FIS, April 1977.<br />

3 MassDOT Construction Plans, Br. No. A-07-016=N-11-017, January 1<strong>95</strong>1.<br />

4 Parsons Brinckerhoff (on behalf of MassDOT), I-<strong>95</strong> / <strong>Whittier</strong> <strong>Bridge</strong> Replacement Type<br />

Study <strong>Report</strong> , September, 2010.<br />

5 Applied Coastal Research and Engineering, Inc (on behalf of MassDOT), Draft<br />

Technical <strong>Report</strong>, <strong>Whittier</strong> <strong>Bridge</strong>, Merrimack River, Massachusetts , April 2010<br />

6 U.S. Army Corps of Engineers (COE), Hydrologic Engineering Center, HEC-RAS River<br />

Analysis System, Version 4.1, January 2010.<br />

7 US Army Corps of Engineers (COE), Hydrologic Engineering Center, Water Surface<br />

Profile Computer Program, HEC-2, September 1982.<br />

8 Executive Order 11988--Floodplain Management, May 24, 1977.<br />

9 Federal Emergency Management Agency, The National Flood Insurance Program and<br />

Related Regulations, Code of Federal Regulations (CFR) Title 44, Parts 59, 60, 65, and 70<br />

(44 CFR Parts 59, 60, 65, and 70).<br />

10 Federal Highway Administration (FHWA), Procedures For Coordinating<br />

Highway Encroachments On Floodplains With The Federal Emergency<br />

Management Agency, 23 CFR, Section 650.115, September 1992.<br />

11 Federal Highway Administration (FHWA), , Location and Hydraulic Design<br />

of Encroachments on Flood Plains, 23 FR 650.101, November 1979.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!