Whittier Bridge/I-95 Improvement Project FEIR Chapter 3.0: Mitigation and Commitments New 6-Lane Bridge Alternative: This alternative would provide two new bridges, which would carry three lanes of traffic northbound and three lanes of traffic southbound, and the existing bridge would be demolished. New 8-Lane East – West Bridge Alternative: Under this alternative, two new four-lane bridges would be constructed to the east and west of the existing bridge. Traffic would then be transferred to the new bridges, and the existing bridge would be demolished. New 8-Lane East Bridge Alternative: This alternative would provide a new bridge to the east of the existing bridge, to which all traffic would be temporarily relocated. The existing Whittier Bridge would then be demolished, and a second new bridge would be constructed in its place. When construction is completed, the two new bridges would be configured to carry four lanes of traffic northbound and four lanes of traffic southbound. New 8-Lane West Bridge Alternative: This alternative is similar to the previous alternative, except a new bridge would be constructed to the west of the existing bridge. Highway Widening Alternatives Inside Highway Widening Alternative (Northern Terminus to Route 286): This alternative would begin at the Route 110 interchange and end at the Route 286 interchange. The alternative would widen the northbound and southbound barrels within the existing median. Outside Highway Widening Alternative (Northern Terminus to Route 286): This alternative would begin at the Route 110 interchange and end at the Route 286 interchange. This alternative would widen the northbound and southbound barrels to the outside of the existing highway. Inside Northbound/Outside Southbound Highway Widening Alternative (Northern Terminus to Route 286): This alternative would begin at the Route 110 interchange and end at the Route 286 interchange. This alternative would widen the northbound barrel into the existing median and widen the southbound barrel to the outside of the existing highway. Outside Northbound/Inside Southbound Highway Widening Alternative (Northern Terminus to Route 286): This alternative would also begin at the Route 110 interchange and end at the Route 286 interchange. This alternative would widen the northbound barrel to the outside of the existing highway and widen the southbound barrel into the existing median. Northern Terminus to Route 110 Highway Widening Alternative: This alternative would involve widening both the northbound and southbound barrels with a fourth lane to the outside of the existing highway between Route 110 and I-95. Evaluation Criteria The following engineering and environmental criteria were developed to screen the Merrimack River crossing and highway widening alternatives: Purpose and Need (how each alternative met the Purpose and Need); Highway Configuration (including horizontal alignment, vertical alignment and impacts to existing infrastructure); Bridge Configuration (including design standards/complexities, structural safety, constructability, context sensitive structures, maintenance and inspection and life cycle/cost); Traffic (including travel time, level of service, and capacity); 3-30
Whittier Bridge/I-95 Improvement Project FEIR Chapter 3.0: Mitigation and Commitments Right-of-Way (including fee taking, permanent easement and temporary/construction easement); Cost (the relative cost differences of each alternative considering constructability, site access, construction staging ease/restraints, traffic management, ease of demolition, and schedule impact because of extended construction); Construction (including utility relocation, constructability/demolition of existing structures, and maintenance of traffic during construction); Schedule (the relative difference between alternatives for the estimated construction schedule duration of each alternative); and Environmental (including stormwater [ability of each alternative to meet MassDEP stormwater performance standards], drinking water quality [the degree of impact on local drinking water supply protection areas], wetlands [total estimated impact to wetland resource areas within the project area], visual/viewpoints [the level of visual impact], historic [potential impact on the historic Whittier Bridge] and navigation [potential impacts to navigation on the Merrimack River]). After a thorough evaluation of the river crossing and highway widening