Final Environmental Impact Report - Whittier Bridge/I-95 ...
Final Environmental Impact Report - Whittier Bridge/I-95 ... Final Environmental Impact Report - Whittier Bridge/I-95 ...
Whittier Bridge/I-95 Improvement Project FEIR Chapter 1.0: Changes Since the Draft Environmental Impact Report and Resolution of Additional Issues Figure 1-6: Project Phasing – Final Configuration 1-10
Whittier Bridge/I-95 Improvement Project FEIR Chapter 1.0: Changes Since the Draft Environmental Impact Report and Resolution of Additional Issues A bulleted listing of additional information submitted to date to the conservation commissions is presented below. Project Wide Numerous NOI and stormwater plan revisions were submitted which applied on a project-wide basis to all three communities: Plan entitled ―Compliance with New Development Recharge Requirements‖ dated January 23, 2012 provided to demonstrate percentage of site diverted to a recharge BMP; Plan entitled ―New Development Recharge Calculations‖ dated January 16, 2012 provided to demonstrate calculations for required recharge for new development for each soil type; Typical MassDOT drainage details (Infiltration Basin, Wet Basin, Detention Basin, Sediment Forebay, and Check Dams) submitted; Numerous Notice of Intent plan revisions including additional details on sedimentation and erosion control during construction and delineation of allowable work areas in the vicinity of wetland resources along the corridor; Revised ―Subsurface Test Pit Plans‖ dated January 25, 2012 (4 sheets total) depicting additional test pit locations; Numerous stormwater management plan revisions; Additional typical highway sections; ―New Development Recharge Calculations‖ dated January 16, 2012; ―Rip Rap Apron Sizing Summary‖ dated January 16, 2012; Revised Stormwater Report Figure 9 (revised scale); and Revised ―Water Quality Volume Calculations‖ dated January 16, 2012 for Infiltration Basin 4, Infiltration Basin 5, Infiltration Basin 6 and Wet Basin 7A. MassDOT also submitted a project-specific Operation and Maintenance Plan and Long Term Pollution Prevention Plan (Appendix A) to each conservation commission to demonstrate compliance with stormwater performance standard 9. Additional supplemental information has been provided individually to each of the conservation commissions in response to specific questions raised by the individual commission or the peer review consultant on behalf of the commission. The following listings detail the specific information provided to each commission. Newburyport Conservation Commission Supplemental information provided to Newburyport included the following plans and information: The NOI was revised to provide additional description of Wetland B in general and the resource characterization information in the ANRAD was included; The impacts to riverfront area were modified slightly and the plans for restoration of riverfront areas were developed; and 1-11
- Page 1: FINAL ENVIRONMENTAL IMPACT REPORT E
- Page 4 and 5: Whittier Bridge/I-95 Improvement Pr
- Page 6 and 7: Whittier Bridge/I-95 Improvement Pr
- Page 8 and 9: EEA#14427 DEIR Certificate December
- Page 10 and 11: EEA#14427 DEIR Certificate December
- Page 12 and 13: EEA#14427 DEIR Certificate December
- Page 14 and 15: EEA #14427 DEIR Certificate Decembe
- Page 16 and 17: EEA#l4427 DEIR Certificate December
- Page 18 and 19: EEA#14427 DEIR Certificate December
- Page 20 and 21: EEA#I4427 DEIR Certificate December
- Page 22 and 23: EEA #14427 DEIR Certificate Decembe
- Page 24 and 25: EEA#I4427 DEIR Certificate December
- Page 26 and 27: EEA#14427 DEIR Certificate December
- Page 28 and 29: EEA#14427 DEIR Certificate December
- Page 31 and 32: Whittier Bridge/I-95 Improvement Pr
- Page 33 and 34: Whittier Bridge/I-95 Improvement Pr
- Page 35 and 36: Whittier Bridge/I-95 Improvement Pr
- Page 37 and 38: Whittier Bridge/I-95 Improvement Pr
- Page 39: Whittier Bridge/I-95 Improvement Pr
- Page 43 and 44: Whittier Bridge/I-95 Improvement Pr
- Page 45 and 46: Whittier Bridge/I-95 Improvement Pr
- Page 47 and 48: Whittier Bridge/I-95 Improvement Pr
- Page 49 and 50: Whittier Bridge/I-95 Improvement Pr
- Page 51 and 52: Whittier Bridge/I-95 Improvement Pr
- Page 53 and 54: Whittier Bridge/I-95 Improvement Pr
- Page 55 and 56: Whittier Bridge/I-95 Improvement Pr
- Page 57 and 58: WETLAND E WETLAND F WETLAND G WETLA
- Page 59 and 60: Whittier Bridge/I-95 Improvement Pr
- Page 61 and 62: Whittier Bridge/I-95 Improvement Pr
- Page 63 and 64: Whittier Bridge/I-95 Improvement Pr
- Page 65 and 66: Whittier Bridge/I-95 Improvement Pr
- Page 67 and 68: Whittier Bridge/I-95 Improvement Pr
- Page 69 and 70: Whittier Bridge/I-95 Improvement Pr
- Page 71 and 72: Whittier Bridge/I-95 Improvement Pr
- Page 73 and 74: Whittier Bridge/I-95 Improvement Pr
- Page 75 and 76: Whittier Bridge/I-95 Improvement Pr
- Page 77 and 78: Whittier Bridge/I-95 Improvement Pr
- Page 79 and 80: Whittier Bridge/I-95 Improvement Pr
- Page 81 and 82: Whittier Bridge/I-95 Improvement Pr
- Page 83 and 84: Whittier Bridge/I-95 Improvement Pr
- Page 85 and 86: Whittier Bridge/I-95 Improvement Pr
- Page 87 and 88: Whittier Bridge/I-95 Improvement Pr
- Page 89: Whittier Bridge/I-95 Improvement Pr
<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />
Chapter 1.0: Changes Since the Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong> and Resolution of Additional Issues<br />
Figure 1-6:<br />
Project Phasing – <strong>Final</strong> Configuration<br />
1-10