27.01.2015 Views

Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

The Pine Hill <strong>Bridge</strong> will be rebuilt, <strong>Whittier</strong><br />

<strong>Bridge</strong> will be rebuilt, the Evans Place <strong>Bridge</strong> will be<br />

rebuilt -- that's a 4<strong>95</strong> structure -- and will be<br />

widening out the bridges over Route 110 and the Exit<br />

58 area, both the highway bridge and the bridges over<br />

the railroad because we are preserving the corridor<br />

for the future tie-in of the Powow Trail into the<br />

Salisbury Ghost Trail network.<br />

One other element we're doing, we found the<br />

opportunity to basically create a north south crossing<br />

for the shared use path, that being our alternate<br />

transportation connection. Some of the views up top<br />

represent what it looks like at the -- potentially at<br />

the Park and Ride, also at the other head of trail<br />

location up off Old Merrill Street, and then basically<br />

an opportunity for an overlook on the bridge itself.<br />

So that is -- I just ran through the bridges that<br />

we're looking at. We have two I-<strong>95</strong> bridges that we're<br />

replacing. We have two I-<strong>95</strong> bridges, both southbound<br />

and northbound, that we're widening, and then one<br />

bridge over which is the Pine Hill <strong>Bridge</strong>.<br />

This graphic, you'll see more of it when I do the<br />

visualization, is a good snapshot. It shows you one<br />

of the driving issues that we have for the bridge and<br />

ATM, Inc<br />

339-674-9100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!