27.01.2015 Views

Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

70<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

the same time.<br />

MR. WEBB: Off the top of your head do you know<br />

how high the wall is closer to the -- you know, the<br />

start of the wall on the other side of the river It<br />

looked like it's considerably higher.<br />

MR. BERTOULIS: The roadway in this area is about<br />

six foot higher when it touches down than it is today.<br />

By the time it gets up to Evans Place, it meets the<br />

existing grade and that's part of the design in terms<br />

of moving the high point of the bridge to basically<br />

get it in the middle of the arch and for drainage<br />

purposes and how the whole area works. And that's<br />

part of the design.<br />

MR. WEBB: I was referring to opposite Laurel<br />

Road, the Laurel Street.<br />

MR. BERTOULIS: Oh, that other wall that comes<br />

down<br />

MR. WEBB: Yeah. It looks like it slopes down.<br />

MR. BERTOULIS: That is basically -- and it was<br />

Mr. Port from Newburyport addressed it. The shared<br />

use path, there's also a connection point besides at<br />

the Park and Ride at Pine Ferry Road area from the<br />

Upland area. It's like an on ramp from the street<br />

surface getting to the shared use path. Now, it is<br />