Final Environmental Impact Report - Whittier Bridge/I-95 ...
Final Environmental Impact Report - Whittier Bridge/I-95 ... Final Environmental Impact Report - Whittier Bridge/I-95 ...
Appendix 2 References Primary information sources for this report are listed below. Reference No. Title 1 Essex County Flood Insurance Study (FIS), July 2012 . 2 Newburyport FIS, April 1977. 3 MassDOT Construction Plans, Br. No. A-07-016=N-11-017, January 1951. 4 Parsons Brinckerhoff (on behalf of MassDOT), I-95 / Whittier Bridge Replacement Type Study Report , September, 2010. 5 Applied Coastal Research and Engineering, Inc (on behalf of MassDOT), Draft Technical Report, Whittier Bridge, Merrimack River, Massachusetts , April 2010 6 U.S. Army Corps of Engineers (COE), Hydrologic Engineering Center, HEC-RAS River Analysis System, Version 4.1, January 2010. 7 US Army Corps of Engineers (COE), Hydrologic Engineering Center, Water Surface Profile Computer Program, HEC-2, September 1982. 8 Executive Order 11988--Floodplain Management, May 24, 1977. 9 Federal Emergency Management Agency, The National Flood Insurance Program and Related Regulations, Code of Federal Regulations (CFR) Title 44, Parts 59, 60, 65, and 70 (44 CFR Parts 59, 60, 65, and 70). 10 Federal Highway Administration (FHWA), Procedures For Coordinating Highway Encroachments On Floodplains With The Federal Emergency Management Agency, 23 CFR, Section 650.115, September 1992. 11 Federal Highway Administration (FHWA), , Location and Hydraulic Design of Encroachments on Flood Plains, 23 FR 650.101, November 1979.
Whittier Bridge/I-95 Improvement Project FEIR Appendices Appendix C Massachusetts Division of Marine Fisheries Correspondence dated December 9, 2011 and National Marine Fisheries Service Correspondence dated November 29, 2011
- Page 361 and 362: Whittier Bridge/I-95 Improvement Pr
- Page 363 and 364: Whittier Bridge/I-95 Improvement Pr
- Page 365 and 366: Whittier Bridge/I-95 Improvement Pr
- Page 367 and 368: Whittier Bridge/I-95 Improvement Pr
- Page 369 and 370: Whittier Bridge/I-95 Improvement Pr
- Page 371 and 372: Whittier Bridge/I-95 Improvement Pr
- Page 373 and 374: Whittier Bridge/I-95 Improvement Pr
- Page 375 and 376: Whittier Bridge/I-95 Improvement Pr
- Page 377 and 378: Whittier Bridge/I-95 Improvement Pr
- Page 379 and 380: Whittier Bridge/I-95 Improvement Pr
- Page 381 and 382: Whittier Bridge/I-95 Improvement Pr
- Page 383 and 384: Whittier Bridge/I-95 Improvement Pr
- Page 385 and 386: Whittier Bridge/I-95 Improvement Pr
- Page 387 and 388: Whittier Bridge/I-95 Improvement Pr
- Page 389 and 390: Whittier Bridge/I-95 Improvement Pr
- Page 391 and 392: Whittier Bridge/I-95 Improvement Pr
- Page 393: Whittier Bridge/I-95 Improvement Pr
- Page 397 and 398: Whittier Bridge/I‐95 Improvement
- Page 399 and 400: Spill Prevention and Response MassD
- Page 401: Appendix: Best Management Practices
- Page 405 and 406: The Commonwealth Of Massachusetts M
- Page 407 and 408: downstream of the existing bridge w
- Page 409 and 410: Appendix 1 - Tables 1, 2, and 3 Tab
- Page 411: Table 4. Summary of Model Simulatio
- Page 416 and 417: process. If the project avoids simu
- Page 418 and 419: anadromous fish including American
- Page 420 and 421: Conclusions In summary, we recommen
Appendix 2<br />
References<br />
Primary information sources for this report are listed below.<br />
Reference No.<br />
Title<br />
1 Essex County Flood Insurance Study (FIS), July 2012 .<br />
2 Newburyport FIS, April 1977.<br />
3 MassDOT Construction Plans, Br. No. A-07-016=N-11-017, January 1<strong>95</strong>1.<br />
4 Parsons Brinckerhoff (on behalf of MassDOT), I-<strong>95</strong> / <strong>Whittier</strong> <strong>Bridge</strong> Replacement Type<br />
Study <strong>Report</strong> , September, 2010.<br />
5 Applied Coastal Research and Engineering, Inc (on behalf of MassDOT), Draft<br />
Technical <strong>Report</strong>, <strong>Whittier</strong> <strong>Bridge</strong>, Merrimack River, Massachusetts , April 2010<br />
6 U.S. Army Corps of Engineers (COE), Hydrologic Engineering Center, HEC-RAS River<br />
Analysis System, Version 4.1, January 2010.<br />
7 US Army Corps of Engineers (COE), Hydrologic Engineering Center, Water Surface<br />
Profile Computer Program, HEC-2, September 1982.<br />
8 Executive Order 11988--Floodplain Management, May 24, 1977.<br />
9 Federal Emergency Management Agency, The National Flood Insurance Program and<br />
Related Regulations, Code of Federal Regulations (CFR) Title 44, Parts 59, 60, 65, and 70<br />
(44 CFR Parts 59, 60, 65, and 70).<br />
10 Federal Highway Administration (FHWA), Procedures For Coordinating<br />
Highway Encroachments On Floodplains With The Federal Emergency<br />
Management Agency, 23 CFR, Section 650.115, September 1992.<br />
11 Federal Highway Administration (FHWA), , Location and Hydraulic Design<br />
of Encroachments on Flood Plains, 23 FR 650.101, November 1979.