Whittier Bridge/I‐95 Improvement Project Stormwater Management System Operation and Maintenance Plan (O&M) and Long Term Pollution Prevention Plan (LTPPP) January 2012 This Stormwater Management System Operation and Maintenance Plan provides for the inspection and maintenance of structural Best Management Practices (BMPs) and for measures to prevent pollution associated with the Whittier Bridge/I-95 Improvement Project in the municipalities of Amesbury, Newburyport, and Salisbury. This document has been prepared in accordance with the requirements of the Stormwater Regulations included in the Massachusetts Wetlands Protection Act Regulations (310 CMR 10). Responsible Party MassDOT District 4 office will be responsible for the maintenance of the roadway facilities and associated stormwater management features, in accordance with MassDOT standards. If the municipality is the responsible party, add the following: Questions or concerns regarding maintenance activities may also be addressed to MassDOT through its District 4 office, or in the event of emergency at the 24 Hour Transportation Operation Center: District [4] Office: 519 Appleton St. Arlington, MA 02476 Phone: (781) 641‐8300 Fax: (781) 646‐5115 24 Hour MassDOT Contact Information: 24 Hour Transportation Operation Center 1‐800‐227‐0608 Page | 1

<strong>Whittier</strong> <strong>Bridge</strong>/I‐<strong>95</strong> Improvement Project<br />

Stormwater Management System<br />

Operation and Maintenance Plan (O&M)<br />

and<br />

Long Term Pollution Prevention Plan (LTPPP)<br />

January 2012<br />

This Stormwater Management System Operation and Maintenance Plan provides for the<br />

inspection and maintenance of structural Best Management Practices (BMPs) and for measures<br />

to prevent pollution associated with the <strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project in the<br />

municipalities of Amesbury, Newburyport, and Salisbury.<br />

This document has been prepared in accordance with the requirements of the Stormwater<br />

Regulations included in the Massachusetts Wetlands Protection Act Regulations (310 CMR 10).<br />

Responsible Party<br />

MassDOT District 4 office will be responsible for the maintenance of the roadway facilities and<br />

associated stormwater management features, in accordance with MassDOT standards.<br />

If the municipality is the responsible party, add the following:<br />

Questions or concerns regarding maintenance activities may also be addressed to MassDOT<br />

through its District 4 office, or in the event of emergency at the 24 Hour Transportation<br />

Operation Center:<br />

District [4] Office:<br />

519 Appleton St.<br />

Arlington, MA 02476<br />

Phone: (781) 641‐8300<br />

Fax: (781) 646‐5115<br />

24 Hour MassDOT Contact Information:<br />

24 Hour Transportation Operation Center<br />

1‐800‐227‐0608<br />

Page | 1