<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 1.0: Changes Since the Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong> and Resolution of Additional Issues<br />

A bulleted listing of additional information submitted to date to the conservation commissions is<br />

presented below.<br />

Project Wide<br />

Numerous NOI and stormwater plan revisions were submitted which applied on a project-wide basis<br />

to all three communities:<br />

Plan entitled ―Compliance with New Development Recharge Requirements‖ dated January 23,<br />

2012 provided to demonstrate percentage of site diverted to a recharge BMP;<br />

<br />

<br />

<br />

<br />

<br />

<br />

Plan entitled ―New Development Recharge Calculations‖ dated January 16, 2012 provided to<br />

demonstrate calculations for required recharge for new development for each soil type;<br />

Typical MassDOT drainage details (Infiltration Basin, Wet Basin, Detention Basin, Sediment<br />

Forebay, and Check Dams) submitted;<br />

Numerous Notice of Intent plan revisions including additional details on sedimentation and<br />

erosion control during construction and delineation of allowable work areas in the vicinity of<br />

wetland resources along the corridor;<br />

Revised ―Subsurface Test Pit Plans‖ dated January 25, 2012 (4 sheets total) depicting additional<br />

test pit locations;<br />

Numerous stormwater management plan revisions;<br />

Additional typical highway sections;<br />

―New Development Recharge Calculations‖ dated January 16, 2012;<br />

―Rip Rap Apron Sizing Summary‖ dated January 16, 2012;<br />

<br />

Revised Stormwater <strong>Report</strong> Figure 9 (revised scale); and<br />

Revised ―Water Quality Volume Calculations‖ dated January 16, 2012 for Infiltration Basin 4,<br />

Infiltration Basin 5, Infiltration Basin 6 and Wet Basin 7A.<br />

MassDOT also submitted a project-specific Operation and Maintenance Plan and Long Term<br />

Pollution Prevention Plan (Appendix A) to each conservation commission to demonstrate<br />

compliance with stormwater performance standard 9.<br />

Additional supplemental information has been provided individually to each of the conservation<br />

commissions in response to specific questions raised by the individual commission or the peer<br />

review consultant on behalf of the commission. The following listings detail the specific information<br />

provided to each commission.<br />

Newburyport Conservation Commission<br />

Supplemental information provided to Newburyport included the following plans and information:<br />

<br />

<br />

The NOI was revised to provide additional description of Wetland B in general and the resource<br />

characterization information in the ANRAD was included;<br />

The impacts to riverfront area were modified slightly and the plans for restoration of riverfront<br />

areas were developed; and<br />