<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 1.0: Changes Since the Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong> and Resolution of Additional Issues<br />

1.0 Changes Since the Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong><br />

and Resolution of Additional Issues<br />

1.1 PROJECT INFORMATION<br />

Project Name: <strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project<br />

EOEA File No: 14427<br />

Project Location: Newburyport, Amesbury and Salisbury<br />

Project Proponent: Massachusetts Department of Transportation – Highway Division (MassDOT)<br />

This document serves as the <strong>Final</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong> (FEIR) under the Massachusetts<br />

<strong>Environmental</strong> Policy Act (MEPA).<br />

This FEIR responds to the Certificate of the Secretary of Energy and <strong>Environmental</strong> Affairs on the<br />

<strong>Environmental</strong> Assessment/Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong> (EA/DEIR), issued on December 30,<br />

2011. The Secretary will publish notice of the availability of the FEIR in the <strong>Environmental</strong> Monitor<br />

and a 30-day public comment period will ensue upon the date of publication (March 7, 2012).<br />

Subsequently, the Secretary will issue a Certificate stating whether the FEIR ―adequately and<br />

properly complies with MEPA‖. A Secretarial finding that the FEIR adequately and properly complies<br />

with MEPA will conclude the MEPA review process for the project.<br />

1.2 PERMITS AND APPROVALS REQUIRED<br />

Since the filing of the EA/DEIR, MassDOT has initiated the environmental permitting process for the<br />

project. Table 1-1 lists the permits and approvals and the current status.<br />

Table 1-1:<br />

List of Permits and Approvals<br />

Permit/Approval<br />

National Pollutant Discharge Elimination System Massachusetts General<br />

Permit for Construction Stormwater Discharges under the Clean Water Act<br />

from the U.S. <strong>Environmental</strong> Protection Agency, Region 1<br />

Section 9 <strong>Bridge</strong> Permit under the Rivers and Harbors Act of 1899 from the<br />

U.S. Coast Guard to construct bridges and demolish the existing <strong>Whittier</strong><br />

<strong>Bridge</strong> over the Merrimack River<br />

U.S. Army Category 2 Massachusetts General Permit authorization under<br />

Section 404 of the Clean Water Act from the U.S. Army Corps of Engineers<br />

NEPA Approval from Federal Highway Administration<br />

Section 401 Water Quality Certification under the federal Clean Water Act<br />

from the Massachusetts Department of <strong>Environmental</strong> Protection (MassDEP)<br />

Chapter 91 Waterways License under Massachusetts General Laws Chapter<br />

91, the Public Waterways Act, from the MassDEP for construction of new<br />

bridges over the Merrimack River<br />

Federal Consistency Determination under the federal Coastal Zone<br />

Management Act from the Massachusetts Office of Coastal Zone Management<br />

Orders of Conditions under the Massachusetts Wetlands Protection Act from<br />

the Newburyport, Amesbury, and Salisbury Conservation Commissions<br />

Status<br />

Will be applied for prior to start of<br />

construction<br />

Application filed: August 29, 2011<br />

Anticipated Issuance: July 2012<br />

Application filed: November 15, 2011<br />

Anticipated Issuance: May 2012<br />

Finding of No Significant <strong>Impact</strong> (FONSI)<br />

issued January 20, 2012<br />

Application filed: December 6, 2011<br />

Anticipated Issuance: May 2012<br />

Application filed: November 15, 2011<br />

Anticipated Issuance: June 2012<br />

Application Filed: November 16, 2011<br />

Anticipated Issuance: July 2012<br />

Applications Filed: December 1, 2011<br />

Anticipated Issuance: March 2012<br />

1-1