alternatives, the New 8-Lane East Bridge River Crossing Alternative and the Inside Widening Highway Alternative (Northern Terminus to Route 286) were identified as the Preferred Alternative. This alternative best met the purpose and need, as well as highway configuration, traffic (capacity), bridge configuration (design standards, structural safety, maintenance and inspection, and life cycle/costs), construction (constructability), ROW, and environmental criteria. Impacts and Mitigation Two Bordering Vegetated Wetlands (BVW) would be directly affected by the proposed highway widening including Wetlands I and H in Amesbury. Total permanent impacts will be 3,560 square feet of BVW and total temporary impacts will be 1,400 square feet. BVW replication for permanent impacts will consist of expanding Wetland H in Amesbury by excavating approximately 4,960 square feet of upland at its northern end within the ROW. The proposed mitigation ratio for permanent impacts is 1.4:1 which exceeds the 1:1 ratio mandated under the Massachusetts Wetlands Regulations at 310 CMR 10.54(4)(b). Temporary impacts to BVW, as well as temporary impacts to isolated vegetated wetlands, will be mitigated by restoration of the impacted area after construction activities are completed. Isolated Vegetated Wetland (IVW): One IVW, Wetland M in Salisbury, will be temporarily impacted by the construction of detention basin 7A. Total temporary impacts are estimated at 240 square feet. The basin is located to the west of I-95 immediately south of the I-495 northbound overpass. Temporary alteration of Wetland M is assumed to be required for purposes of construction access and installation of inlet and outlet pipes for the detention basin. The impact areas will be restored after the completion of construction activities. Land Under Ocean (LUO): Construction of six piers for the proposed I-95 bridges would result in permanent and temporary impacts to LUO in the Merrimack River in Newburyport and Amesbury. The permanent impacts will be offset in part by removal of the four existing bridge piers and restoration of the river bottom. The new bridges would alter 17,100 square feet of river bottom habitat under state jurisdiction as Land Under the Ocean and Banks of or Land Under the Ocean, Ponds, Streams, Rivers, Lakes or Creeks that Underlie an Anadromous/Catadromous Fish Run. An additional 28,520 square feet of temporary impact to river bottom (LUO) would result from the 3-31
- Page 334 and 335: 63 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 336 and 337: 65 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 338 and 339: 67 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 340 and 341: 69 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 342 and 343: 71 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 344 and 345: 73 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 346 and 347: 75 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 348 and 349: 77 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 350 and 351: 79 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 352 and 353: 81 1 2 3 4 5 6 7 8 would appreciate
- Page 355 and 356: Whittier Bridge/I-95 Improvement Pr
- Page 357 and 358: Whittier Bridge/I-95 Improvement Pr
- Page 359 and 360: Whittier Bridge/I-95 Improvement Pr
- Page 361 and 362: Whittier Bridge/I-95 Improvement Pr
- Page 363 and 364: Whittier Bridge/I-95 Improvement Pr
- Page 365 and 366: Whittier Bridge/I-95 Improvement Pr
- Page 367 and 368: Whittier Bridge/I-95 Improvement Pr
- Page 369 and 370: Whittier Bridge/I-95 Improvement Pr
- Page 371 and 372: Whittier Bridge/I-95 Improvement Pr
- Page 373 and 374: Whittier Bridge/I-95 Improvement Pr
- Page 375 and 376: Whittier Bridge/I-95 Improvement Pr
- Page 377 and 378: Whittier Bridge/I-95 Improvement Pr
- Page 379 and 380: Whittier Bridge/I-95 Improvement Pr
- Page 381 and 382: Whittier Bridge/I-95 Improvement Pr
- Page 383: Whittier Bridge/I-95 Improvement Pr
- Page 387 and 388: Whittier Bridge/I-95 Improvement Pr
- Page 389 and 390: Whittier Bridge/I-95 Improvement Pr
- Page 391 and 392: Whittier Bridge/I-95 Improvement Pr
- Page 393: Whittier Bridge/I-95 Improvement Pr
- Page 397 and 398: Whittier Bridge/I‐95 Improvement
- Page 399 and 400: Spill Prevention and Response MassD
- Page 401: Appendix: Best Management Practices
- Page 405 and 406: The Commonwealth Of Massachusetts M
- Page 407 and 408: downstream of the existing bridge w
