71 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 very long. One of the issues here is a shared use path needs to meet appropriate grades for Americans with Disabilities Act, so basically all these are very low -- low gradients to allow people of any ability to be able to get out and walk on them and enjoy them. MR. WEBB: Well, I do know that sound refracts; it doesn't go in a straight line. And as high as these barriers are, I have serious doubts as to how much impact they're really going to have on the sound. Okay. MR. PAVAO: Yes, sir. MR. POSNER: Thank you. My name is Bill Posner. I'm a member of the board of the Massachusetts Bicycle Coalition, it's Mass. Bike, and we will be submitting written comments with respect to the EADEIR. I'm also a member of a local cycling club, North Shore Cyclists. First of all, I would like to thank Mass. DOT for demonstrating its commitment to cycling and walking as well as its commitment to the Healthy Transportation Compact and the Green Dot policy. I'd also like to thank the Towns of Amesbury, Salisbury and the City of Newburyport for recognizing the economic and recreational benefits of cycling and walking as well as their support for the inclusion of ATM, Inc 339-674-9100
72 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 the shared use path as what we consider to be a signature design element in this proposal. Our very brief comment is that we are very much in support of this project and we appreciate Mass. DOT's consistent support for cycling and walking. Thank you. MR. PAVAO: Thank you for your comments. Yes, sir. MR. KARP: Hi. Evan Karp from Newburyport. I live alongside the Pine Road, Ferry Road Bridge there. It was mentioned that the bridge is moving back to where it was in the seventies or something. I was just curious what that was, just curious how it affects my house. MR. BERTOULIS: The right of way that's out there today, it will work within the existing right of way. What's going to happen there, I have a slide which would show it, but basically, you know, the existing bridge today is on a radius, and what's going to happen first thing out there is that the traffic on the existing bridge is going to be restricted to a one-lane (inaudible) operated by signals and that will allow one half of the bridge to be demolished. That'll be the southern inside radius. That lane will ATM, Inc 339-674-9100
- Page 292 and 293: 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 294 and 295: 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 296 and 297: 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 298 and 299: 27 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 300 and 301: 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 302 and 303: 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 304 and 305: 33 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 306 and 307: 35 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 308 and 309: 37 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 310 and 311: 39 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 312 and 313: 41 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 314 and 315: 43 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 316 and 317: 45 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 318 and 319: 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 320 and 321: 49 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 322 and 323: 51 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 324 and 325: 53 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 326 and 327: 55 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 328 and 329: 57 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 330 and 331: 59 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 332 and 333: 61 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 334 and 335: 63 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 336 and 337: 65 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 338 and 339: 67 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 340 and 341: 69 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 344 and 345: 73 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 346 and 347: 75 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 348 and 349: 77 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 350 and 351: 79 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 352 and 353: 81 1 2 3 4 5 6 7 8 would appreciate
- Page 355 and 356: Whittier Bridge/I-95 Improvement Pr
- Page 357 and 358: Whittier Bridge/I-95 Improvement Pr
- Page 359 and 360: Whittier Bridge/I-95 Improvement Pr
- Page 361 and 362: Whittier Bridge/I-95 Improvement Pr
- Page 363 and 364: Whittier Bridge/I-95 Improvement Pr
- Page 365 and 366: Whittier Bridge/I-95 Improvement Pr
- Page 367 and 368: Whittier Bridge/I-95 Improvement Pr
- Page 369 and 370: Whittier Bridge/I-95 Improvement Pr
- Page 371 and 372: Whittier Bridge/I-95 Improvement Pr
- Page 373 and 374: Whittier Bridge/I-95 Improvement Pr
- Page 375 and 376: Whittier Bridge/I-95 Improvement Pr
- Page 377 and 378: Whittier Bridge/I-95 Improvement Pr
- Page 379 and 380: Whittier Bridge/I-95 Improvement Pr
- Page 381 and 382: Whittier Bridge/I-95 Improvement Pr
- Page 383 and 384: Whittier Bridge/I-95 Improvement Pr
- Page 385 and 386: Whittier Bridge/I-95 Improvement Pr
- Page 387 and 388: Whittier Bridge/I-95 Improvement Pr
- Page 389 and 390: Whittier Bridge/I-95 Improvement Pr
- Page 391 and 392: Whittier Bridge/I-95 Improvement Pr
72<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
the shared use path as what we consider to be a<br />
signature design element in this proposal.<br />
Our very brief comment is that we are very much<br />
in support of this project and we appreciate Mass.<br />
DOT's consistent support for cycling and walking.<br />
Thank you.<br />
MR. PAVAO: Thank you for your comments. Yes,<br />
sir.<br />
MR. KARP: Hi. Evan Karp from Newburyport. I<br />
live alongside the Pine Road, Ferry Road <strong>Bridge</strong> there.<br />
It was mentioned that the bridge is moving back to<br />
where it was in the seventies or something. I was<br />
just curious what that was, just curious how it<br />
affects my house.<br />
MR. BERTOULIS: The right of way that's out there<br />
today, it will work within the existing right of way.<br />
What's going to happen there, I have a slide which<br />
would show it, but basically, you know, the existing<br />
bridge today is on a radius, and what's going to<br />
happen first thing out there is that the traffic on<br />
the existing bridge is going to be restricted to a<br />
one-lane (inaudible) operated by signals and that will<br />
allow one half of the bridge to be demolished.<br />
That'll be the southern inside radius. That lane will<br />