- Page 409 and 410: Appendix 1 - Tables 1, 2, and 3 Tab
- Page 411 and 412: Table 4. Summary of Model Simulatio
- Page 413: Whittier Bridge/I-95 Improvement Pr
- Page 416 and 417: process. If the project avoids simu
- Page 418 and 419: anadromous fish including American
- Page 420 and 421: Conclusions In summary, we recommen
<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />
Chapter 3.0: Mitigation and Commitments<br />
<br />
<br />
<br />
<br />
<br />
Right-of-Way (including fee taking, permanent easement and temporary/construction<br />
easement);<br />
Cost (the relative cost differences of each alternative considering constructability, site access,<br />
construction staging ease/restraints, traffic management, ease of demolition, and schedule<br />
impact because of extended construction);<br />
Construction (including utility relocation, constructability/demolition of existing structures, and<br />
maintenance of traffic during construction);<br />
Schedule (the relative difference between alternatives for the estimated construction schedule<br />
duration of each alternative); and<br />
<strong>Environmental</strong> (including stormwater [ability of each alternative to meet MassDEP stormwater<br />
performance standards], drinking water quality [the degree of impact on local drinking water<br />
supply protection areas], wetlands [total estimated impact to wetland resource areas within the<br />
project area], visual/viewpoints [the level of visual impact], historic [potential impact on the<br />
historic <strong>Whittier</strong> <strong>Bridge</strong>] and navigation [potential impacts to navigation on the Merrimack River]).<br />
After a thorough evaluation of the river crossing and highway widening alternatives, the New 8-Lane<br />
East <strong>Bridge</strong> River Crossing Alternative and the Inside Widening Highway Alternative (Northern<br />
Terminus to Route 286) were identified as the Preferred Alternative. This alternative best met the<br />
purpose and need, as well as highway configuration, traffic (capacity), bridge configuration (design<br />
standards, structural safety, maintenance and inspection, and life cycle/costs), construction<br />
(constructability), ROW, and environmental criteria.<br />
<strong>Impact</strong>s and Mitigation<br />
Two Bordering Vegetated Wetlands (BVW) would be directly affected by the proposed highway<br />
widening including Wetlands I and H in Amesbury. Total permanent impacts will be 3,560 square<br />
feet of BVW and total temporary impacts will be 1,400 square feet. BVW replication for permanent<br />
impacts will consist of expanding Wetland H in Amesbury by excavating approximately 4,960 square<br />
feet of upland at its northern end within the ROW. The proposed mitigation ratio for permanent<br />
impacts is 1.4:1 which exceeds the 1:1 ratio mandated under the Massachusetts Wetlands<br />
Regulations at 310 CMR 10.54(4)(b). Temporary impacts to BVW, as well as temporary impacts to<br />
isolated vegetated wetlands, will be mitigated by restoration of the impacted area after construction<br />
activities are completed.<br />
Isolated Vegetated Wetland (IVW): One IVW, Wetland M in Salisbury, will be temporarily impacted<br />
by the construction of detention basin 7A. Total temporary impacts are estimated at 240 square<br />
feet. The basin is located to the west of I-<strong>95</strong> immediately south of the I-4<strong>95</strong> northbound overpass.<br />
Temporary alteration of Wetland M is assumed to be required for purposes of construction access<br />
and installation of inlet and outlet pipes for the detention basin. The impact areas will be restored<br />
after the completion of construction activities.<br />
Land Under Ocean (LUO): Construction of six piers for the proposed I-<strong>95</strong> bridges would result in<br />
permanent and temporary impacts to LUO in the Merrimack River in Newburyport and Amesbury.<br />
The permanent impacts will be offset in part by removal of the four existing bridge piers and<br />
restoration of the river bottom. The new bridges would alter 17,100 square feet of river bottom<br />
habitat under state jurisdiction as Land Under the Ocean and Banks of or Land Under the Ocean,<br />
Ponds, Streams, Rivers, Lakes or Creeks that Underlie an Anadromous/Catadromous Fish Run. An<br />
additional 28,520 square feet of temporary impact to river bottom (LUO) would result from the<br />
3-31